| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$58,020.00 |
$78,400.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 37,575 | CY |
$12.00 |
$10.10 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 4,651 | CY |
$14.00 |
$13.45 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$150,000.00 |
$151,200.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,975 | LF |
$5.25 |
$4.40 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,414 | LF |
$8.90 |
$17.85 |
| 70 | 229 6100 |
DITCH LINER PROTECTION | 2,230 | LF |
$12.79 |
$6.05 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 283,143 | SY |
$4.00 |
$3.95 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 58.5 | AC |
$1,150.00 |
$1,960.00 |
| 100 | 241 3100 |
MOWING | 56.63 | AC |
$150.00 |
$442.40 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 46,716 | SY |
$7.00 |
$7.55 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 164 | TON |
$50.00 |
$72.80 |
| 130 | 407(A)7200 |
FOG SEAL | 802 | GAL |
$6.45 |
$7.45 |
| 140 | 407(B)7300 |
TACK COAT | 15,911 | GAL |
$3.15 |
$5.65 |
| 150 | 408 8100 |
PRIME COAT | 18,150 | GAL |
$3.50 |
$5.50 |
| 160 | 409(A)9200 |
FABRIC REINFORCEMENT | 16,038 | SY |
$2.00 |
$5.55 |
| 170 | 409(B)9300 |
BITUMINOUS BINDER | 3,208 | GAL |
$2.25 |
$4.40 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 27,700 | TON |
$110.00 |
$119.95 |
| 190 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 9,643 | TON |
$125.00 |
$149.60 |
| 200 | 412 3100 |
COLD MILLING PAVEMENT | 48,112 | SY |
$4.35 |
$3.50 |
| 210 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 57 | CY |
$7.00 |
$33.60 |
| 220 | 509(A)0200 |
CLASS AA CONCRETE | 325 | CY |
$1,000.00 |
$830.00 |
| 230 | 509(D)0500 |
CLASS C CONCRETE | 404 | CY |
$400.00 |
$487.00 |
| 240 | 511(A)2200 |
REINFORCING STEEL | 47,824 | LB |
$1.50 |
$1.70 |
| 250 | 613(A)5268 |
24" R.C.PIPE CLASS IV | 148 | LF |
$136.00 |
$168.00 |
| 260 | 613(A)5272 |
30" R.C.PIPE CLASS IV | 58 | LF |
$140.00 |
$196.00 |
| 270 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 151 | LF |
$35.00 |
$61.60 |
| 280 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 18 | LF |
$47.00 |
$72.80 |
| 290 | 613(B)5608 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 24 | LF |
$44.00 |
$78.40 |
| 300 | 613(L)6614 |
24" X 18" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$44.00 |
$308.00 |
| 310 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 5 | EA |
$1,550.00 |
$1,960.00 |
| 320 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$2,800.00 |
$2,822.00 |
| 330 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 6 | EA |
$1,150.00 |
$2,195.00 |
| 340 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 1 | EA |
$1,900.00 |
$2,660.00 |
| 350 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$49,510.00 |
$58,800.00 |
| 360 | 619(B)6300 |
REMOVAL OF HEADWALL | 6 | EA |
$950.00 |
$728.00 |
| 370 | 619(B)6352 |
REMOVAL OF FENCE | 20,106 | LF |
$2.00 |
$1.10 |
| 380 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 10,210 | SY |
$7.00 |
$7.30 |
| 390 | 619(C)6600 |
SAWING PAVEMENT | 38,316 | LF |
$3.35 |
$4.20 |
| 400 | 624(A)3200 |
FENCE-STYLE WWF | 163 | LF |
$5.75 |
$8.40 |
| 410 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 843 | LF |
$4.90 |
$6.60 |
| 420 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 8,320 | LF |
$5.20 |
$6.65 |
| 430 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$176.00 |
$336.00 |
| 440 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$50.00 |
$56.00 |
| 450 | 629(E)7600 |
MAILBOX | 2 | EA |
$45.00 |
$44.80 |
| 460 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 900 | CY |
$15.00 |
$33.60 |
| 470 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 120 | CY |
$35.00 |
$30.80 |
| 480 | 509(A)0210 |
CLASS AA CONCRETE | 339.4 | CY |
$750.00 |
$676.30 |
| 490 | 511(A)2210 |
REINFORCING STEEL | 58,290 | LB |
$1.65 |
$1.65 |
| 500 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$30,000.00 |
$50,866.00 |
| 510 | 413(F)4700 |
SINUSOIDAL RUMBLE STRIP | 56,250 | LF |
$2.00 |
$0.4000 |
| 520 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,500.00 |
$2,240.00 |
| 530 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 131 | SF |
$26.00 |
$72.80 |
| 540 | 851(C)2415 |
2" SQUARE TUBE POST | 310 | LF |
$10.00 |
$8.95 |
| 550 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 49,299 | LF |
$0.9000 |
$1.25 |
| 560 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 104 | LF |
$11.00 |
$11.75 |
| 570 | 805(C)3400 |
(PL)RELOC. OF PORT.CHANGEABLE MSG.SIGN | 4 | EA |
$100.00 |
$560.00 |
| 580 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 300 | SD |
$110.00 |
$117.60 |
| 590 | 854(A)6200 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 432 | LF |
$1.50 |
$4.50 |
| 600 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 432 | LF |
$1.00 |
$10.10 |
| 610 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 300 | SD |
$15.00 |
$19.00 |
| 620 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 420 | SD |
$30.00 |
$11.20 |
| 630 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$30.00 |
$26.05 |
| 640 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,500 | LF |
$6.00 |
$3.65 |
| 650 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,380 | SD |
$1.25 |
$0.1500 |
| 660 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,680 | SD |
$4.00 |
$3.75 |
| 670 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,960 | SD |
$4.00 |
$3.75 |
| 680 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 9,360 | SD |
$0.5000 |
$0.0200 |
| 690 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 3,000 | SD |
$0.7000 |
$0.1100 |
| 700 | 880(F)6700 |
DRUMS | 3,000 | SD |
$0.8000 |
$0.3500 |
| 710 | 880(G)6800 |
TUBE CHANNELIZERS | 36,090 | SD |
$0.1500 |
$1.10 |
| 720 | 880(I)7000 |
FLAGGER | 420 | SD |
$50.00 |
$117.00 |
| 730 | 882(A)8200 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$20,000.00 |
$24,360.00 |
| 740 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$76,152.20 |
$72,240.00 |
| 750 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$40,000.00 |
| 760 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$341,447.97 |
$499,000.00 |