| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 59,864 | CY |
$10.00 |
$6.00 |
$10.00 |
$11.03 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 70,812 | CY |
$12.00 |
$9.50 |
$14.50 |
$16.17 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 10,990 | LF |
$2.80 |
$3.10 |
$2.95 |
$3.10 |
| 40 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 16 | EA |
$250.00 |
$519.75 |
$495.00 |
$520.81 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 98 | LF |
$15.00 |
$17.80 |
$16.95 |
$17.83 |
| 60 | 221(G)2800 |
TEMPORARY FIBER LOG | 98 | LF |
$8.00 |
$7.30 |
$6.95 |
$7.31 |
| 70 | 229 6100 |
DITCH LINER PROTECTION | 1,906 | LF |
$4.00 |
$1.84 |
$1.75 |
$1.84 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 125,802 | SY |
$3.00 |
$2.89 |
$2.75 |
$2.89 |
| 90 | 241 3100 |
MOWING | 26 | AC |
$225.00 |
$278.25 |
$265.00 |
$278.82 |
| 100 | 307(K)4200 |
STABILIZED SUBGRADE | 58,929 | SY |
$6.00 |
$9.74 |
$7.00 |
$6.87 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 200 | TON |
$26.00 |
$85.00 |
$42.00 |
$44.41 |
| 120 | 407(B)7300 |
TACK COAT | 2,980 | GAL |
$3.00 |
$4.20 |
$4.00 |
$4.21 |
| 130 | 408 8100 |
PRIME COAT | 21,515 | GAL |
$5.00 |
$5.25 |
$5.00 |
$5.26 |
| 140 | 411(B)1300 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 1,007 | TON |
$120.00 |
$126.00 |
$120.00 |
$126.26 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 14,168 | TON |
$100.00 |
$105.00 |
$100.00 |
$105.21 |
| 160 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 672 | TON |
$150.00 |
$157.50 |
$150.00 |
$157.82 |
| 170 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 380 | TON |
$150.00 |
$147.00 |
$140.00 |
$147.30 |
| 180 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 1,311 | LF |
$0.4500 |
$4.20 |
$1.63 |
$1.65 |
| 190 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 41,948 | SY |
$25.00 |
$25.86 |
$25.62 |
$20.78 |
| 200 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 10,286 | CY |
$200.00 |
$185.27 |
$183.51 |
$163.51 |
| 210 | 501(G)1810 |
CLSM BACKFILL | 65 | CY |
$180.00 |
$645.75 |
$639.60 |
$647.07 |
| 220 | 509(A)0200 |
CLASS AA CONCRETE | 606 | CY |
$650.00 |
$635.25 |
$492.00 |
$1,015.50 |
| 230 | 509(D)0500 |
CLASS C CONCRETE | 226 | CY |
$500.00 |
$362.25 |
$407.25 |
$822.49 |
| 240 | 511(A)2200 |
REINFORCING STEEL | 73,579 | LB |
$1.50 |
$1.31 |
$1.50 |
$1.25 |
| 250 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 280 | TON |
$45.00 |
$75.60 |
$85.00 |
$85.31 |
| 260 | 609(A)4270 |
CONC.CURB(8" BARRIER-INTEGRAL) | 9,735 | LF |
$7.00 |
$9.58 |
$9.48 |
$6.43 |
| 270 | 610(A)5210 |
5" CONCRETE SIDEWALK | 2,341 | SY |
$65.00 |
$76.68 |
$75.95 |
$65.57 |
| 280 | 610(B)5320 |
8" CONCRETE DRIVEWAY | 5,515 | SY |
$70.00 |
$78.03 |
$77.28 |
$65.66 |
| 290 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 540 | SF |
$30.00 |
$33.74 |
$33.42 |
$39.22 |
| 300 | 611(A)7210 |
MANHOLE (4' DIA.) | 1 | EA |
$3,200.00 |
$3,743.25 |
$3,357.24 |
$2,942.37 |
| 310 | 611(A)7215 |
MANHOLE (5' DIA.) | 1 | EA |
$3,300.00 |
$4,494.00 |
$5,387.40 |
$4,100.01 |
| 320 | 611(A)7220 |
MANHOLE (6' DIA.) | 1 | EA |
$4,000.00 |
$5,643.75 |
$7,882.50 |
$5,535.41 |
| 330 | 611(B)7305 |
ADD'L.DEPTH IN MANHOLE (5' DIA.) | 0.55 | VF |
$275.00 |
$367.51 |
$853.56 |
$471.49 |
| 340 | 611(B)7310 |
ADD'L.DEPTH IN MANHOLE (6' DIA.) | 8.95 | VF |
$350.00 |
$640.50 |
$713.96 |
$646.28 |
| 350 | 611(G)7754 |
INLET CI DES. 2 (STD) | 1 | EA |
$4,300.00 |
$4,987.50 |
$6,746.24 |
$4,242.31 |
| 360 | 611(G)7758 |
INLET CI DES. 2 (B) | 6 | EA |
$4,800.00 |
$6,520.50 |
$9,181.84 |
$5,348.84 |
| 370 | 611(G)7770 |
INLET CI DES. 2 (2B) | 1 | EA |
$5,000.00 |
$8,426.25 |
$12,227.64 |
$6,456.75 |
| 380 | 611(G)8102 |
INLET CDI 30SK RCB DES. 9 | 1 | EA |
$4,200.00 |
$4,882.50 |
$6,256.78 |
$8,971.12 |
| 390 | 611(G)9008 |
INLET CDI RCP DES. 3 | 2 | EA |
$2,900.00 |
$2,740.50 |
$2,582.30 |
$3,104.12 |
| 400 | 611(G)9012 |
INLET CDI RCP DES. 4 | 1 | EA |
$2,700.00 |
$4,331.25 |
$4,531.28 |
$3,714.95 |
| 410 | 611(G)9016 |
INLET CDI RCP DES. 5 | 3 | EA |
$3,900.00 |
$5,754.00 |
$7,350.00 |
$4,587.55 |
| 420 | 611(G)9020 |
INLET CDI RCP DES. 6 | 2 | EA |
$4,100.00 |
$6,226.50 |
$7,784.00 |
$5,361.60 |
| 430 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 3 | VF |
$198.00 |
$630.00 |
$751.20 |
$390.13 |
| 440 | 611(H)0688 |
ADD'L DEPTH IN INLET CDI RCP DES. 3 | 1.02 | VF |
$300.00 |
$430.50 |
$427.90 |
$551.20 |
| 450 | 611(H)0692 |
ADD'L DEPTH IN INLET CDI RCP DES. 4 | 2.08 | VF |
$400.00 |
$714.00 |
$754.44 |
$589.07 |
| 460 | 611(H)0696 |
ADD'L DEPTH IN INLET CDI RCP DES. 5 | 16.75 | VF |
$550.00 |
$798.00 |
$909.40 |
$619.70 |
| 470 | 611(H)0700 |
ADD'L DEPTH IN INLET CDI RCP DES. 6 | 19.4 | VF |
$600.00 |
$850.50 |
$934.36 |
$650.33 |
| 480 | 613(A)5208 |
18" R.C.PIPE CLASS III | 63 | LF |
$70.00 |
$84.84 |
$137.90 |
$79.80 |
| 490 | 613(A)5216 |
24" R.C.PIPE CLASS III | 459 | LF |
$100.00 |
$146.58 |
$167.38 |
$87.50 |
| 500 | 613(A)5220 |
30" R.C.PIPE CLASS III | 313 | LF |
$150.00 |
$156.66 |
$182.62 |
$136.28 |
| 510 | 613(A)5224 |
36" R.C.PIPE CLASS III | 283 | LF |
$150.00 |
$191.10 |
$211.61 |
$174.13 |
| 520 | 613(A)5228 |
42" R.C.PIPE CLASS III | 985 | LF |
$200.00 |
$331.54 |
$292.03 |
$236.65 |
| 530 | 613(A)5232 |
48" R.C.PIPE CLASS III | 631 | LF |
$200.00 |
$386.66 |
$371.89 |
$230.45 |
| 540 | 613(A)5236 |
54" R.C.PIPE CLASS III | 400 | LF |
$240.00 |
$418.43 |
$393.53 |
$338.38 |
| 550 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 15 | LF |
$45.00 |
$96.60 |
$75.00 |
$410.84 |
| 560 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 7 | EA |
$825.00 |
$1,968.75 |
$1,661.19 |
$2,063.01 |
| 570 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,100.00 |
$2,614.50 |
$2,182.32 |
$2,335.84 |
| 580 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,000.00 |
$3,123.75 |
$2,672.13 |
$4,107.64 |
| 590 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,500.00 |
$5,381.25 |
$4,598.00 |
$5,857.69 |
| 600 | 613(L)6740 |
54" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$4,000.00 |
$6,489.00 |
$5,338.00 |
$7,754.85 |
| 610 | 613(W)8155 |
72" JACKED CONDUIT | 175 | LF |
$3,000.00 |
$2,766.23 |
$2,870.00 |
$2,278.67 |
| 620 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$33,000.00 |
$17,377.50 |
$80,000.00 |
$112,601.50 |
| 630 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 100 | LF |
$10.00 |
$20.48 |
$15.00 |
$8.05 |
| 640 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 35,349 | SY |
$5.00 |
$5.18 |
$6.00 |
$7.36 |
| 650 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 600 | LF |
$4.00 |
$5.25 |
$9.00 |
$2.53 |
| 660 | 622(A)0220 |
2" PIPE RAILING | 196 | LF |
$100.00 |
$119.47 |
$218.00 |
$229.78 |
| 670 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 628 | LF |
$6.60 |
$11.55 |
$11.44 |
$12.63 |
| 680 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 320 | CY |
$35.00 |
$31.99 |
$35.00 |
$36.50 |
| 690 | 501(F)1700 |
GRANULAR BACKFILL | 63 | CY |
$60.00 |
$78.52 |
$60.00 |
$50.83 |
| 700 | 501(G)1800 |
CLSM BACKFILL | 455 | CY |
$200.00 |
$178.70 |
$200.00 |
$152.16 |
| 710 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$220,000.00 |
$36,111.60 |
$125,000.00 |
$35,083.11 |
| 720 | 504(A)5200 |
APPROACH SLAB | 593.4 | SY |
$275.00 |
$350.00 |
$225.00 |
$326.26 |
| 730 | 504(B)5300 |
SAW-CUT GROOVING | 2,973.8 | SY |
$5.00 |
$4.83 |
$4.60 |
$4.84 |
| 740 | 504(E)5500 |
CONCRETE PARAPET | 183.2 | LF |
$150.00 |
$195.00 |
$150.00 |
$230.74 |
| 750 | 504(E)5520 |
42" F-SHAPED PARAPET | 723.4 | LF |
$125.00 |
$100.00 |
$125.00 |
$124.36 |
| 760 | 506(A)7200 |
STRUCTURAL STEEL | 703,110 | LB |
$3.00 |
$2.50 |
$2.95 |
$2.85 |
| 770 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 24 | EA |
$3,500.00 |
$2,993.20 |
$3,000.00 |
$3,153.00 |
| 780 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 72 | EA |
$3,500.00 |
$2,765.70 |
$3,000.00 |
$3,177.43 |
| 790 | 509 0110 |
SPECIAL CONCRETE FINISH | 1 | LSUM |
$125,000.00 |
$140,206.92 |
$133,530.40 |
$140,492.68 |
| 800 | 509(A)0210 |
CLASS AA CONCRETE | 878.9 | CY |
$650.00 |
$900.00 |
$700.00 |
$825.37 |
| 810 | 509(B)0320 |
CLASS A CONCRETE | 570 | CY |
$650.00 |
$918.88 |
$650.00 |
$801.90 |
| 820 | 510(C)1450 |
SLOPE WALL (5") | 3,449.6 | SY |
$125.00 |
$129.50 |
$115.00 |
$139.88 |
| 830 | 510(D)1500 |
GRAFFITI TREATMENT | 22,363 | SF |
$2.00 |
$2.21 |
$2.10 |
$2.21 |
| 840 | 511 2100 |
MECHANICAL SPLICES | 1,942 | EA |
$45.00 |
$38.01 |
$45.00 |
$39.03 |
| 850 | 511(A)2210 |
REINFORCING STEEL | 4,860 | LB |
$1.60 |
$1.24 |
$1.50 |
$1.55 |
| 860 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 296,680 | LB |
$1.75 |
$1.44 |
$1.75 |
$1.78 |
| 870 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 1,038 | LF |
$50.00 |
$65.53 |
$60.00 |
$66.95 |
| 880 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 1,038 | LF |
$25.00 |
$29.59 |
$18.00 |
$29.59 |
| 890 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 900 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,144 | SY |
$5.00 |
$4.73 |
$4.50 |
$4.73 |
| 910 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 378 | LF |
$1,000.00 |
$1,200.00 |
$1,000.00 |
$1,554.95 |
| 920 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$5,000.00 |
$2,677.50 |
$5,000.00 |
$2,244.56 |
| 930 | 518(B)0300 |
SEALED EXPANSION JOINTS | 88.4 | LF |
$450.00 |
$357.97 |
$450.00 |
$456.20 |
| 940 | 523(A)3200 |
SEALER CRACK PREPARATION | 536.1 | LF |
$5.00 |
$4.20 |
$4.00 |
$4.21 |
| 950 | 523(B)3300 |
SEALER RESIN | 6.5 | GAL |
$120.00 |
$231.00 |
$220.00 |
$231.47 |
| 960 | 535 7160 |
ORNAMENTAL MEDALLION | 6 | EA |
$15,000.00 |
$13,970.72 |
$14,000.00 |
$17,451.01 |
| 970 | 542 9100 |
(PL)INSTALLATION OF BRIDGE ITEMS | 1 | LSUM |
$150,000.00 |
$61,425.00 |
$100,000.00 |
$180,759.04 |
| 980 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 41.2 | SY |
$65.00 |
$422.97 |
$65.00 |
$76.45 |
| 990 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 664 | LF |
$35.00 |
$37.95 |
$35.00 |
$39.60 |
| 1,000 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 293 | LF |
$35.00 |
$33.85 |
$35.00 |
$60.71 |
| 1,010 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$300,000.00 |
$100,500.00 |
$200,000.00 |
$179,739.69 |
| 1,020 | 802(A)0200 |
3/4" GALV.STEEL ELECT.COND. EXPOSED | 75 | LF |
$20.00 |
$32.55 |
$32.24 |
$32.62 |
| 1,030 | 802(A)0240 |
2" GALV.STEEL ELECT.COND. EXPOSED | 810 | LF |
$40.00 |
$48.83 |
$48.36 |
$48.92 |
| 1,040 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 2,475 | LF |
$30.00 |
$47.25 |
$46.80 |
$47.35 |
| 1,050 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 13,500 | LF |
$10.00 |
$21.00 |
$20.80 |
$21.04 |
| 1,060 | 802(E)0620 |
JUNCTION BOX (12"X12"X8") | 2 | EA |
$1,100.00 |
$2,677.50 |
$2,652.00 |
$2,682.96 |
| 1,070 | 803(A)1210 |
PULL BOX(SIZE I) | 6 | EA |
$1,000.00 |
$2,152.50 |
$2,132.00 |
$2,156.89 |
| 1,080 | 804(A)2200 |
STRUCTURAL CONCRETE | 121.36 | CY |
$1,500.00 |
$1,260.00 |
$1,248.00 |
$1,262.57 |
| 1,090 | 804(B)2300 |
REINFORCING STEEL | 21,016 | LB |
$2.00 |
$2.63 |
$2.60 |
$2.63 |
| 1,100 | 805(A)3228 |
(PL)REMOVAL OF LIGHT POLE | 21 | EA |
$450.00 |
$525.00 |
$520.00 |
$526.07 |
| 1,110 | 806(C)4512 |
40' MTG & 10' HLMA(G.STL.) | 76 | EA |
$3,900.00 |
$5,827.50 |
$5,772.00 |
$5,839.38 |
| 1,120 | 807 5120 |
BREAKAWAY BASE (DES. B) | 74 | EA |
$835.00 |
$1,102.50 |
$1,092.00 |
$1,104.75 |
| 1,130 | 809(A)7200 |
ROADWAY LUMINAIRE | 76 | EA |
$1,600.00 |
$1,648.50 |
$1,632.80 |
$1,651.86 |
| 1,140 | 810(A)8200 |
SERVICE POLE | 1 | EA |
$8,500.00 |
$6,982.50 |
$6,916.00 |
$6,996.73 |
| 1,150 | 811 9110 |
1/C NO.2 ELECT.COND. | 46,610 | LF |
$10.00 |
$1.58 |
$1.56 |
$1.58 |
| 1,160 | 811 9135 |
1/C NO.12 ELECT.COND. | 9,500 | LF |
$2.00 |
$1.58 |
$1.56 |
$1.58 |
| 1,170 | 509(A)0200 |
CLASS AA CONCRETE | 9.9 | CY |
$500.00 |
$1,050.00 |
$530.40 |
$536.59 |
| 1,180 | 509(D)0500 |
CLASS C CONCRETE | 13.66 | CY |
$350.00 |
$1,149.75 |
$500.00 |
$1,117.79 |
| 1,190 | 511(A)2200 |
REINFORCING STEEL | 562 | LB |
$1.00 |
$1.72 |
$1.50 |
$1.08 |
| 1,200 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 700 | LF |
$8.00 |
$26.25 |
$11.96 |
$12.10 |
| 1,210 | 628 7100 |
INSTALLATION OF CABLE BARRIER SYSTEM | 900 | LF |
$20.00 |
$42.00 |
$19.60 |
$19.83 |
| 1,220 | 628(C)7400 |
END ANCHORS | 4 | EA |
$3,600.00 |
$10,500.00 |
$4,732.00 |
$4,787.24 |
| 1,230 | 628(E)7600 |
CABLE BARRIER TENSION METER | 1 | EA |
$3,700.00 |
$10,500.00 |
$8,902.40 |
$9,006.32 |
| 1,240 | 804(A)2200 |
STRUCTURAL CONCRETE | 6.62 | CY |
$1,000.00 |
$1,149.75 |
$475.00 |
$499.77 |
| 1,250 | 804(B)2300 |
REINFORCING STEEL | 1,100 | LB |
$2.00 |
$1.72 |
$2.35 |
$2.47 |
| 1,260 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 43 | EA |
$60.00 |
$131.25 |
$175.00 |
$184.12 |
| 1,270 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 530.17 | SF |
$22.00 |
$34.65 |
$36.00 |
$37.88 |
| 1,280 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 524.5 | SF |
$18.00 |
$36.75 |
$42.00 |
$44.19 |
| 1,290 | 851(A)2200 |
4"@13 GALV.STL.WD.FLANGE BM.POST | 160 | LF |
$20.00 |
$34.65 |
$36.00 |
$37.88 |
| 1,300 | 851(B)2315 |
3"@7.58 GALV.STL.PIPE POST | 130 | LF |
$28.00 |
$31.50 |
$26.00 |
$27.36 |
| 1,310 | 851(C)2415 |
2" SQUARE TUBE POST | 584 | LF |
$10.00 |
$10.50 |
$9.00 |
$9.47 |
| 1,320 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 116 | EA |
$17.00 |
$23.10 |
$65.00 |
$68.39 |
| 1,330 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 20,232 | LF |
$0.5000 |
$0.4800 |
$0.5500 |
$0.5800 |
| 1,340 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 26,811 | LF |
$0.5000 |
$0.7100 |
$0.7600 |
$0.8000 |
| 1,350 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 7,570 | LF |
$1.50 |
$2.10 |
$1.10 |
$1.16 |
| 1,360 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 860 | LF |
$2.00 |
$3.41 |
$1.80 |
$1.89 |
| 1,370 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 180 | LF |
$9.00 |
$10.50 |
$5.00 |
$5.26 |
| 1,380 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 40 | EA |
$130.00 |
$236.25 |
$255.00 |
$268.30 |
| 1,390 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 18,800 | LF |
$0.2500 |
$0.4000 |
$0.2800 |
$0.2900 |
| 1,400 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 1,000 | EA |
$0.7000 |
$1.05 |
$0.7000 |
$0.7400 |
| 1,410 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 2,000 | LF |
$0.2500 |
$1.05 |
$1.80 |
$1.89 |
| 1,420 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 100 | EA |
$6.00 |
$12.60 |
$9.25 |
$9.73 |
| 1,430 | 870(A)1100 |
SAND FILLED IMPACT ATTEN.MODULE | 38 | EA |
$325.00 |
$525.00 |
$415.00 |
$436.64 |
| 1,440 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 850 | SD |
$7.00 |
$21.00 |
$32.00 |
$33.67 |
| 1,450 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 650 | SD |
$16.00 |
$10.50 |
$12.00 |
$12.63 |
| 1,460 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,300 | LF |
$25.00 |
$15.00 |
$20.00 |
$13.30 |
| 1,470 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,625 | LF |
$5.00 |
$5.04 |
$5.25 |
$13.30 |
| 1,480 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 2,490 | SD |
$5.00 |
$1.05 |
$1.00 |
$1.05 |
| 1,490 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,550 | SD |
$0.5000 |
$1.05 |
$0.1500 |
$0.1600 |
| 1,500 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,735 | SD |
$0.6000 |
$0.5300 |
$0.1500 |
$0.1600 |
| 1,510 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,550 | SD |
$1.75 |
$3.68 |
$6.00 |
$6.31 |
| 1,520 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 4,120 | SD |
$0.7000 |
$1.58 |
$1.75 |
$1.84 |
| 1,530 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 17,965 | SD |
$0.2500 |
$1.31 |
$0.3000 |
$0.3200 |
| 1,540 | 880(F)6700 |
DRUMS | 50,450 | SD |
$0.2000 |
$1.05 |
$0.0200 |
$0.0200 |
| 1,550 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 2,520 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 1,560 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,496 | SD |
$10.00 |
$8.40 |
$16.00 |
$16.83 |
| 1,570 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$140,000.00 |
$60,900.00 |
$75,000.00 |
$110,684.00 |
| 1,580 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$2,600.00 |
$7,500.00 |
$10,543.35 |
| 1,590 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$700,000.00 |
$826,221.59 |
$800,000.00 |
$764,895.00 |