Bid tab 180054

Let Mar 15, 2018 · Division 3 · Mcclain Sign up free

‹ Mar 2018 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-136/SAND CREEK ROAD): OVER DIBBLE CREEK AND TRIBUTARY , 0.8 MILES AND 1.0 MILE EAST SH -76 NEAR DIBBLE. PROJECT LENGTH = 0.239 MILE

Let date
Thursday, March 15, 2018
Contract
180054
J/P numbers
30110(04)
District
Division 3
County
Mcclain
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-136/SAND CREEK ROAD): OVER DIBBLE CREEK AND TRIBUTARY , 0.8 MILES AND 1.0 MILE EAST SH -76 NEAR DIBBLE. PROJECT LENGTH = 0.239 MILE
Project number
ACSTP-244D(056)AG

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$756,954
1 SEWELL BROS., INC. Low bidder $684,813 -9.5%
2 BRIDGECO CONTRACTORS, INC. $728,109 -3.8% +6.3%
3 K & R BUILDERS, INC. $730,024 -3.6% +6.6%
4 C3 Construction, Inc. $750,928 -0.8% +9.7%
5 RRY SERVICES LLC $756,275 -0.1% +10.4%
6 Treas Construction Inc $758,331 +0.2% +10.7%
7 HASKELL LEMON CONSTRUCTION CO. $884,896 +16.9% +29.2%

Bid tab: unit prices 75 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SEWELL BROS., I…#2 BRIDGECO CONTRA…#3 K & R BUILDERS,…#4 C3 Construction…#5 RRY SERVICES LLC#6 Treas Construct…#7 HASKELL LEMON C…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $20,000.00 $10,500.00 $9,500.00 $4,133.58 $6,000.00 $7,416.00 $13,045.00
2202(A) 0183 UNCLASSIFIED EXCAVATION1,900CY $7.00 $5.00 $8.00 $9.00 $5.91 $10.00 $12.36 $9.85
3202(D) 0184 UNCLASSIFIED BORROW1,664CY $8.00 $5.00 $8.00 $1.00 $8.27 $11.00 $16.48 $20.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $12,000.00 $6,500.00 $5,500.00 $5,875.00 $4,133.58 $5,000.00 $3,296.00 $12,335.00
5221(C) 2801 TEMPORARY SILT FENCE416LF $2.00 $2.50 $3.33 $1.40 $2.75 $2.33 $2.40 $2.40
6221(F) 0100 TEMPORARY SILT DIKE405LF $8.00 $4.60 $4.75 $6.70 $4.98 $4.22 $4.35 $4.30
7230(A) 2806 SOLID SLAB SODDING3,383.87SY $2.00 $3.80 $3.65 $3.30 $3.78 $3.20 $3.30 $3.25
8233(A) 2817 VEGETATIVE MULCHING0.7AC $500.00 $2.20 $550.00 $200.00 $236.21 $200.00 $206.00 $204.00
9307(B) 4210 CEMENT KILN DUST214TON $85.00 $72.00 $65.00 $75.00 $67.55 $68.52 $70.58 $57.70
10307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE3,961SY $3.00 $2.00 $4.75 $2.09 $9.98 $1.90 $1.96 $7.05
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E77TON $30.00 $53.00 $32.80 $56.00 $27.46 $50.84 $31.93 $80.30
12407(B) 0250 TACK COAT279GAL $3.00 $2.00 $3.83 $2.02 $4.31 $1.84 $1.90 $3.65
13408 5774 PRIME COAT991GAL $3.00 $3.25 $3.83 $3.40 $4.31 $3.09 $3.18 $3.70
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)800TON $65.00 $62.00 $74.26 $61.60 $84.32 $56.00 $57.68 $68.40
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)453TON $75.00 $80.00 $89.44 $79.00 $101.57 $71.85 $74.00 $82.50
16509(D) 0325 CLASS C CONCRETE20CY $280.00 $300.00 $350.00 $275.00 $250.38 $350.00 $463.50 $480.50
17613(A) 0494 36" R.C.PIPE CLASS III96LF $110.00 $130.00 $128.30 $114.00 $71.38 $125.00 $154.50 $102.50
18613(B) 0690 24" CORR. GALV. STEEL PIPE132LF $40.00 $30.00 $31.00 $29.25 $40.45 $45.00 $31.93 $42.70
19613(M) 7187 TYPE B4 CULVERT END TREATMENT6EA $1,250.00 $1,200.00 $1,250.00 $980.00 $267.97 $1,700.00 $1,339.00 $915.50
20613(M) 7194 TYPE DD4 CULVERT END TREATMENT2EA $3,260.00 $1,400.00 $2,875.00 $2,900.00 $2,195.40 $2,100.00 $2,369.00 $2,637.00
21619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $2,000.00 $2,300.00 $3,000.00 $4,000.00 $4,133.58 $4,000.00 $4,841.00 $10,500.00
22619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,829SY $6.00 $9.00 $3.50 $2.95 $5.91 $5.00 $4.12 $6.05
23619(B) 4780 REMOVAL OF GUARDRAIL800LF $4.00 $3.00 $2.00 $3.35 $4.44 $3.76 $3.61 $3.15
24619(C) 0924 SAWING PAVEMENT100LF $4.00 $4.00 $8.00 $1.50 $3.54 $4.75 $8.24 $18.30
25623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE12.5LF $18.00 $82.00 $75.00 $75.00 $59.05 $14.85 $77.25 $76.50
26623(F) 4446 GUARDRAIL ANCHOR UNIT (TYPE A)3EA $1,610.00 $1,800.00 $2,500.00 $3,500.00 $2,598.25 $1,500.00 $1,699.50 $1,682.00
27623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,700.00 $1,600.00 $2,150.00 $3,000.00 $2,066.79 $1,200.00 $1,493.50 $1,479.00
28880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $4,500.00 $2,600.00 $2,750.00 $3,000.00 $2,834.45 $3,400.00 $2,472.00 $2,447.00
29501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON190CY $18.00 $10.00 $14.00 $8.95 $14.76 $15.00 $25.75 $17.00
30501(F) 6352 GRANULAR BACKFILL76CY $60.00 $60.00 $64.12 $67.00 $26.57 $75.00 $51.50 $87.40
31503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)179LF $200.00 $220.00 $227.61 $224.00 $248.92 $210.00 $230.50 $221.00
32504(B) 1305 SAW-CUT GROOVING156.7SY $4.50 $15.00 $16.50 $15.40 $16.53 $14.00 $15.45 $14.30
33504(D) 6239 CONCRETE RAIL (TR3)188.1LF $77.00 $70.00 $76.00 $85.00 $72.46 $85.00 $87.33 $105.50
34506(A) 1322 STRUCTURAL STEEL580LB $2.00 $2.00 $2.83 $2.25 $4.24 $4.00 $1.87 $6.60
35507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $900.00 $420.00 $735.00 $675.00 $575.26 $825.00 $794.39 $1,209.00
36507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY3EA $1,100.00 $420.00 $735.00 $675.00 $575.26 $825.00 $794.39 $1,215.00
37509(A) 1326 CLASS AA CONCRETE50.6CY $600.00 $550.00 $530.00 $670.00 $472.41 $625.00 $637.93 $672.00
38509(B) 1328 CLASS A CONCRETE68CY $625.00 $550.00 $530.00 $687.50 $468.87 $625.00 $637.93 $664.50
39511(A) 1332 REINFORCING STEEL24,120LB $1.00 $0.8500 $1.00 $0.9200 $0.8000 $1.00 $1.04 $1.45
40514(A) 6010 PILES, FURNISHED (HP 10X42)98LF $30.00 $25.00 $31.67 $35.00 $23.69 $30.00 $26.83 $40.80
41514(A) 6011 PILES, FURNISHED (HP 12X53)215LF $36.00 $30.00 $33.53 $39.90 $29.89 $40.00 $32.53 $47.90
42514(B) 6292 PILES, DRIVEN (HP 10X42)98LF $16.00 $15.00 $14.00 $15.00 $14.17 $10.00 $15.45 $22.10
43514(B) 6294 PILES, DRIVEN (HP 12X53)215LF $18.00 $15.00 $12.00 $17.10 $14.17 $10.00 $15.45 $30.20
44514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
45601(B) 1353 TYPE I-A PLAIN RIPRAP655TON $35.00 $43.00 $41.50 $44.75 $42.52 $50.00 $45.20 $44.40
46601(C) 1355 TYPE I-A FILTER BLANKET170TON $35.00 $33.00 $34.75 $34.25 $32.77 $40.00 $34.45 $44.40
47613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND60LF $25.00 $25.00 $30.00 $30.00 $21.26 $30.00 $20.60 $50.60
48613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $25.00 $25.00 $25.00 $30.00 $21.26 $30.00 $20.60 $13.90
49619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $7,500.00 $4,000.00 $6,000.00 $14,172.26 $6,500.00 $3,408.53 $6,675.00
50501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON180CY $18.00 $10.00 $14.00 $8.95 $14.76 $15.00 $25.75 $17.90
51501(F) 6352 GRANULAR BACKFILL66CY $60.00 $60.00 $64.12 $67.00 $26.57 $75.00 $51.50 $93.20
52503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)134LF $200.00 $230.00 $253.90 $249.00 $252.77 $210.00 $250.90 $228.00
53504(B) 1305 SAW-CUT GROOVING115.3SY $4.50 $15.00 $16.50 $15.40 $16.53 $14.00 $14.42 $14.30
54504(D) 6239 CONCRETE RAIL (TR3)146LF $77.00 $70.00 $76.00 $87.00 $72.46 $85.00 $86.21 $112.00
55506(A) 1322 STRUCTURAL STEEL500LB $2.00 $2.00 $2.83 $2.25 $4.16 $4.00 $1.87 $7.55
56507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY3EA $900.00 $420.00 $735.00 $670.00 $575.26 $825.00 $794.39 $1,209.00
57507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY3EA $1,100.00 $420.00 $735.00 $670.00 $575.26 $825.00 $794.39 $1,215.00
58509(A) 1326 CLASS AA CONCRETE37.9CY $600.00 $550.00 $530.00 $700.00 $472.41 $625.00 $637.93 $792.00
59509(B) 1328 CLASS A CONCRETE60.4CY $625.00 $550.00 $530.00 $687.50 $468.87 $625.00 $637.93 $632.00
60511(A) 1332 REINFORCING STEEL17,480LB $1.00 $0.8500 $1.00 $0.9300 $0.8000 $1.00 $1.04 $1.75
61514(A) 6010 PILES, FURNISHED (HP 10X42)118LF $30.00 $25.00 $31.67 $35.00 $23.69 $30.00 $26.83 $37.40
62514(A) 6011 PILES, FURNISHED (HP 12X53)265LF $36.00 $30.00 $32.53 $39.90 $29.89 $40.00 $32.53 $44.20
63514(B) 6292 PILES, DRIVEN (HP 10X42)118LF $16.00 $15.00 $12.00 $15.00 $14.17 $10.00 $12.36 $22.50
64514(B) 6294 PILES, DRIVEN (HP 12X53)265LF $18.00 $15.00 $12.00 $17.10 $14.17 $10.00 $12.36 $24.50
65514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
66601(B) 1353 TYPE I-A PLAIN RIPRAP625TON $35.00 $43.00 $41.50 $44.75 $42.52 $52.00 $46.23 $44.90
67601(C) 1355 TYPE I-A FILTER BLANKET160TON $35.00 $33.00 $34.75 $34.25 $32.77 $40.00 $34.45 $35.50
68613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $25.00 $25.00 $30.00 $30.00 $14.17 $30.00 $30.90 $58.40
69613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $25.00 $25.00 $25.00 $30.00 $14.17 $30.00 $30.90 $24.40
70619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $5,000.00 $5,500.00 $5,750.00 $5,905.11 $6,500.00 $4,637.83 $3,881.00
71805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS5EA $141.56 $220.00 $225.00 $220.00 $236.20 $250.00 $206.00 $204.00
72855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)4,611LF $0.9200 $0.8700 $0.8700 $0.9100 $0.9800 $0.7100 $0.0900 $0.8500
73642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $25,000.00 $7,150.00 $7,800.00 $7,600.00 $8,125.43 $12,100.00 $7,086.40 $6,612.00
74220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,000.00 $4,000.00 $3,000.00 $2,325.00 $1,771.53 $1,250.00 $2,575.00 $2,885.00
75641 1399 MOBILIZATION1LSUM $60,000.00 $34,000.00 $42,500.00 $33,500.00 $65,841.95 $62,000.00 $56,516.04 $56,209.35