| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$1,500.00 |
$15,000.00 |
$20,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,783 | CY |
$10.00 |
$10.50 |
$16.00 |
$8.75 |
$20.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$6,500.00 |
$12,000.00 |
$5,000.00 |
$5,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,200 | LF |
$2.50 |
$2.50 |
$3.00 |
$3.00 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 252 | LF |
$10.00 |
$15.00 |
$8.00 |
$10.00 |
$20.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 3,830 | SY |
$2.50 |
$3.45 |
$8.00 |
$3.00 |
$4.00 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.85 | AC |
$1,500.00 |
$1,700.00 |
$1,200.00 |
$1,000.00 |
$6,600.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 615 | TON |
$45.00 |
$38.72 |
$34.00 |
$28.00 |
$40.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 131 | CY |
$450.00 |
$395.00 |
$170.00 |
$350.00 |
$650.00 |
| 10 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 40 | LF |
$50.00 |
$42.00 |
$35.00 |
$50.00 |
$55.00 |
| 11 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 48 | LF |
$75.00 |
$84.00 |
$65.00 |
$95.00 |
$60.00 |
| 12 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$700.00 |
$650.00 |
$500.00 |
$300.00 |
$2,000.00 |
| 13 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$1,350.00 |
$1,200.00 |
$1,600.00 |
$2,500.00 |
| 14 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$20.00 |
$39.00 |
$30.00 |
$34.00 |
$40.00 |
| 15 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$750.00 |
$1,675.00 |
$1,075.00 |
$1,500.00 |
$1,500.00 |
| 16 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,575.00 |
$1,600.00 |
$1,300.00 |
$1,500.00 |
| 17 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$25.00 |
$16.00 |
$50.00 |
$15.00 |
$20.00 |
| 18 | 501(F) 6352 |
GRANULAR BACKFILL | 88 | CY |
$50.00 |
$85.00 |
$75.00 |
$80.00 |
$90.00 |
| 19 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 209 | LF |
$300.00 |
$242.07 |
$232.00 |
$240.00 |
$250.00 |
| 20 | 504(B) 1305 |
SAW-CUT GROOVING | 181.1 | SY |
$5.00 |
$13.40 |
$14.00 |
$11.40 |
$15.00 |
| 21 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 213.3 | LF |
$80.00 |
$78.00 |
$69.00 |
$95.00 |
$85.00 |
| 22 | 506(A) 1322 |
STRUCTURAL STEEL | 580 | LB |
$2.85 |
$3.75 |
$3.00 |
$4.00 |
$3.00 |
| 23 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$900.00 |
$980.00 |
$1,200.00 |
$1,250.00 |
$1,000.00 |
| 24 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$900.00 |
$980.00 |
$1,200.00 |
$1,250.00 |
$1,000.00 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 58.8 | CY |
$500.00 |
$665.00 |
$600.00 |
$700.00 |
$850.00 |
| 26 | 509(B) 1328 |
CLASS A CONCRETE | 74.2 | CY |
$475.00 |
$675.00 |
$625.00 |
$700.00 |
$800.00 |
| 27 | 511(A) 1332 |
REINFORCING STEEL | 27,602 | LB |
$1.00 |
$1.05 |
$1.15 |
$1.15 |
$1.20 |
| 28 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 176 | LF |
$30.00 |
$32.52 |
$30.00 |
$40.00 |
$60.00 |
| 29 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 410 | LF |
$40.00 |
$35.09 |
$29.00 |
$50.00 |
$65.00 |
| 30 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 176 | LF |
$15.00 |
$14.00 |
$14.00 |
$15.00 |
$10.00 |
| 31 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 410 | LF |
$18.00 |
$14.00 |
$14.00 |
$15.00 |
$10.00 |
| 32 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 33 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 905 | TON |
$45.00 |
$49.30 |
$46.00 |
$45.00 |
$60.00 |
| 34 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 220 | TON |
$45.00 |
$45.30 |
$32.50 |
$40.00 |
$60.00 |
| 35 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$15.00 |
$35.00 |
$50.00 |
$37.00 |
$35.00 |
| 36 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$20.00 |
$30.00 |
$55.00 |
$37.00 |
$35.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$4,000.00 |
$7,500.00 |
$10,500.00 |
$8,500.00 |
$25,000.00 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,750.00 |
$3,000.00 |
$2,000.00 |
$5,000.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$6,300.00 |
$5,100.00 |
$7,000.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$3,000.00 |
$2,500.00 |
$1,275.00 |
$5,000.00 |
| 41 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$20,500.00 |
$29,000.00 |
$40,240.64 |
$51,500.00 |
$50,000.00 |