| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$35,000.00 |
$36,500.00 |
$40,000.00 |
$57,900.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,560 | LF |
$2.49 |
$2.45 |
$2.69 |
$2.45 |
$3.25 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 224 | LF |
$11.54 |
$9.75 |
$11.00 |
$9.75 |
$26.40 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 10,908 | SY |
$3.00 |
$2.65 |
$3.18 |
$2.65 |
$3.48 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.25 | AC |
$1,061.46 |
$675.00 |
$700.00 |
$675.00 |
$6,300.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,117 | TON |
$36.52 |
$35.65 |
$42.00 |
$42.50 |
$43.10 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$353.02 |
$150.00 |
$400.00 |
$275.00 |
$350.00 |
| 8 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 52 | LF |
$45.89 |
$35.00 |
$32.00 |
$55.00 |
$36.50 |
| 9 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,221.15 |
$500.00 |
$300.00 |
$430.00 |
$312.20 |
| 10 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$19.98 |
$100.00 |
$12.00 |
$15.00 |
$12.00 |
| 11 | 501(F) 6352 |
GRANULAR BACKFILL | 66 | CY |
$71.86 |
$75.00 |
$75.00 |
$94.00 |
$79.00 |
| 12 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 417 | LF |
$215.00 |
$250.00 |
$222.50 |
$200.00 |
$212.90 |
| 13 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$235.98 |
$40.00 |
$355.00 |
$200.00 |
$299.53 |
| 14 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 336 | LF |
$83.90 |
$40.00 |
$84.50 |
$90.00 |
$81.00 |
| 15 | 506(A) 1322 |
STRUCTURAL STEEL | 1,060 | LB |
$3.11 |
$1.00 |
$3.50 |
$2.85 |
$3.43 |
| 16 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$856.46 |
$1,000.00 |
$900.00 |
$900.00 |
$720.00 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$906.52 |
$1,000.00 |
$900.00 |
$900.00 |
$720.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 110.5 | CY |
$875.00 |
$500.00 |
$712.50 |
$700.00 |
$650.00 |
| 19 | 509(B) 1328 |
CLASS A CONCRETE | 102 | CY |
$750.00 |
$645.00 |
$742.50 |
$700.00 |
$650.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 44,680 | LB |
$1.02 |
$1.00 |
$0.9900 |
$1.15 |
$1.05 |
| 21 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 170 | LF |
$35.71 |
$25.00 |
$33.60 |
$45.00 |
$27.75 |
| 22 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 395 | LF |
$40.87 |
$29.00 |
$39.20 |
$55.00 |
$29.00 |
| 23 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 170 | LF |
$13.54 |
$5.00 |
$14.40 |
$10.00 |
$16.00 |
| 24 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 395 | LF |
$12.86 |
$5.00 |
$16.80 |
$10.00 |
$15.00 |
| 25 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 26 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 128 | LF |
$600.00 |
$1,000.00 |
$678.00 |
$700.00 |
$879.39 |
| 27 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,156 | TON |
$45.00 |
$38.60 |
$50.00 |
$60.00 |
$49.50 |
| 28 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 386 | TON |
$40.00 |
$32.50 |
$42.00 |
$49.00 |
$48.00 |
| 29 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$28.51 |
$65.00 |
$30.00 |
$35.00 |
$75.00 |
| 30 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.04 |
$65.00 |
$30.00 |
$35.00 |
$45.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$15,000.00 |
$13,375.00 |
$18,500.00 |
$15,000.00 |
| 32 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 25 | LF |
$21.50 |
$35.00 |
$38.50 |
$35.00 |
$27.00 |
| 33 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,833.18 |
$1,820.00 |
$2,000.00 |
$1,820.00 |
$1,950.00 |
| 34 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 3 | EA |
$1,622.77 |
$1,075.00 |
$1,200.00 |
$1,075.00 |
$1,900.00 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,500.00 |
$2,500.00 |
$4,250.00 |
$2,500.00 |
$3,000.00 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$7,700.00 |
$7,500.00 |
$7,200.00 |
$7,150.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,250.00 |
$1,000.00 |
$2,500.00 |
$1,275.00 |
$3,000.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$50,000.00 |
$53,500.00 |
$65,500.00 |
$43,000.00 |