| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$14,000.00 |
$10,000.00 |
$4,000.00 |
$3,000.00 |
$14,000.00 |
$5,000.00 |
$21,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,624 | CY |
$9.00 |
$8.00 |
$9.00 |
$7.50 |
$12.00 |
$8.00 |
$20.50 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$11,000.00 |
$6,200.00 |
$4,500.00 |
$3,000.00 |
$6,900.00 |
$7,900.00 |
$30,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,950 | LF |
$2.50 |
$1.40 |
$4.00 |
$4.30 |
$4.25 |
$7.00 |
$4.30 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 140 | LF |
$11.50 |
$9.00 |
$10.00 |
$20.00 |
$20.00 |
$11.00 |
$20.40 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 5,064 | SY |
$2.50 |
$5.60 |
$3.00 |
$5.50 |
$6.30 |
$7.00 |
$5.70 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 1.05 | AC |
$800.00 |
$500.00 |
$500.00 |
$3,500.00 |
$3,700.00 |
$1,600.00 |
$3,780.00 |
| 80 | 241 3100 |
MOWING | 2.09 | AC |
$200.00 |
$100.00 |
$350.00 |
$100.00 |
$200.00 |
$353.00 |
$105.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 446 | CY |
$55.00 |
$57.80 |
$100.00 |
$70.00 |
$68.50 |
$59.00 |
$75.00 |
| 100 | 307(K)4200 |
STABILIZED SUBGRADE | 2,997 | SY |
$7.00 |
$7.70 |
$8.00 |
$7.50 |
$7.70 |
$10.00 |
$8.60 |
| 110 | 325 0100 |
SEPARATOR FABRIC | 3,318 | SY |
$1.50 |
$3.00 |
$2.25 |
$2.15 |
$2.50 |
$4.00 |
$3.00 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 601 | TON |
$35.00 |
$28.40 |
$35.00 |
$37.80 |
$37.00 |
$38.00 |
$48.00 |
| 130 | 407(B)7300 |
TACK COAT | 180 | GAL |
$3.50 |
$5.00 |
$5.50 |
$5.40 |
$5.50 |
$3.75 |
$2.50 |
| 140 | 408 8100 |
PRIME COAT | 1,718 | GAL |
$4.00 |
$3.00 |
$6.50 |
$6.00 |
$6.50 |
$4.75 |
$2.50 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 398 | TON |
$85.00 |
$126.50 |
$121.00 |
$124.00 |
$157.70 |
$215.00 |
$108.70 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 264 | TON |
$110.00 |
$148.50 |
$140.00 |
$145.00 |
$142.00 |
$224.00 |
$138.80 |
| 170 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 75 | LF |
$40.00 |
$52.00 |
$70.00 |
$70.00 |
$48.00 |
$107.00 |
$64.90 |
| 180 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,300.00 |
$1,250.00 |
$1,400.00 |
$1,750.00 |
$3,200.00 |
$1,700.00 |
$919.20 |
| 190 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,250.00 |
$5,000.00 |
$1,000.00 |
$4,000.00 |
$6,000.00 |
$11,126.27 |
| 200 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,310 | SY |
$6.00 |
$3.75 |
$11.00 |
$5.00 |
$14.30 |
$4.00 |
$2.60 |
| 210 | 619(C)6600 |
SAWING PAVEMENT | 44 | LF |
$5.00 |
$15.00 |
$25.00 |
$5.00 |
$10.00 |
$10.00 |
$10.50 |
| 220 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$2,000.00 |
$2,415.00 |
$2,750.00 |
$2,450.00 |
$3,600.00 |
$2,674.00 |
$2,490.00 |
| 230 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$2,363.00 |
$4,200.00 |
$2,425.00 |
$3,600.00 |
$2,616.00 |
$2,435.00 |
| 240 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,128 | LF |
$7.50 |
$7.14 |
$10.00 |
$4.75 |
$11.22 |
$9.00 |
$16.20 |
| 250 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 561 | LF |
$8.00 |
$8.20 |
$12.50 |
$11.00 |
$8.60 |
$11.00 |
$17.30 |
| 260 | 624(D)3500 |
GATE, GALVANIZED STEEL | 2 | EA |
$1,100.00 |
$1,210.00 |
$1,500.00 |
$1,300.00 |
$1,210.00 |
$3,500.00 |
$1,295.00 |
| 270 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$225.00 |
$150.00 |
$200.00 |
$350.00 |
$250.00 |
$174.00 |
$108.00 |
| 280 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$20.00 |
$10.00 |
$17.50 |
$15.00 |
$12.00 |
$20.00 |
$27.00 |
| 290 | 501(F)1700 |
GRANULAR BACKFILL | 76 | CY |
$75.00 |
$68.00 |
$80.00 |
$85.00 |
$65.00 |
$96.00 |
$75.70 |
| 300 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$275.00 |
$272.00 |
$285.00 |
$265.00 |
$296.81 |
$325.00 |
$313.60 |
| 310 | 504(A)5200 |
APPROACH SLAB | 173.4 | SY |
$250.00 |
$240.00 |
$265.00 |
$260.00 |
$282.50 |
$220.00 |
$237.91 |
| 320 | 504(B)5300 |
SAW-CUT GROOVING | 352.5 | SY |
$10.00 |
$11.35 |
$12.00 |
$10.75 |
$11.30 |
$12.00 |
$11.60 |
| 330 | 504(D)5410 |
CONCRETE RAIL (TR3) | 211.2 | LF |
$85.00 |
$83.00 |
$82.00 |
$95.00 |
$82.00 |
$115.00 |
$86.50 |
| 340 | 506(A)7200 |
STRUCTURAL STEEL | 510 | LB |
$3.75 |
$5.25 |
$6.00 |
$6.50 |
$5.82 |
$4.00 |
$7.60 |
| 350 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,300.00 |
$1,375.00 |
$1,000.00 |
$1,900.00 |
$1,164.00 |
$1,265.00 |
$2,163.00 |
| 360 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$1,375.00 |
$1,000.00 |
$1,900.00 |
$1,164.00 |
$1,265.00 |
$2,163.00 |
| 370 | 509(A)0210 |
CLASS AA CONCRETE | 60.1 | CY |
$650.00 |
$657.50 |
$550.00 |
$850.00 |
$600.00 |
$805.00 |
$757.00 |
| 380 | 509(B)0320 |
CLASS A CONCRETE | 66.2 | CY |
$725.00 |
$682.50 |
$550.00 |
$850.00 |
$600.00 |
$700.00 |
$757.00 |
| 390 | 511(A)2210 |
REINFORCING STEEL | 23,310 | LB |
$1.10 |
$1.28 |
$1.50 |
$1.45 |
$1.33 |
$1.30 |
$1.30 |
| 400 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 162 | LF |
$35.00 |
$44.10 |
$45.00 |
$60.00 |
$38.75 |
$60.00 |
$54.10 |
| 410 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 371 | LF |
$39.00 |
$52.50 |
$45.00 |
$70.00 |
$52.20 |
$65.00 |
$64.90 |
| 420 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 162 | LF |
$15.00 |
$18.90 |
$22.50 |
$10.00 |
$18.00 |
$10.00 |
$19.50 |
| 430 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 371 | LF |
$18.00 |
$22.50 |
$22.50 |
$10.00 |
$18.00 |
$10.00 |
$21.65 |
| 440 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 450 | 518(B)0300 |
SEALED EXPANSION JOINTS | 29.17 | LF |
$400.00 |
$335.00 |
$300.00 |
$475.00 |
$320.00 |
$310.00 |
$486.70 |
| 460 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 620 | TON |
$50.00 |
$45.40 |
$46.00 |
$55.00 |
$43.50 |
$48.00 |
$75.70 |
| 470 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 105 | TON |
$38.00 |
$32.75 |
$42.50 |
$45.00 |
$42.00 |
$38.00 |
$75.70 |
| 480 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$30.00 |
$30.00 |
$40.00 |
$45.00 |
$22.00 |
$32.50 |
| 490 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$20.00 |
$30.00 |
$30.00 |
$40.00 |
$45.00 |
$22.00 |
$32.50 |
| 500 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$12,000.00 |
$8,000.00 |
$18,000.00 |
$20,000.00 |
$35,000.00 |
| 510 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 32 | EA |
$17.00 |
$13.25 |
$15.00 |
$15.00 |
$22.00 |
$15.41 |
$17.00 |
| 520 | 855(A)7200 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,200 | LF |
$0.9000 |
$1.87 |
$1.25 |
$1.85 |
$3.70 |
$1.90 |
$1.50 |
| 530 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 840 | SD |
$0.4000 |
$2.00 |
$5.00 |
$2.15 |
$2.20 |
$2.15 |
$0.5500 |
| 540 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$1.50 |
$2.00 |
$1.50 |
$2.15 |
$2.20 |
$2.15 |
$1.65 |
| 550 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 840 | SD |
$1.60 |
$2.00 |
$2.00 |
$2.15 |
$2.20 |
$2.15 |
$3.00 |
| 560 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$1.30 |
$0.3700 |
$1.50 |
$0.4000 |
$3.25 |
$0.4100 |
$1.62 |
| 570 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,240 | SD |
$0.7500 |
$0.1600 |
$0.1500 |
$0.1800 |
$2.20 |
$0.1700 |
$0.1600 |
| 580 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,500.00 |
$6,200.00 |
$5,300.00 |
$6,500.00 |
$9,800.00 |
$6,400.00 |
$21,000.00 |
| 590 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,500.00 |
$2,000.00 |
$3,200.00 |
$2,500.00 |
$8,500.00 |
| 600 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$57,000.00 |
$62,000.00 |
$47,502.10 |
$69,000.00 |
$60,000.00 |
$50,000.00 |
$66,800.00 |