| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$12,000.00 |
$18,500.00 |
$14,000.00 |
$10,780.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,990 | CY |
$10.00 |
$7.50 |
$10.00 |
$12.40 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,270 | CY |
$12.00 |
$9.63 |
$12.00 |
$16.30 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$1,200.00 |
$6,750.00 |
$4,000.00 |
$11,105.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 885 | LF |
$2.50 |
$7.25 |
$5.00 |
$6.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$9.00 |
$23.50 |
$20.00 |
$21.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,640 | SY |
$2.50 |
$8.56 |
$4.00 |
$8.40 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.37 | AC |
$1,000.00 |
$2,100.00 |
$1,700.00 |
$2,099.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,677 | TON |
$28.00 |
$33.50 |
$32.00 |
$52.50 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$550.00 |
$300.00 |
$300.00 |
$516.00 |
| 11 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 605 | TON |
$45.00 |
$45.95 |
$47.00 |
$42.50 |
| 12 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 150 | TON |
$42.00 |
$39.95 |
$35.00 |
$32.90 |
| 13 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$450.00 |
$800.00 |
$256.00 |
| 14 | 616(P) 0600 |
24" HDPE PIPE | 46 | LF |
$165.00 |
$35.00 |
$78.00 |
$45.60 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$20.00 |
$12.00 |
$25.00 |
$16.90 |
| 16 | 501(F) 6352 |
GRANULAR BACKFILL | 76 | CY |
$65.00 |
$72.12 |
$85.00 |
$101.50 |
| 17 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$220.00 |
$234.90 |
$255.00 |
$233.00 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 210.2 | LF |
$80.00 |
$76.00 |
$100.00 |
$116.00 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$3.00 |
$4.10 |
$3.90 |
$5.20 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$800.00 |
$950.00 |
$1,227.00 |
| 21 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$800.00 |
$950.00 |
$1,227.00 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 60.1 | CY |
$600.00 |
$645.00 |
$700.00 |
$873.50 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$750.00 |
$675.00 |
$700.00 |
$987.50 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 22,310 | LB |
$1.25 |
$1.03 |
$1.05 |
$1.70 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 136 | LF |
$34.00 |
$31.25 |
$45.00 |
$40.00 |
| 26 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 306 | LF |
$40.00 |
$33.59 |
$55.00 |
$46.70 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 136 | LF |
$14.00 |
$14.00 |
$10.00 |
$30.60 |
| 28 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 306 | LF |
$16.00 |
$12.00 |
$10.00 |
$27.20 |
| 29 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,250 | TON |
$45.00 |
$45.95 |
$47.00 |
$42.20 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 300 | TON |
$42.00 |
$37.95 |
$35.00 |
$32.90 |
| 32 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$9,400.00 |
$11,835.00 |
| 33 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 212.5 | LF |
$22.00 |
$21.40 |
$20.00 |
$18.90 |
| 34 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,200.00 |
$1,650.00 |
$1,200.00 |
$1,233.00 |
| 35 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,500.00 |
$2,150.00 |
$1,750.00 |
$1,810.00 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,650.00 |
$2,250.00 |
$2,833.00 |
| 37 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,025.00 |
$7,000.00 |
$5,000.00 |
$8,958.00 |
| 38 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$1,275.00 |
$2,361.00 |
| 39 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,374.00 |
$29,000.00 |
$55,950.00 |
$62,545.39 |