| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$16,000.00 |
$10,250.00 |
$7,150.00 |
$17,500.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$25,000.00 |
$30,000.00 |
$46,200.00 |
$45,000.00 |
$27,500.00 |
$40,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$1.80 |
$1.85 |
$3.00 |
$1.95 |
$2.04 |
$2.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$8.00 |
$8.40 |
$10.50 |
$5.00 |
$9.35 |
$7.66 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 8,360 | SY |
$1.80 |
$1.70 |
$1.80 |
$1.68 |
$1.78 |
$1.40 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.73 | AC |
$650.00 |
$600.00 |
$950.00 |
$250.00 |
$935.00 |
$545.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 438 | CY |
$63.49 |
$72.00 |
$67.00 |
$73.00 |
$71.28 |
$68.00 |
| 8 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 910 | LF |
$6.00 |
$6.05 |
$26.49 |
$12.95 |
$14.30 |
$20.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 95 | CY |
$275.00 |
$305.00 |
$350.00 |
$395.00 |
$395.27 |
$350.00 |
| 10 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 70 | LF |
$40.00 |
$43.00 |
$36.00 |
$32.00 |
$53.05 |
$50.00 |
| 11 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,100.00 |
$1,675.00 |
$1,800.00 |
$1,350.00 |
$1,252.18 |
$1,400.00 |
| 12 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$10.00 |
$15.00 |
$12.00 |
$14.00 |
$16.50 |
$13.00 |
| 13 | 501(F) 6352 |
GRANULAR BACKFILL | 138 | CY |
$60.00 |
$65.00 |
$55.00 |
$70.00 |
$76.24 |
$90.00 |
| 14 | 503(A) 6290 |
PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 404 | LF |
$300.00 |
$257.00 |
$264.00 |
$311.00 |
$292.50 |
$350.00 |
| 15 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 364.5 | LF |
$70.00 |
$70.00 |
$77.00 |
$80.50 |
$76.52 |
$75.00 |
| 16 | 506(A) 1322 |
STRUCTURAL STEEL | 840 | LB |
$3.50 |
$3.00 |
$3.50 |
$2.50 |
$4.69 |
$3.00 |
| 17 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$700.00 |
$1,150.00 |
$1,375.00 |
$1,455.00 |
$1,895.58 |
$1,400.00 |
| 18 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$700.00 |
$1,150.00 |
$1,375.00 |
$1,455.00 |
$1,895.58 |
$1,400.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 120.4 | CY |
$500.00 |
$550.00 |
$600.00 |
$712.00 |
$732.20 |
$675.00 |
| 20 | 509(B) 1328 |
CLASS A CONCRETE | 93.6 | CY |
$525.00 |
$600.00 |
$600.00 |
$750.00 |
$731.05 |
$675.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 42,580 | LB |
$0.9000 |
$1.00 |
$1.05 |
$0.9900 |
$1.08 |
$1.00 |
| 22 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 104 | LF |
$38.00 |
$30.00 |
$31.00 |
$39.90 |
$51.70 |
$36.00 |
| 23 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 406 | LF |
$45.00 |
$35.00 |
$37.30 |
$44.10 |
$58.71 |
$46.00 |
| 24 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 104 | LF |
$14.00 |
$15.00 |
$15.00 |
$17.10 |
$22.00 |
$10.00 |
| 25 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 406 | LF |
$14.00 |
$15.00 |
$12.00 |
$18.90 |
$22.00 |
$10.00 |
| 26 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 27 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,974 | TON |
$38.00 |
$47.00 |
$49.30 |
$49.30 |
$54.46 |
$58.00 |
| 28 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 532 | TON |
$32.00 |
$38.00 |
$48.00 |
$38.75 |
$43.62 |
$46.00 |
| 29 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$30.00 |
$30.00 |
$20.00 |
$30.00 |
$19.54 |
$35.00 |
| 30 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 32 | LF |
$22.00 |
$35.00 |
$40.00 |
$45.00 |
$22.34 |
$35.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$29,000.00 |
$11,500.00 |
$16,500.00 |
$20,500.00 |
| 32 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,200.00 |
$3,450.00 |
$3,500.00 |
$3,250.00 |
$3,250.50 |
$3,300.00 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,850.00 |
$2,500.00 |
$4,340.00 |
$2,860.00 |
$2,200.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,050.00 |
$5,900.00 |
$7,500.00 |
$7,920.00 |
$7,200.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,000.00 |
$3,000.00 |
$3,000.00 |
$5,500.00 |
$1,275.00 |
| 36 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$33,000.00 |
$42,000.00 |
$53,000.00 |
$64,580.91 |
$65,000.00 |