| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,750.00 |
$2,042.35 |
$9,000.00 |
$13,500.00 |
$7,500.00 |
$32,000.00 |
$30,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,775.6 | CY |
$6.90 |
$8.85 |
$7.10 |
$4.00 |
$14.00 |
$11.00 |
$19.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,807.5 | CY |
$9.72 |
$11.57 |
$13.00 |
$14.00 |
$15.00 |
$13.00 |
$16.00 |
| 4 | 210 0121 |
OBLITERATING ABANDONED ROAD | 284.6 | LF |
$5.00 |
$6.81 |
$11.50 |
$2.00 |
$25.00 |
$20.00 |
$70.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 470 | LF |
$1.50 |
$4.08 |
$5.70 |
$2.00 |
$3.00 |
$4.00 |
$9.45 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 112 | LF |
$6.00 |
$25.80 |
$12.00 |
$12.00 |
$17.50 |
$19.00 |
$32.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 4,906.67 | SY |
$3.50 |
$5.53 |
$3.00 |
$3.50 |
$5.00 |
$4.50 |
$3.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 540 | TON |
$58.25 |
$25.73 |
$38.00 |
$35.00 |
$37.00 |
$37.00 |
$10.00 |
| 9 | 613(C) 5221 |
35" X 24" PRECOATED CORR. STL. PIPE ARCH | 49 | LF |
$66.00 |
$97.06 |
$85.00 |
$60.00 |
$78.00 |
$72.00 |
$120.00 |
| 10 | 613(L) 4522 |
35" X 24" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$350.00 |
$518.26 |
$482.00 |
$250.00 |
$500.00 |
$400.00 |
$1,500.00 |
| 11 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,575.38 |
$2,450.82 |
$2,081.10 |
$1,800.00 |
$1,850.00 |
$1,800.00 |
$2,500.00 |
| 12 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,753.78 |
$1,974.27 |
$1,700.00 |
$1,450.00 |
$1,850.00 |
$1,450.00 |
$1,600.00 |
| 13 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$10.00 |
$14.98 |
$16.00 |
$10.00 |
$15.00 |
$15.00 |
$35.00 |
| 14 | 501(G) 6309 |
CLSM BACKFILL | 102 | CY |
$159.70 |
$170.20 |
$140.00 |
$225.00 |
$185.00 |
$150.00 |
$170.00 |
| 15 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$220.65 |
$288.67 |
$300.00 |
$390.00 |
$235.00 |
$300.00 |
$350.00 |
| 16 | 504(B) 1305 |
SAW-CUT GROOVING | 266.7 | SY |
$7.00 |
$14.30 |
$12.67 |
$10.50 |
$12.00 |
$10.50 |
$24.00 |
| 17 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$70.00 |
$98.35 |
$89.00 |
$85.00 |
$125.00 |
$95.00 |
$130.00 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 690 | LB |
$1.79 |
$2.66 |
$3.00 |
$4.00 |
$3.00 |
$3.00 |
$7.50 |
| 19 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,089.85 |
$1,477.30 |
$1,188.00 |
$1,250.00 |
$850.00 |
$1,400.00 |
$2,400.00 |
| 20 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,200.00 |
$1,477.30 |
$1,188.00 |
$1,250.00 |
$850.00 |
$1,400.00 |
$2,400.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 86.1 | CY |
$300.00 |
$396.22 |
$703.39 |
$700.00 |
$550.00 |
$750.00 |
$500.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 79.4 | CY |
$595.23 |
$573.22 |
$686.00 |
$800.00 |
$650.00 |
$750.00 |
$600.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 33,490 | LB |
$0.9000 |
$1.03 |
$1.02 |
$1.00 |
$2.25 |
$1.15 |
$1.20 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 78 | LF |
$31.54 |
$37.89 |
$32.87 |
$38.00 |
$40.00 |
$45.00 |
$65.00 |
| 25 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 245 | LF |
$40.11 |
$47.63 |
$39.97 |
$46.00 |
$40.00 |
$55.00 |
$75.00 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 78 | LF |
$15.23 |
$17.70 |
$15.00 |
$16.50 |
$40.00 |
$10.00 |
$150.00 |
| 27 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 245 | LF |
$12.35 |
$17.70 |
$12.00 |
$20.00 |
$40.00 |
$10.00 |
$110.00 |
| 28 | 514(K) 6260 |
(PL)PILOT HOLES | 135 | LF |
$175.00 |
$204.23 |
$210.00 |
$150.00 |
$175.00 |
$165.00 |
$150.00 |
| 29 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 578.16 | TON |
$45.00 |
$42.69 |
$42.00 |
$40.00 |
$42.50 |
$55.00 |
$45.00 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 192.72 | TON |
$36.00 |
$29.55 |
$35.00 |
$32.00 |
$27.00 |
$45.00 |
$37.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,446.27 |
$5,000.00 |
$4,000.00 |
$4,500.00 |
$11,000.00 |
$11,000.00 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$2,042.35 |
$2,000.00 |
$1,500.00 |
$7,500.00 |
$1,500.00 |
$9,000.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$8,441.71 |
$6,500.00 |
$2,400.00 |
$10,000.00 |
$8,854.00 |
$12,500.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,500.00 |
$2,042.35 |
$3,000.00 |
$1,750.00 |
$5,000.00 |
$1,275.00 |
$5,500.00 |
| 36 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$42,606.00 |
$31,792.58 |
$50,000.00 |
$55,000.00 |
$20,000.00 |
$56,250.00 |
$26,000.00 |