| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$10,000.00 |
$15,000.00 |
$19,923.45 |
$43,000.00 |
$12,000.00 |
$12,965.00 |
$35,000.00 |
$45,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 9,953 | CY |
$11.50 |
$6.00 |
$9.00 |
$9.30 |
$7.75 |
$8.50 |
$9.20 |
$9.50 |
$15.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 14,045 | CY |
$13.00 |
$7.00 |
$9.00 |
$10.96 |
$11.25 |
$11.00 |
$12.30 |
$12.00 |
$20.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$12,000.00 |
$9,478.25 |
$16,000.00 |
$10,000.00 |
$9,957.00 |
$35,000.00 |
$18,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 800 | LF |
$3.30 |
$1.30 |
$7.00 |
$3.96 |
$3.10 |
$3.50 |
$3.45 |
$6.00 |
$3.50 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 126 | LF |
$18.80 |
$15.00 |
$10.00 |
$19.74 |
$15.00 |
$15.50 |
$17.20 |
$17.50 |
$16.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 16,800 | SY |
$3.10 |
$2.89 |
$3.89 |
$3.84 |
$3.00 |
$3.50 |
$3.35 |
$5.85 |
$3.30 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 3.3 | AC |
$1,500.00 |
$1,785.00 |
$500.00 |
$2,370.89 |
$1,785.00 |
$1,800.00 |
$2,067.00 |
$1,800.00 |
$2,000.00 |
| 90 | 241 3100 |
MOWING | 6.6 | AC |
$200.00 |
$298.00 |
$100.00 |
$395.81 |
$349.00 |
$300.00 |
$345.00 |
$500.00 |
$350.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 775 | CY |
$75.00 |
$58.15 |
$56.00 |
$79.69 |
$61.50 |
$65.00 |
$59.10 |
$48.50 |
$70.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 4,258 | SY |
$8.60 |
$8.62 |
$7.00 |
$8.63 |
$7.00 |
$8.00 |
$22.20 |
$17.15 |
$7.00 |
| 120 | 325 0100 |
SEPARATOR FABRIC | 4,258 | SY |
$2.00 |
$2.50 |
$4.85 |
$1.99 |
$1.75 |
$2.50 |
$5.20 |
$6.50 |
$3.50 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 260 | TON |
$45.00 |
$39.83 |
$25.27 |
$46.49 |
$26.00 |
$45.00 |
$34.70 |
$35.00 |
$42.00 |
| 140 | 407(B)7300 |
TACK COAT | 414 | GAL |
$4.10 |
$5.25 |
$9.00 |
$5.31 |
$5.25 |
$5.00 |
$4.30 |
$4.60 |
$5.00 |
| 150 | 408 8100 |
PRIME COAT | 2,519 | GAL |
$4.30 |
$5.37 |
$4.00 |
$7.97 |
$5.37 |
$7.00 |
$8.55 |
$6.90 |
$6.50 |
| 160 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,300 | TON |
$90.00 |
$94.66 |
$127.00 |
$119.54 |
$112.00 |
$130.00 |
$106.50 |
$132.25 |
$115.00 |
| 170 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 200 | TON |
$150.00 |
$132.03 |
$220.00 |
$166.03 |
$132.00 |
$155.00 |
$133.00 |
$166.95 |
$145.00 |
| 180 | 509(D)0500 |
CLASS C CONCRETE | 15 | CY |
$450.00 |
$525.00 |
$325.00 |
$363.76 |
$400.00 |
$550.00 |
$660.00 |
$460.00 |
$500.00 |
| 190 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$25,000.00 |
$5,000.00 |
$15,000.00 |
$26,564.61 |
$35,000.00 |
$75,000.00 |
$37,465.00 |
$40,000.00 |
$18,000.00 |
| 200 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 60 | TON |
$65.00 |
$85.00 |
$60.00 |
$46.13 |
$66.00 |
$60.00 |
$67.90 |
$65.00 |
$62.00 |
| 210 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 100 | SY |
$3.80 |
$53.00 |
$3.63 |
$3.18 |
$7.50 |
$10.00 |
$9.30 |
$4.00 |
$10.00 |
| 220 | 613(A)5220 |
30" R.C.PIPE CLASS III | 154 | LF |
$100.00 |
$98.60 |
$120.00 |
$103.65 |
$95.00 |
$110.00 |
$126.00 |
$86.40 |
$120.00 |
| 230 | 613(B)5536 |
48" CORR. GALV. STEEL PIPE | 400 | LF |
$90.00 |
$100.00 |
$160.00 |
$241.20 |
$120.00 |
$130.00 |
$148.00 |
$145.00 |
$140.00 |
| 240 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 300 | LF |
$20.00 |
$9.00 |
$24.00 |
$14.00 |
$23.00 |
$20.00 |
$23.20 |
$24.00 |
$15.00 |
| 250 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$17.00 |
$9.00 |
$22.00 |
$13.66 |
$23.00 |
$25.00 |
$11.60 |
$22.00 |
$15.00 |
| 260 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,400.00 |
$3,200.00 |
$2,052.00 |
$1,147.97 |
$1,400.00 |
$1,500.00 |
$1,418.00 |
$2,052.00 |
$1,500.00 |
| 270 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,200.00 |
$1,385.35 |
$600.00 |
$1,284.73 |
$1,500.00 |
$860.00 |
$902.50 |
$650.00 |
$1,000.00 |
| 280 | 616(B)2352 |
12" POLYVINYL CHLORIDE (PVC) PIPE | 58 | LF |
$85.00 |
$92.00 |
$50.00 |
$90.22 |
$100.00 |
$40.00 |
$38.20 |
$60.00 |
$40.00 |
| 290 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$8,000.00 |
$12,618.19 |
$12,000.00 |
$12,000.00 |
$11,000.00 |
$10,000.00 |
$18,000.00 |
| 300 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,452 | SY |
$6.80 |
$5.70 |
$12.00 |
$7.44 |
$10.00 |
$4.50 |
$10.30 |
$4.75 |
$4.50 |
| 310 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 1,334 | SY |
$12.00 |
$9.00 |
$10.00 |
$6.51 |
$14.00 |
$7.00 |
$9.40 |
$6.50 |
$10.00 |
| 320 | 619(C)6600 |
SAWING PAVEMENT | 80 | LF |
$9.00 |
$9.00 |
$20.00 |
$3.98 |
$9.00 |
$15.00 |
$14.50 |
$20.00 |
$12.00 |
| 330 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 960 | LF |
$7.50 |
$6.25 |
$9.00 |
$9.30 |
$8.60 |
$7.00 |
$11.90 |
$10.50 |
$16.00 |
| 340 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,003 | CY |
$8.40 |
$8.00 |
$10.00 |
$9.30 |
$16.00 |
$10.00 |
$10.30 |
$10.00 |
$12.00 |
| 350 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 640 | CY |
$12.20 |
$30.00 |
$30.00 |
$15.94 |
$25.00 |
$22.00 |
$31.50 |
$15.00 |
$20.00 |
| 360 | 501(F)1700 |
GRANULAR BACKFILL | 905 | CY |
$80.00 |
$52.22 |
$75.00 |
$52.75 |
$65.00 |
$55.00 |
$96.10 |
$35.00 |
$60.00 |
| 370 | 509(A)0210 |
CLASS AA CONCRETE | 537.5 | CY |
$750.00 |
$501.32 |
$520.00 |
$456.89 |
$565.00 |
$600.00 |
$674.00 |
$510.00 |
$620.00 |
| 380 | 511(A)2210 |
REINFORCING STEEL | 82,689 | LB |
$1.40 |
$1.14 |
$1.33 |
$0.9500 |
$1.00 |
$1.55 |
$1.80 |
$1.00 |
$1.70 |
| 390 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 220 | TON |
$55.00 |
$47.15 |
$50.00 |
$44.80 |
$55.00 |
$50.00 |
$52.00 |
$65.00 |
$60.00 |
| 400 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$25,745.00 |
$35,000.00 |
$35,397.34 |
$39,000.00 |
$25,000.00 |
$27,440.00 |
$45,000.00 |
$35,000.00 |
| 410 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 2,400 | LF |
$0.6000 |
$0.5000 |
$1.00 |
$0.6600 |
$0.5900 |
$0.6000 |
$0.5800 |
$0.6000 |
$0.5500 |
| 420 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 400 | EA |
$12.00 |
$0.5000 |
$0.6000 |
$0.6600 |
$0.5900 |
$1.50 |
$0.5800 |
$0.6000 |
$0.5500 |
| 430 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 1,920 | LF |
$1.10 |
$0.1000 |
$0.1300 |
$0.1300 |
$0.1200 |
$2.00 |
$0.4100 |
$0.1200 |
$0.1200 |
| 440 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,320 | SD |
$0.3000 |
$0.0500 |
$0.0600 |
$0.0700 |
$0.0600 |
$0.0200 |
$0.1700 |
$0.0600 |
$0.0600 |
| 450 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 680 | SD |
$1.20 |
$3.00 |
$3.63 |
$3.98 |
$3.50 |
$1.00 |
$2.30 |
$3.60 |
$3.50 |
| 460 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 220 | SD |
$0.9000 |
$10.00 |
$12.09 |
$13.28 |
$11.75 |
$3.00 |
$4.65 |
$12.00 |
$12.00 |
| 470 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 880 | SD |
$0.1000 |
$0.0500 |
$0.0600 |
$0.0700 |
$0.1000 |
$2.00 |
$2.30 |
$0.0600 |
$0.0600 |
| 480 | 880(C)6420 |
WING BARRICADES | 720 | SD |
$2.60 |
$1.00 |
$1.21 |
$1.33 |
$1.50 |
$0.0200 |
$1.15 |
$1.20 |
$1.20 |
| 490 | 880(D)6500 |
VERTICAL PANELS | 3,080 | SD |
$0.3000 |
$0.0500 |
$0.0600 |
$0.0700 |
$0.0500 |
$0.0200 |
$0.2900 |
$0.0600 |
$0.0600 |
| 500 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,840 | SD |
$0.1000 |
$0.0500 |
$0.0600 |
$0.0700 |
$0.0500 |
$0.2500 |
$0.5800 |
$6.00 |
$0.0600 |
| 510 | 880(F)6700 |
DRUMS | 1,560 | SD |
$0.2000 |
$0.0500 |
$0.0600 |
$0.0700 |
$0.1000 |
$1.00 |
$0.5800 |
$0.0600 |
$0.0600 |
| 520 | 880(G)6805 |
CHANNELIZER CONES | 1,160 | SD |
$2.00 |
$0.0500 |
$0.0600 |
$0.0700 |
$0.1000 |
$0.0200 |
$0.5800 |
$0.0600 |
$0.0600 |
| 530 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$10.20 |
$5.00 |
$6.04 |
$6.64 |
$5.00 |
$15.00 |
$20.80 |
$6.00 |
$7.00 |
| 540 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,500.00 |
$25.00 |
$30.21 |
$33.21 |
$30.00 |
$600.00 |
$57.90 |
$30.00 |
$50.00 |
| 550 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$273.00 |
$100.00 |
$120.00 |
$132.82 |
$125.00 |
$500.00 |
$116.00 |
$120.00 |
$120.00 |
| 560 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 42.5 | SF |
$23.00 |
$16.00 |
$20.00 |
$21.25 |
$18.75 |
$40.00 |
$17.40 |
$19.20 |
$20.00 |
| 570 | 851(C)2415 |
2" SQUARE TUBE POST | 83 | LF |
$8.30 |
$10.00 |
$13.00 |
$13.28 |
$11.75 |
$6.00 |
$4.05 |
$12.00 |
$12.00 |
| 580 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 4,000 | LF |
$1.30 |
$0.6500 |
$1.00 |
$0.8600 |
$0.7500 |
$2.00 |
$0.9800 |
$0.7800 |
$0.7500 |
| 590 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$6,500.00 |
$5,100.00 |
$9,961.73 |
$15,000.00 |
$9,000.00 |
$8,683.00 |
$15,000.00 |
$12,000.00 |
| 600 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$2,500.00 |
$1,593.88 |
$1,275.00 |
$3,500.00 |
$5,500.00 |
$2,500.00 |
$5,000.00 |
| 610 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$105,000.00 |
$105,388.35 |
$70,000.00 |
$102,354.08 |
$112,000.00 |
$150,000.00 |
$16,760.00 |
$150,000.00 |
$96,000.00 |