| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$14,000.00 |
$15,000.00 |
$7,500.00 |
| 2 | 202(C) 0182 |
ROCK EXCAVATION | 18,330 | CY |
$13.00 |
$16.00 |
$20.00 |
$16.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$9,000.00 |
$9,500.00 |
$15,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,928 | LF |
$1.80 |
$3.99 |
$3.99 |
$3.99 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 162 | LF |
$10.00 |
$39.00 |
$39.00 |
$39.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 7,215 | SY |
$3.10 |
$6.95 |
$6.95 |
$6.95 |
| 7 | 325 5271 |
SEPARATOR FABRIC | 5,025 | SY |
$1.60 |
$1.50 |
$1.75 |
$1.75 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,536 | TON |
$26.00 |
$38.00 |
$35.00 |
$38.28 |
| 9 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 76 | LF |
$30.60 |
$50.00 |
$50.00 |
$25.03 |
| 10 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$664.00 |
$400.00 |
$500.00 |
$395.69 |
| 11 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$1,000.00 |
$5,000.00 |
$10,000.00 |
$10,000.00 |
| 12 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 300 | LF |
$19.00 |
$20.00 |
$22.00 |
$20.00 |
| 13 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,439.00 |
$1,625.00 |
$1,300.00 |
$1,625.00 |
| 14 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,481.00 |
$2,500.00 |
$2,700.00 |
$2,500.00 |
| 15 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,736 | LF |
$5.50 |
$5.00 |
$5.30 |
$5.00 |
| 16 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 1 | EA |
$400.00 |
$1,500.00 |
$1,100.00 |
$500.00 |
| 17 | 626(A) 1257 |
MONUMENTS | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$100.00 |
| 18 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 257 | CY |
$9.55 |
$25.00 |
$10.00 |
$56.00 |
| 19 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 169 | CY |
$20.50 |
$65.00 |
$40.00 |
$56.00 |
| 20 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 136 | CY |
$21.30 |
$35.00 |
$20.00 |
$58.00 |
| 21 | 501(F) 6352 |
GRANULAR BACKFILL | 144 | CY |
$60.50 |
$75.00 |
$75.00 |
$100.00 |
| 22 | 504(E) 6190 |
42" F-SHAPED PARAPET | 165.66 | LF |
$86.50 |
$175.00 |
$100.00 |
$193.00 |
| 23 | 508 6359 |
PRECAST ARCH CULVERT | 29 | LF |
$3,600.00 |
$7,900.00 |
$8,750.00 |
$9,447.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 10 | CY |
$516.00 |
$700.00 |
$500.00 |
$1,332.00 |
| 25 | 509(B) 1328 |
CLASS A CONCRETE | 225 | CY |
$679.00 |
$600.00 |
$465.00 |
$516.00 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 17,207 | LB |
$1.00 |
$1.10 |
$1.00 |
$0.8000 |
| 27 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,517 | LB |
$1.60 |
$2.00 |
$3.00 |
$1.25 |
| 28 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 148 | SY |
$4.50 |
$5.40 |
$5.40 |
$5.40 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,735 | TON |
$36.50 |
$45.00 |
$45.00 |
$73.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 684 | TON |
$31.00 |
$39.00 |
$37.00 |
$56.00 |
| 31 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 2,735 | SY |
$1.50 |
$1.50 |
$1.50 |
$19.00 |
| 32 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$15,000.00 |
$16,073.00 |
| 33 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$26.00 |
$25.00 |
$25.00 |
$25.00 |
| 34 | 851(C) 8324 |
2" SQUARE TUBE POST | 25 | LF |
$10.50 |
$15.00 |
$15.00 |
$15.00 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$2,400.00 |
$2,400.00 |
$2,400.00 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$9,557.00 |
$6,500.00 |
$7,600.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$1,275.00 |
$3,000.00 |
$2,000.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$61,400.00 |
$84,500.00 |
$119,400.00 |
$128,470.00 |