| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$10,000.00 |
$7,000.00 |
$13,500.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 927.71 | CY |
$8.64 |
$10.00 |
$11.81 |
$16.00 |
$20.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 402.3 | CY |
$9.43 |
$13.00 |
$20.00 |
$17.00 |
$20.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 559 | LF |
$1.50 |
$2.50 |
$5.00 |
$4.00 |
$8.50 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 60 | LF |
$6.00 |
$12.00 |
$11.00 |
$18.50 |
$22.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,500 | SY |
$3.50 |
$3.50 |
$3.00 |
$5.00 |
$2.50 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 123.6 | CY |
$40.00 |
$67.00 |
$70.00 |
$70.00 |
$75.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 38 | TON |
$58.25 |
$35.00 |
$40.00 |
$60.00 |
$115.00 |
| 9 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 56 | GAL |
$6.00 |
$10.00 |
$12.06 |
$11.00 |
$7.00 |
| 10 | 408 5774 |
PRIME COAT | 693.4 | GAL |
$8.45 |
$4.35 |
$5.25 |
$4.35 |
$5.00 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 111.7 | TON |
$75.00 |
$229.45 |
$276.74 |
$248.00 |
$130.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 74.5 | TON |
$90.00 |
$234.45 |
$282.77 |
$250.00 |
$140.00 |
| 13 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,750.00 |
$1,500.00 |
$2,200.00 |
$1,500.00 |
$1,400.00 |
| 14 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,700.00 |
$2,200.00 |
$1,700.00 |
$1,800.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 210 | CY |
$10.00 |
$10.00 |
$15.00 |
$19.00 |
$35.00 |
| 16 | 501(G) 6309 |
CLSM BACKFILL | 128 | CY |
$159.70 |
$150.00 |
$145.00 |
$165.00 |
$165.00 |
| 17 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$220.65 |
$338.00 |
$290.00 |
$270.00 |
$350.00 |
| 18 | 504(A) 1304 |
APPROACH SLAB | 114.8 | SY |
$7.00 |
$175.00 |
$215.00 |
$225.00 |
$250.00 |
| 19 | 504(B) 1305 |
SAW-CUT GROOVING | 350 | SY |
$7.00 |
$7.70 |
$9.29 |
$7.70 |
$30.00 |
| 20 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 276.4 | LF |
$70.00 |
$80.00 |
$85.00 |
$98.00 |
$115.00 |
| 21 | 506(A) 1322 |
STRUCTURAL STEEL | 600 | LB |
$1.79 |
$3.00 |
$2.55 |
$3.40 |
$15.00 |
| 22 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,089.85 |
$1,000.00 |
$837.00 |
$1,100.00 |
$1,100.00 |
| 23 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,200.00 |
$1,000.00 |
$837.00 |
$1,100.00 |
$1,200.00 |
| 24 | 509(A) 1326 |
CLASS AA CONCRETE | 83.7 | CY |
$300.00 |
$700.00 |
$750.00 |
$750.00 |
$700.00 |
| 25 | 509(B) 1328 |
CLASS A CONCRETE | 69.8 | CY |
$595.23 |
$750.00 |
$700.00 |
$750.00 |
$450.00 |
| 26 | 511(A) 1332 |
REINFORCING STEEL | 29,180 | LB |
$0.9000 |
$1.00 |
$1.02 |
$1.15 |
$1.15 |
| 27 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 218 | LF |
$31.54 |
$28.00 |
$37.50 |
$45.00 |
$55.00 |
| 28 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 707 | LF |
$40.11 |
$34.00 |
$37.50 |
$55.00 |
$60.00 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 218 | LF |
$15.23 |
$12.00 |
$12.00 |
$10.00 |
$60.00 |
| 30 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 707 | LF |
$12.36 |
$14.60 |
$12.00 |
$10.00 |
$40.00 |
| 31 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 32 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,410 | TON |
$45.00 |
$42.00 |
$45.00 |
$51.00 |
$50.00 |
| 33 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 470 | TON |
$36.00 |
$35.00 |
$37.00 |
$45.00 |
$45.00 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$15,000.00 |
$7,000.00 |
$12,000.00 |
$15,000.00 |
| 35 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 1,352.68 | LF |
$0.1500 |
$1.25 |
$1.51 |
$1.25 |
$2.00 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$2,200.00 |
$2,653.00 |
$2,200.00 |
$6,000.00 |
| 37 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$2,200.00 |
$6,000.00 |
$6,440.00 |
$16,000.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$42,588.37 |
$55,000.00 |
$48,000.00 |
$58,700.00 |
$21,000.00 |