| 10 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$17,500.00 |
$37,800.00 |
$27,708.00 |
$29,000.00 |
$17,500.00 |
$5,000.00 |
$20,000.00 |
$20,000.00 |
$10.45 |
| 20 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,105 | LF |
$5.00 |
$3.27 |
$3.17 |
$4.00 |
$2.75 |
$6.00 |
$2.65 |
$2.70 |
$3.19 |
| 30 | 230(A) 2806 |
SOLID SLAB SODDING | 350 | SY |
$15.00 |
$10.44 |
$10.14 |
$10.45 |
$15.00 |
$8.00 |
$11.95 |
$7.45 |
$10.19 |
| 40 | 408 5774 |
PRIME COAT | 200 | GAL |
$6.00 |
$6.30 |
$24.98 |
$6.30 |
$6.00 |
$12.00 |
$6.60 |
$6.60 |
$9.83 |
| 50 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 400 | TON |
$150.00 |
$157.50 |
$133.87 |
$154.50 |
$156.25 |
$170.00 |
$180.00 |
$150.00 |
$188.23 |
| 60 | 412 5267 |
COLD MILLING PAVEMENT | 1,750 | SY |
$10.00 |
$10.50 |
$11.14 |
$12.00 |
$10.00 |
$18.00 |
$15.50 |
$11.00 |
$12.99 |
| 70 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 515 | LF |
$5.00 |
$3.68 |
$6.63 |
$4.00 |
$10.00 |
$7.00 |
$6.50 |
$5.00 |
$4.61 |
| 80 | 619(C) 0924 |
SAWING PAVEMENT | 50 | LF |
$15.00 |
$3.15 |
$15.88 |
$8.00 |
$8.00 |
$15.00 |
$18.00 |
$5.00 |
$3.23 |
| 90 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 480.25 | LF |
$25.00 |
$21.00 |
$17.85 |
$21.00 |
$24.95 |
$20.00 |
$22.00 |
$19.25 |
$20.49 |
| 100 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,100.00 |
$1,050.00 |
$1,683.04 |
$1,100.00 |
$1,247.52 |
$1,850.00 |
$1,100.00 |
$1,820.00 |
$1,024.69 |
| 110 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$3,000.00 |
$2,436.00 |
$2,550.07 |
$2,450.00 |
$3,493.07 |
$2,800.00 |
$2,552.00 |
$2,750.00 |
$2,377.28 |
| 120 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$1,785.00 |
$1,938.05 |
$1,785.00 |
$2,370.30 |
$2,400.00 |
$1,870.00 |
$2,100.00 |
$1,741.97 |
| 130 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$350.00 |
$170.02 |
$479.15 |
$240.00 |
$200.00 |
$350.00 |
$285.00 |
$300.00 |
$133.45 |
| 140 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$50,000.00 |
$58,886.38 |
$28,535.24 |
$51,050.00 |
$75,000.00 |
$30,000.00 |
$50,000.00 |
$54,500.00 |
$70,234.45 |
| 150 | 504(A) 1304 |
APPROACH SLAB | 143.2 | SY |
$350.00 |
$213.27 |
$263.88 |
$242.00 |
$225.00 |
$350.00 |
$325.00 |
$250.00 |
$287.86 |
| 160 | 504(B) 1305 |
SAW-CUT GROOVING | 1,002 | SY |
$5.00 |
$4.33 |
$4.13 |
$4.25 |
$4.05 |
$15.00 |
$4.50 |
$4.45 |
$5.69 |
| 170 | 504(C) 6250 |
SEALED EXPANSION JOINT | 66.4 | LF |
$350.00 |
$284.41 |
$317.27 |
$270.80 |
$395.62 |
$275.00 |
$350.00 |
$290.00 |
$313.71 |
| 180 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 601 | LF |
$120.00 |
$73.06 |
$109.77 |
$89.00 |
$105.00 |
$115.00 |
$105.00 |
$110.00 |
$116.12 |
| 190 | 506(A) 1322 |
STRUCTURAL STEEL | 2,000 | LB |
$7.00 |
$13.15 |
$9.97 |
$5.20 |
$6.90 |
$8.00 |
$10.50 |
$8.50 |
$8.74 |
| 200 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,500.00 |
$2,378.10 |
$2,703.99 |
$1,617.00 |
$2,920.00 |
$2,800.00 |
$3,058.00 |
$3,365.00 |
$2,651.84 |
| 210 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$2,500.00 |
$2,057.10 |
$2,442.06 |
$1,617.00 |
$2,605.00 |
$2,500.00 |
$2,728.00 |
$3,000.00 |
$2,651.84 |
| 220 | 509 5000 |
ELASTOMERIC COATING | 875 | SF |
$25.00 |
$16.91 |
$22.44 |
$18.25 |
$10.00 |
$15.00 |
$17.50 |
$19.00 |
$30.90 |
| 230 | 509(A) 1326 |
CLASS AA CONCRETE | 230 | CY |
$900.00 |
$762.70 |
$827.40 |
$875.00 |
$699.00 |
$1,100.00 |
$975.00 |
$900.00 |
$1,087.87 |
| 240 | 509(D) 1331 |
CLASS C CONCRETE | 13.1 | CY |
$600.00 |
$597.32 |
$976.09 |
$350.00 |
$625.00 |
$500.00 |
$720.00 |
$600.00 |
$414.37 |
| 250 | 511 6306 |
MECHANICAL SPLICES | 697 | EA |
$50.00 |
$41.65 |
$28.88 |
$43.00 |
$35.00 |
$30.00 |
$36.00 |
$45.00 |
$32.08 |
| 260 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 62,240 | LB |
$1.20 |
$1.09 |
$1.27 |
$1.20 |
$2.25 |
$2.00 |
$1.28 |
$1.25 |
$1.25 |
| 270 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$40,000.00 |
$34,903.40 |
$46,557.69 |
$36,958.46 |
$34,250.00 |
$55,000.00 |
$35,882.00 |
$78,300.00 |
$44,067.34 |
| 280 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$10,000.00 |
$4,412.68 |
$18,205.44 |
$4,765.00 |
$4,330.00 |
$5,000.00 |
$4,536.00 |
$5,000.00 |
$14,046.89 |
| 290 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 81 | SY |
$500.00 |
$535.00 |
$257.69 |
$599.30 |
$400.00 |
$250.00 |
$628.00 |
$628.00 |
$731.88 |
| 300 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 40 | SY |
$650.00 |
$749.00 |
$521.82 |
$985.97 |
$400.00 |
$500.00 |
$1,033.00 |
$1,032.00 |
$961.58 |
| 310 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 691 | SY |
$5.00 |
$4.28 |
$4.08 |
$4.20 |
$5.00 |
$5.00 |
$4.45 |
$3.25 |
$4.10 |
| 320 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$50.00 |
$37.45 |
$48.96 |
$40.45 |
$32.00 |
$30.00 |
$38.50 |
$42.00 |
$49.19 |
| 330 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 3 | GAL |
$150.00 |
$64.20 |
$127.50 |
$69.30 |
$80.00 |
$100.00 |
$67.00 |
$72.00 |
$128.09 |
| 340 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 148.5 | SY |
$850.00 |
$800.36 |
$841.52 |
$847.48 |
$400.00 |
$400.00 |
$830.00 |
$905.00 |
$845.37 |
| 350 | 523(A) 6550 |
SEALER CRACK PREPARATION | 260.5 | LF |
$5.00 |
$4.28 |
$4.08 |
$4.20 |
$3.00 |
$4.00 |
$4.45 |
$5.00 |
$4.10 |
| 360 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$150.00 |
$160.50 |
$153.00 |
$165.00 |
$80.00 |
$125.00 |
$167.00 |
$150.00 |
$153.70 |
| 370 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 148.5 | SY |
$60.00 |
$56.71 |
$48.96 |
$61.25 |
$32.00 |
$65.00 |
$39.00 |
$64.00 |
$49.19 |
| 380 | 540 4505 |
(PL)REPAIR BRIDGE ITEMS | 12 | EA |
$5,000.00 |
$5,189.50 |
$4,739.04 |
$5,495.50 |
$5,291.00 |
$7,500.00 |
$5,500.00 |
$5,900.00 |
$4,234.91 |
| 390 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 12 | EA |
$1,000.00 |
$2,610.80 |
$2,819.33 |
$2,818.20 |
$2,862.00 |
$3,500.00 |
$2,800.00 |
$2,950.00 |
$2,595.41 |
| 400 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 495 | TON |
$65.00 |
$51.44 |
$50.07 |
$40.00 |
$67.08 |
$75.00 |
$50.00 |
$50.00 |
$30.56 |
| 410 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$128,400.00 |
$78,495.13 |
$137,000.00 |
$175,000.00 |
$30,000.00 |
$138,000.00 |
$200,000.00 |
$161,539.23 |
| 420 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 150 | SD |
$150.00 |
$84.00 |
$76.50 |
$84.00 |
$99.80 |
$75.00 |
$89.00 |
$80.00 |
$81.98 |
| 430 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 27 | SF |
$30.00 |
$21.00 |
$28.56 |
$21.00 |
$24.95 |
$65.00 |
$23.00 |
$29.00 |
$20.49 |
| 440 | 851(C) 8324 |
2" SQUARE TUBE POST | 45 | LF |
$15.00 |
$10.50 |
$6.12 |
$11.00 |
$12.48 |
$10.00 |
$11.25 |
$6.20 |
$10.25 |
| 450 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 17 | EA |
$20.00 |
$15.75 |
$13.52 |
$15.50 |
$18.71 |
$15.00 |
$17.00 |
$14.00 |
$15.37 |
| 460 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 5,840 | LF |
$1.50 |
$1.05 |
$0.9000 |
$1.05 |
$1.25 |
$1.25 |
$1.15 |
$0.5000 |
$1.02 |
| 470 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,225 | LF |
$0.5000 |
$0.2600 |
$0.4700 |
$0.2700 |
$0.3100 |
$0.5000 |
$0.3000 |
$1.10 |
$0.2600 |
| 480 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 4,318 | LF |
$1.00 |
$0.5300 |
$1.09 |
$0.5300 |
$0.6200 |
$1.50 |
$0.5500 |
$1.10 |
$0.5100 |
| 490 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 807 | EA |
$0.7500 |
$1.05 |
$1.02 |
$1.05 |
$1.25 |
$0.5500 |
$1.15 |
$1.05 |
$1.02 |
| 500 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,138 | LF |
$0.4500 |
$0.2600 |
$0.7000 |
$0.2700 |
$0.3100 |
$1.50 |
$0.3000 |
$0.7000 |
$0.2600 |
| 510 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 300 | SD |
$12.00 |
$5.25 |
$18.36 |
$5.25 |
$6.24 |
$18.00 |
$5.60 |
$18.50 |
$5.12 |
| 520 | 871(C) 8707 |
RELOCATION OF CONSTRUCTION ZONE QUADGUARD IMPACT ATTENUATOR | 2 | EA |
$900.00 |
$262.50 |
$969.03 |
$263.00 |
$311.88 |
$1,000.00 |
$280.00 |
$1,600.00 |
$256.17 |
| 530 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,320 | LF |
$30.00 |
$26.25 |
$11.83 |
$28.35 |
$37.43 |
$20.00 |
$32.00 |
$12.00 |
$27.67 |
| 540 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,320 | LF |
$10.00 |
$6.30 |
$2.91 |
$2.10 |
$9.98 |
$4.00 |
$4.00 |
$3.00 |
$2.05 |
| 550 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 990 | SD |
$0.7500 |
$2.63 |
$1.22 |
$2.60 |
$2.50 |
$1.20 |
$5.30 |
$1.25 |
$2.56 |
| 560 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 990 | SD |
$1.00 |
$2.63 |
$1.22 |
$2.65 |
$2.50 |
$1.20 |
$2.80 |
$1.25 |
$2.56 |
| 570 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,960 | SD |
$1.50 |
$1.05 |
$1.22 |
$1.05 |
$1.00 |
$1.20 |
$1.10 |
$1.25 |
$1.02 |
| 580 | 880(C) 8848 |
WING BARRICADES | 660 | SD |
$1.50 |
$1.05 |
$0.1000 |
$1.05 |
$1.00 |
$0.1000 |
$1.10 |
$0.1100 |
$1.02 |
| 590 | 880(F) 8878 |
DRUMS | 3,058 | SD |
$0.4000 |
$1.05 |
$1.02 |
$1.05 |
$1.00 |
$1.00 |
$1.10 |
$1.05 |
$1.02 |
| 600 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 328 | SD |
$25.00 |
$7.88 |
$16.32 |
$7.90 |
$14.97 |
$16.00 |
$8.35 |
$32.00 |
$7.69 |
| 610 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$4,510.00 |
$11,648.70 |
$4,600.00 |
$8,200.00 |
$15,000.00 |
$6,300.00 |
$4,750.00 |
$5,759.22 |
| 620 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$92,551.95 |
$135,597.44 |
$95,000.00 |
$95,000.00 |
$160,000.00 |
$102,300.00 |
$75,000.00 |
$182,925.62 |