| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,000.00 |
$17,410.00 |
$10,000.00 |
$14,125.00 |
$15,000.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 325 | CY |
$8.00 |
$38.00 |
$18.00 |
$31.92 |
$50.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$4,000.00 |
$10,155.00 |
$5,500.00 |
$16,950.00 |
$10,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,600 | LF |
$2.00 |
$4.10 |
$1.90 |
$4.29 |
$8.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 80 | LF |
$8.00 |
$14.40 |
$20.00 |
$15.09 |
$35.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,230 | SY |
$2.00 |
$4.50 |
$9.60 |
$4.69 |
$8.00 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 23 | TON |
$45.00 |
$107.00 |
$44.50 |
$81.12 |
$80.00 |
| 8 | 407(B) 0250 |
TACK COAT | 1,400 | GAL |
$5.00 |
$3.25 |
$3.30 |
$3.39 |
$5.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,205 | TON |
$150.00 |
$124.00 |
$132.25 |
$129.95 |
$135.00 |
| 10 | 412 5267 |
COLD MILLING PAVEMENT | 2,608 | SY |
$5.00 |
$6.05 |
$11.50 |
$10.17 |
$16.00 |
| 11 | 509(B) 0321 |
CLASS A CONCRETE | 10 | CY |
$1,200.00 |
$1,066.00 |
$775.00 |
$1,360.18 |
$1,100.00 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$500.00 |
$882.50 |
$375.00 |
$733.48 |
$900.00 |
| 13 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$6,821.00 |
$5,500.00 |
$11,300.00 |
$12,000.00 |
| 14 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 668 | LF |
$5.00 |
$5.65 |
$4.62 |
$5.65 |
$6.00 |
| 15 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 387.5 | LF |
$20.00 |
$21.60 |
$22.00 |
$22.60 |
$24.00 |
| 16 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,242.00 |
$2,300.00 |
$2,344.75 |
$2,500.00 |
| 17 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$2,026.00 |
$2,050.00 |
$2,118.75 |
$2,250.00 |
| 18 | 501(G) 6309 |
CLSM BACKFILL | 151.2 | CY |
$200.00 |
$170.50 |
$215.00 |
$257.75 |
$200.00 |
| 19 | 504(A) 1304 |
APPROACH SLAB | 227.8 | SY |
$300.00 |
$265.00 |
$282.50 |
$353.74 |
$340.00 |
| 20 | 504(B) 1305 |
SAW-CUT GROOVING | 592.1 | SY |
$5.00 |
$5.40 |
$5.50 |
$5.65 |
$10.00 |
| 21 | 504(C) 6250 |
SEALED EXPANSION JOINT | 35.17 | LF |
$350.00 |
$312.00 |
$330.00 |
$511.50 |
$400.00 |
| 22 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 333 | LF |
$95.00 |
$107.50 |
$108.00 |
$125.81 |
$180.00 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 67,280 | LB |
$2.00 |
$2.10 |
$2.28 |
$2.57 |
$2.40 |
| 24 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$1,500.00 |
$1,357.00 |
$1,625.00 |
$1,541.60 |
$1,100.00 |
| 25 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,500.00 |
$757.50 |
$825.00 |
$1,541.60 |
$1,100.00 |
| 26 | 509 6152 |
SPECIAL CONCRETE FINISH | 74 | SY |
$120.00 |
$102.50 |
$110.00 |
$107.35 |
$115.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 94.5 | CY |
$1,000.00 |
$765.50 |
$985.00 |
$1,319.25 |
$1,100.00 |
| 28 | 509(B) 1328 |
CLASS A CONCRETE | 30.6 | CY |
$1,200.00 |
$1,388.00 |
$1,025.00 |
$1,312.72 |
$4,200.00 |
| 29 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 28,800 | LB |
$1.10 |
$1.85 |
$1.26 |
$1.30 |
$1.50 |
| 30 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 290 | SY |
$5.00 |
$4.30 |
$4.40 |
$5.65 |
$6.00 |
| 31 | 523(A) 6550 |
SEALER CRACK PREPARATION | 33.75 | LF |
$5.00 |
$4.30 |
$4.40 |
$11.30 |
$6.00 |
| 32 | 523(B) 6560 |
SEALER RESIN | 0.4 | GAL |
$150.00 |
$162.00 |
$132.00 |
$226.00 |
$150.00 |
| 33 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 144.9 | SF |
$75.00 |
$86.40 |
$99.00 |
$90.40 |
$96.00 |
| 34 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 40 | SY |
$45.00 |
$43.20 |
$49.50 |
$45.20 |
$50.00 |
| 35 | 540 4501 |
(PL)REPAIR BRIDGE ITEMS | 20 | SY |
$800.00 |
$810.00 |
$820.00 |
$847.50 |
$900.00 |
| 36 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,180 | TON |
$60.00 |
$51.40 |
$50.50 |
$61.09 |
$65.00 |
| 37 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 215 | TON |
$50.00 |
$43.20 |
$40.00 |
$49.77 |
$60.00 |
| 38 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$60,000.00 |
$39,340.00 |
$105,000.00 |
$113,000.00 |
$60,000.00 |
| 39 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$15.00 |
$14.00 |
$14.30 |
$14.63 |
$17.00 |
| 40 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,740 | SD |
$0.5000 |
$0.1100 |
$0.0500 |
$0.1100 |
$0.2000 |
| 41 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$1.00 |
$0.5400 |
$0.2500 |
$0.5700 |
$1.00 |
| 42 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 900 | SD |
$1.50 |
$0.5400 |
$0.2500 |
$0.5700 |
$1.00 |
| 43 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 900 | SD |
$1.00 |
$5.40 |
$3.00 |
$5.65 |
$6.00 |
| 44 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,800 | SD |
$0.5000 |
$0.6500 |
$0.5000 |
$0.6800 |
$1.00 |
| 45 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 208 | SD |
$20.00 |
$7.55 |
$4.00 |
$7.91 |
$8.00 |
| 46 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 2,260 | LF |
$0.5000 |
$1.40 |
$2.75 |
$1.47 |
$1.80 |
| 47 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$10,910.00 |
$7,500.00 |
$5,650.00 |
$10,000.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$73,000.00 |
$83,451.53 |
$70,000.00 |
$87,420.76 |
$70,000.00 |