| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 8,429 | CY |
$9.50 |
$15.00 |
$18.05 |
$24.15 |
| 2 | 310(B) 0149 |
SUBGRADE, METHOD B | 68,298 | SY |
$1.95 |
$3.00 |
$3.98 |
$1.65 |
| 3 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,624 | TON |
$24.00 |
$35.00 |
$30.80 |
$43.55 |
| 4 | 407(B) 0250 |
TACK COAT | 3,255 | GAL |
$2.80 |
$3.50 |
$3.80 |
$2.80 |
| 5 | 408 5774 |
PRIME COAT | 17,074 | GAL |
$4.50 |
$4.00 |
$4.30 |
$1.25 |
| 6 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 14,853 | TON |
$78.00 |
$89.50 |
$89.00 |
$94.85 |
| 7 | 411(D) 5975 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 5,505 | TON |
$88.00 |
$93.50 |
$93.10 |
$118.15 |
| 8 | 412 5267 |
COLD MILLING PAVEMENT | 23,446 | SY |
$3.00 |
$3.00 |
$3.10 |
$4.50 |
| 9 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 3,342 | SY |
$35.00 |
$25.00 |
$28.00 |
$32.60 |
| 10 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 7,500 | SY |
$40.00 |
$30.00 |
$87.00 |
$78.20 |
| 11 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 2,750 | CY |
$160.00 |
$210.00 |
$190.00 |
$243.50 |
| 12 | 415 6300 |
CONCRETE JOINT SEALING | 80,360 | LF |
$1.50 |
$3.00 |
$2.80 |
$3.05 |
| 13 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 94,581 | SY |
$3.00 |
$5.35 |
$3.87 |
$4.05 |
| 14 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,300 | SY |
$6.40 |
$5.00 |
$5.40 |
$15.95 |
| 15 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 225 | SY |
$10.00 |
$9.00 |
$10.50 |
$27.35 |
| 16 | 619(C) 0924 |
SAWING PAVEMENT | 181 | LF |
$15.00 |
$10.00 |
$9.90 |
$5.00 |
| 17 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 18 | EA |
$120.00 |
$85.00 |
$209.00 |
$94.65 |
| 18 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 4 | EA |
$170.00 |
$200.00 |
$247.00 |
$223.00 |
| 19 | 629(C) 4960 |
MAILBOX | 27 | EA |
$70.00 |
$25.00 |
$27.50 |
$28.00 |
| 20 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 27 | EA |
$35.00 |
$10.00 |
$39.00 |
$277.00 |
| 21 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 13 | EA |
$125.00 |
$150.00 |
$220.00 |
$167.00 |
| 22 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 80 | SD |
$80.00 |
$250.00 |
$96.00 |
$278.50 |
| 23 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 127,512 | LF |
$0.5000 |
$0.3400 |
$0.4000 |
$0.3800 |
| 24 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 210 | LF |
$1.15 |
$4.00 |
$1.61 |
$4.50 |
| 25 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 42 | LF |
$3.00 |
$8.00 |
$2.15 |
$9.00 |
| 26 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 1 | EA |
$400.00 |
$500.00 |
$1,042.00 |
$557.00 |
| 27 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 1 | EA |
$240.00 |
$250.00 |
$658.00 |
$280.00 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$50,000.00 |
$386,000.00 |
$220,300.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$4,500.00 |
$8,500.00 |
$12,000.00 |
$5,570.00 |