| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$48,498.27 |
$103,000.00 |
$39,000.00 |
| 2 | 202(D) 1302 |
UNCLASSIFIED BORROW | 731 | CY |
$32.00 |
$45.48 |
$28.00 |
$25.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$21,742.05 |
$8,500.00 |
$36,290.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 325 | LF |
$4.50 |
$2.29 |
$3.00 |
$2.25 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 300 | LF |
$11.56 |
$14.18 |
$17.00 |
$13.90 |
| 6 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 4 | EA |
$357.52 |
$207.90 |
$250.00 |
$204.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 17,923 | SY |
$3.00 |
$2.29 |
$3.25 |
$2.25 |
| 8 | 510(D) 6341 |
MSE RETAINING WALL | 35 | SY |
$694.75 |
$409.08 |
$469.00 |
$391.00 |
| 9 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 260 | LF |
$22.62 |
$24.35 |
$26.00 |
$27.30 |
| 10 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 109 | LF |
$37.00 |
$56.84 |
$40.00 |
$57.40 |
| 11 | 610(A) 0604 |
5" CONCRETE SIDEWALK | 5,437 | SY |
$75.00 |
$76.29 |
$86.00 |
$102.50 |
| 12 | 610(A) 0605 |
6" CONCRETE SIDEWALK | 160 | SY |
$85.00 |
$115.95 |
$100.00 |
$110.50 |
| 13 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 202 | SY |
$85.00 |
$130.48 |
$100.00 |
$116.50 |
| 14 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 604 | SF |
$28.30 |
$42.71 |
$30.00 |
$33.60 |
| 15 | 612(F) 0648 |
METER BOXES ADJUST TO GRADE | 3 | EA |
$900.00 |
$1,292.66 |
$700.00 |
$972.00 |
| 16 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 153 | SY |
$17.00 |
$19.79 |
$16.00 |
$33.10 |
| 17 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 63 | SY |
$15.00 |
$24.03 |
$20.00 |
$35.90 |
| 18 | 622(A) 4445 |
2" PIPE RAILING | 275 | LF |
$127.00 |
$88.79 |
$110.00 |
$125.00 |
| 19 | 803(A) 8065 |
PULL BOX(SIZE I) | 8 | EA |
$641.75 |
$2,035.00 |
$2,100.00 |
$1,998.00 |
| 20 | 804(A) 2915 |
STRUCTURAL CONCRETE | 3 | CY |
$400.00 |
$2,145.00 |
$2,200.00 |
$2,106.00 |
| 21 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 15 | EA |
$72.12 |
$93.50 |
$113.00 |
$91.80 |
| 22 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$198.08 |
$192.50 |
$234.00 |
$189.00 |
| 23 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 56 | SF |
$30.00 |
$35.20 |
$42.00 |
$34.60 |
| 24 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 220 | LF |
$10.51 |
$9.90 |
$12.00 |
$9.70 |
| 25 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,805 | LF |
$0.4100 |
$0.5500 |
$0.7500 |
$0.5400 |
| 26 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 648 | LF |
$10.00 |
$12.10 |
$14.00 |
$11.90 |
| 27 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 2 | EA |
$236.84 |
$220.00 |
$267.00 |
$216.00 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,775.00 |
$7,000.00 |
$5,670.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$7,983.35 |
$8,000.00 |
$15,530.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$4,539.35 |
$2,000.00 |
$3,510.00 |
| 31 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$69,186.00 |
$72,059.81 |
$50,000.00 |
$245,285.55 |
| 32 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$2,500.00 |
$12,949.76 |
$5,000.00 |
$18,145.00 |
| 33 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,025 | LF |
$4.50 |
$2.29 |
$3.00 |
$2.25 |
| 34 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 4 | EA |
$355.00 |
$207.90 |
$250.00 |
$204.00 |
| 35 | 230(A) 2806 |
SOLID SLAB SODDING | 634 | SY |
$3.00 |
$2.29 |
$3.25 |
$2.25 |
| 36 | 610(A) 0604 |
5" CONCRETE SIDEWALK | 3,003 | SY |
$75.00 |
$75.91 |
$86.00 |
$94.50 |
| 37 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 120 | SF |
$28.30 |
$47.99 |
$30.00 |
$43.20 |
| 38 | 622(A) 4445 |
2" PIPE RAILING | 200 | LF |
$127.00 |
$90.94 |
$110.00 |
$123.00 |
| 39 | 803(A) 8065 |
PULL BOX(SIZE I) | 2 | EA |
$641.75 |
$2,145.00 |
$2,100.00 |
$2,106.00 |
| 40 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$72.12 |
$110.00 |
$113.00 |
$91.80 |
| 41 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$198.08 |
$93.50 |
$234.00 |
$189.00 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 16 | SF |
$30.00 |
$35.20 |
$42.00 |
$34.60 |
| 43 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 60 | LF |
$10.51 |
$9.90 |
$12.00 |
$9.70 |
| 44 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 52 | LF |
$10.00 |
$12.10 |
$14.00 |
$11.90 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$1,500.00 |
$1,100.00 |
$1,500.00 |
$1,200.00 |