| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,386 | CY |
$8.00 |
$10.00 |
$9.25 |
$10.00 |
$18.50 |
| 2 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 411 | CY |
$3.50 |
$2.00 |
$4.00 |
$15.00 |
$11.32 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,475 | LF |
$2.30 |
$1.60 |
$2.50 |
$1.80 |
$2.63 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 2,880 | SY |
$2.80 |
$2.50 |
$2.95 |
$2.50 |
$4.16 |
| 5 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 237 | CY |
$72.05 |
$57.00 |
$58.00 |
$75.00 |
$85.76 |
| 6 | 510(A) 6333 |
RETAINING WALL | 100 | SY |
$485.00 |
$410.00 |
$400.00 |
$250.00 |
$362.87 |
| 7 | 602(A) 4154 |
GABIONS | 363 | CY |
$350.00 |
$315.50 |
$320.00 |
$250.00 |
$432.36 |
| 8 | 610(A) 0604 |
5" CONCRETE SIDEWALK | 2,145 | SY |
$55.00 |
$48.00 |
$48.00 |
$55.00 |
$68.25 |
| 9 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 146 | SY |
$69.24 |
$54.00 |
$65.00 |
$65.00 |
$79.69 |
| 10 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 237 | SF |
$36.50 |
$33.25 |
$27.00 |
$25.00 |
$24.66 |
| 11 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 233 | LF |
$20.73 |
$16.00 |
$19.00 |
$20.00 |
$15.23 |
| 12 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 95 | LF |
$10.22 |
$16.00 |
$11.00 |
$10.00 |
$11.60 |
| 13 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 83 | SY |
$12.20 |
$13.00 |
$12.00 |
$10.00 |
$11.60 |
| 14 | 619(B) 4791 |
REMOVAL OF CURB | 165 | LF |
$6.99 |
$8.00 |
$8.00 |
$10.00 |
$6.95 |
| 15 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 23 | SY |
$20.00 |
$8.00 |
$8.00 |
$10.00 |
$17.37 |
| 16 | 619(C) 0924 |
SAWING PAVEMENT | 256 | LF |
$8.75 |
$4.75 |
$3.00 |
$5.00 |
$5.24 |
| 17 | 624 4100 |
(PL) ORNAMENTAL FENCE | 255 | LF |
$7.50 |
$48.00 |
$52.00 |
$36.00 |
$42.85 |
| 18 | 643 0500 |
WIRELESS SOLAR LIGHTING | 38 | EA |
$71.00 |
$163.00 |
$145.00 |
$75.00 |
$287.72 |
| 19 | 802(B) 8338 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 65 | LF |
$8.00 |
$20.35 |
$17.50 |
$60.00 |
$18.37 |
| 20 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.2 | CY |
$725.00 |
$1,700.00 |
$1,475.00 |
$6,000.00 |
$1,530.44 |
| 21 | 804(B) 2916 |
REINFORCING STEEL | 89 | LB |
$2.04 |
$2.40 |
$2.10 |
$30.00 |
$2.14 |
| 22 | 805(D) 8742 |
(PL)REMOVE & RESET TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$8,000.00 |
$1,350.00 |
$1,175.00 |
$9,600.00 |
$1,218.24 |
| 23 | 806(B) 8892 |
8' MTG.HT.TS PED.POLE(G.STL.) | 4 | EA |
$775.00 |
$1,545.00 |
$1,250.00 |
$6,000.00 |
$1,395.77 |
| 24 | 829(A) 8200 |
(PL) PEDESTRIAN / CYCLIST COUNTER | 1 | EA |
$13,450.00 |
$16,943.00 |
$13,800.00 |
$30,000.00 |
$15,304.44 |
| 25 | 834(A) 8207 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 90 | LF |
$5.00 |
$7.00 |
$6.00 |
$12.00 |
$6.12 |
| 26 | 834(B) 8220 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 74 | LF |
$1.79 |
$5.50 |
$5.25 |
$6.00 |
$4.90 |
| 27 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 9.75 | SF |
$27.00 |
$95.00 |
$84.00 |
$50.00 |
$55.10 |
| 28 | 851(B) 3215 |
1 1/2@2.72 GALV.STEEL PIPE POST | 28 | LF |
$7.50 |
$13.50 |
$13.00 |
$24.00 |
$24.49 |
| 29 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 385 | LF |
$0.8000 |
$4.10 |
$4.00 |
$5.00 |
$4.90 |
| 30 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 429 | LF |
$4.50 |
$13.00 |
$11.50 |
$11.00 |
$11.02 |
| 31 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 5 | EA |
$137.45 |
$204.00 |
$180.00 |
$300.00 |
$306.09 |
| 32 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 2 | EA |
$285.03 |
$339.00 |
$295.00 |
$360.00 |
$367.31 |
| 33 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 429 | LF |
$1.28 |
$4.00 |
$3.75 |
$4.00 |
$3.67 |
| 34 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 1 | EA |
$60.95 |
$116.00 |
$100.00 |
$180.00 |
$183.66 |
| 35 | 858(A) 8893 |
PAVEMENT MARKERS CLASS A TYPE 1 | 5 | EA |
$5.50 |
$34.00 |
$28.00 |
$60.00 |
$61.22 |
| 36 | 631(A) 0210 |
(SP)REMOVABLE BOLLARD | 7 | EA |
$1,300.00 |
$1,100.00 |
$2,450.00 |
$1,400.00 |
$1,139.57 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$6,000.00 |
$20,000.00 |
$8,815.35 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$11,591.59 |
$10,465.00 |
$5,800.00 |
$6,000.00 |
$5,387.16 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$3,448.00 |
$6,800.00 |
$2,500.00 |
$4,097.44 |
| 40 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$26,599.50 |
$40,000.00 |
$20,000.00 |
$9,502.59 |