| 1 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 1,500 | CY |
$20.00 |
$11.39 |
$6.50 |
$20.50 |
$1.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$10,000.00 |
$4,580.00 |
$20,000.00 |
$7,725.00 |
$7,130.00 |
| 3 | 407(D) 0401 |
(SP) NT TACK MATERIAL | 15,000 | GAL |
$3.80 |
$2.30 |
$3.00 |
$3.95 |
$4.95 |
| 4 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,600 | TON |
$85.00 |
$75.92 |
$77.00 |
$82.61 |
$84.10 |
| 5 | 411(E) 5990 |
SUPERPAVE, TYPE S6(PG 64-22 OK) | 3,000 | TON |
$85.00 |
$69.66 |
$84.50 |
$79.91 |
$86.50 |
| 6 | 412 5267 |
COLD MILLING PAVEMENT | 8,500 | SY |
$7.00 |
$3.00 |
$3.00 |
$4.75 |
$3.95 |
| 7 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 600 | SY |
$35.00 |
$3.00 |
$10.50 |
$26.00 |
$27.80 |
| 8 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 105,000 | LF |
$0.5000 |
$0.2900 |
$0.3500 |
$0.3000 |
$0.3200 |
| 9 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,500 | LF |
$0.1000 |
$1.30 |
$1.50 |
$1.25 |
$1.35 |
| 10 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$10,520.00 |
$65,000.00 |
$9,875.00 |
$11,060.00 |
| 11 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 90 | SD |
$20.00 |
$30.00 |
$35.00 |
$30.00 |
$33.00 |