Bid tab 250273

Let Jan 15, 2026 · Division 4 · Kingfisher Sign up free

‹ Jan 2026 results

Widen And Resurface

Let date
Thursday, January 15, 2026
Contract
250273 · job page
J/P numbers
31003(04), 31003(07)
District
Division 4
County
Kingfisher
Highway
SH-33
Limits
SH-33: FROM 0.78 MILES EAST OF THE INTERSECTION OF US-81, EXTEND EAST NEAR KINGFISHER.
Classification
Widen And Resurface
Project number
STP-237B(109)PM / STP-237B(108)PM
Working days
475

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Silver Star Construction Company, Inc. Low bidder $30,566,508
2 Haskell Lemon Group, LLC $30,572,685 +0.0%
3 SHERWOOD CONSTRUCTION CO., INC. $30,727,848 +0.5%
4 T.J. CAMPBELL CONSTRUCTION COMPANY $30,966,806 +1.3%
5 THE CUMMINS CONSTRUCTION CO., INC. $32,125,374 +5.1%

Bid tab: unit prices 217 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Silver Star Con…#2 Haskell Lemon G…#3 SHERWOOD CONSTR…#4 T.J. CAMPBELL C…#5 THE CUMMINS CON…
10201(A)1200 CLEARING AND GRUBBING1LSUM $49,800.00 $117,000.00 $50,000.00 $156,864.17 $45,000.00 $37,100.00
20202(A)2200 UNCLASSIFIED EXCAVATION83,943CY $10.00 $9.50 $8.85 $7.89 $8.50 $8.75
30202(D)2500 UNCLASSIFIED BORROW172CY $20.00 $1.00 $7.15 $0.2500 $12.75 $21.20
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $40,000.00 $165,000.00 $100,000.00 $122,111.24 $135,000.00 $37,100.00
50221(B)2300 TEMPORARY SILT FENCE6,058LF $3.50 $3.00 $3.65 $4.90 $3.90 $3.70
60221(E)2600 TEMPORARY SILT DIKE3,528LF $14.00 $11.00 $10.40 $10.35 $11.00 $10.60
70221(F)2710 TEMPORARY ROCK FILTER DAM TYPE 220CY $200.00 $265.00 $500.00 $302.40 $170.00 $196.10
80221(H)2900 (PL)TEMPORARY INLET SEDIMENT FILTER3EA $400.00 $210.00 $312.00 $310.34 $330.00 $371.00
90230(A)7200 SOLID SLAB SODDING8,000SY $3.00 $4.00 $3.40 $3.36 $3.60 $3.45
100233(E)0600 (SP) HYDROMULCH167,227SY $1.50 $1.10 $2.25 $2.22 $2.40 $2.30
110241 3100 MOWING124.26AC $250.00 $250.00 $208.00 $201.34 $215.00 $212.00
120303(A)1200 AGGREGATE BASE TYPE A14,296CY $80.00 $91.00 $51.25 $78.74 $99.00 $74.20
130307(K)4200 STABILIZED SUBGRADE82,890SY $9.00 $7.00 $8.85 $7.36 $5.00 $7.45
140325 0100 SEPARATOR FABRIC82,890SY $2.00 $1.10 $2.55 $1.45 $1.35 $2.15
150402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E11,643TON $50.00 $48.00 $47.30 $45.81 $36.00 $58.30
160407(B)7300 TACK COAT30,968GAL $4.00 $3.00 $2.75 $2.74 $3.50 $4.50
170409(A)9200 FABRIC REINFORCEMENT20,858SY $2.50 $2.00 $0.7500 $0.7800 $2.25 $8.85
180409(B)9300 BITUMINOUS BINDER4,172GAL $4.00 $4.54 $1.25 $1.29 $6.50 $6.75
190411(B)1320 SUPERPAVE, TYPE S3(PG 70-28 OK)8,730TON $120.00 $103.00 $112.50 $109.13 $109.00 $109.00
200411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)40,598TON $105.00 $94.00 $101.50 $103.44 $96.00 $99.60
210411(C)1420 SUPERPAVE, TYPE S4(PG 70-28 OK)6,984TON $130.00 $110.00 $126.50 $125.17 $114.00 $127.10
220411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)6,785TON $120.00 $102.00 $111.50 $115.86 $98.00 $108.00
230412 3100 COLD MILLING PAVEMENT63,237SY $3.50 $2.00 $2.75 $1.63 $2.30 $2.90
240501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED142CY $35.00 $47.00 $31.60 $36.21 $33.00 $42.40
250509(A)0200 CLASS AA CONCRETE527CY $700.00 $621.00 $641.50 $755.56 $850.00 $1,033.00
260509(C)0400 CLASS A CONCRETE, SMALL STRUCTURES1CY $2,000.00 $1,250.00 $1,775.00 $1,314.29 $600.00 $901.00
270511(A)2200 REINFORCING STEEL76,566LB $1.40 $1.35 $1.35 $1.36 $1.20 $1.25
280601(A)1100 TYPE I PLAIN RIPRAP10TON $62.00 $110.00 $144.50 $99.34 $105.00 $132.50
290602(B)2310 REVETMENT MATTRESSES5,987SY $45.00 $60.00 $55.00 $56.19 $56.00 $58.30
300610(B)5310 6" CONCRETE DRIVEWAY269SY $100.00 $82.00 $81.00 $62.42 $91.00 $79.50
310611(G)9004 INLET CDI RCP DES. 23EA $4,900.00 $3,400.00 $3,475.00 $3,228.23 $5,200.00 $4,134.00
320611(L)1600 JUNCTION BOXES16CF $153.00 $155.00 $224.50 $410.13 $425.00 $121.90
330613(A)5208 18" R.C.PIPE CLASS III204LF $100.00 $68.00 $67.70 $93.30 $70.00 $67.85
340613(A)5216 24" R.C.PIPE CLASS III608LF $120.00 $77.00 $96.20 $103.35 $78.00 $82.65
350613(A)5358 28" X 18" R.C.PIPE ARCH CLASS A-III1,037LF $140.00 $109.00 $118.50 $129.23 $120.00 $150.50
360613(A)5366 36" X 22" R.C.PIPE ARCH CLASS A-III113LF $190.00 $135.00 $165.50 $210.80 $175.00 $169.60
370613(A)5370 43" X 26" R.C.PIPE ARCH CLASS A-III110LF $210.00 $196.00 $231.50 $253.78 $250.00 $238.50
380613(B)5508 18" CORR. GALV. STEEL PIPE566LF $60.00 $60.00 $43.70 $37.16 $64.00 $66.80
390613(B)5516 24" CORR. GALV. STEEL PIPE172LF $75.00 $69.00 $54.30 $44.11 $72.00 $68.90
400613(B)5604 21" X 15" CORR. GALV. STEEL PIPE ARCH117LF $72.00 $130.00 $44.10 $38.09 $98.00 $80.55
410613(H)6210 8" PERFORATED PIPE UNDERDRAIN ROUND1,669LF $30.00 $26.00 $26.50 $40.51 $26.00 $20.14
420613(I)6315 8" NON-PERF.PIPE UNDERDRAIN RND.557LF $30.00 $42.00 $26.50 $17.88 $26.00 $33.95
430613(L)6608 21" X 15" PREFAB. CULVERT END SEC., ARCH6EA $600.00 $700.00 $469.00 $347.15 $900.00 $1,484.00
440613(L)6716 24" PREFAB. CULVERT END SEC., ROUND2EA $1,200.00 $670.00 $1,145.00 $1,166.77 $1,300.00 $2,120.00
450613(M)6960 TYPE A4 CULVERT END TREATMENT15EA $2,000.00 $2,300.00 $1,473.00 $2,068.94 $2,200.00 $1,908.00
460613(M)6964 TYPE B4 CULVERT END TREATMENT14EA $2,500.00 $2,600.00 $1,950.00 $2,275.84 $2,300.00 $2,120.00
470613(M)6968 TYPE C4 CULVERT END TREATMENT1EA $3,000.00 $3,100.00 $3,160.00 $2,586.17 $2,350.00 $2,230.00
480613(M)6984 TYPE BB4 CULVERT END TREATMENT1EA $3,600.00 $4,150.00 $3,642.00 $2,896.51 $3,000.00 $2,550.00
490613(M)7004 TYPE A6 CULVERT END TREATMENT15EA $2,700.00 $2,600.00 $2,517.00 $2,379.28 $2,000.00 $2,550.00
500613(M)7008 TYPE B6 CULVERT END TREATMENT15EA $3,000.00 $3,315.00 $3,005.00 $2,586.17 $2,200.00 $2,650.00
510613(M)7012 TYPE C6 CULVERT END TREATMENT1EA $4,000.00 $4,600.00 $4,285.00 $2,896.51 $3,600.00 $2,755.00
520613(M)7028 TYPE BB6 CULVERT END TREATMENT1EA $4,800.00 $5,200.00 $4,124.00 $3,103.41 $4,600.00 $3,395.00
530619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $32,232.00 $225,500.00 $39,905.00 $30,939.16 $45,000.00 $31,800.00
540619(B)6300 REMOVAL OF HEADWALL19EA $1,350.00 $2,100.00 $1,585.00 $1,208.01 $1,000.00 $530.00
550619(B)6364 REMOVAL OF ASPHALT PAVEMENT1,100SY $8.85 $7.00 $29.50 $10.17 $4.00 $11.65
560619(C)6600 SAWING PAVEMENT46,971LF $3.50 $1.60 $1.15 $1.20 $2.15 $3.20
570624(C)3400 FENCE-STYLE SWF (4 BARBED WIRE)1,497LF $10.00 $7.00 $4.20 $6.98 $8.00 $7.15
580624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)20,156LF $10.50 $7.00 $8.35 $6.98 $9.00 $7.25
590629(A)7200 MAILBOX INSTALLATION-SINGLE6EA $215.00 $130.00 $234.00 $129.31 $250.00 $133.00
600629(C)7400 REMOVAL OF MAILBOX INSTALLATION6EA $120.00 $268.00 $130.00 $129.31 $135.00 $133.00
610629(E)7600 MAILBOX6EA $125.00 $210.00 $52.00 $206.90 $53.00 $212.00
620648(C)6450 GAS LINE RELOCATION1LSUM $354,285.00 $195,000.00 $175,000.00 $168,018.47 $630,000.00 $344,500.00
630202(A)2210 UNCLASSIFIED EXCAVATION559.3CY $11.00 $17.00 $8.85 $15.71 $25.00 $13.25
640501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED70.4CY $40.00 $47.00 $28.90 $31.04 $33.00 $42.40
650509(A)0210 CLASS AA CONCRETE151.7CY $700.00 $600.00 $641.50 $698.61 $805.00 $780.00
660511(A)2210 REINFORCING STEEL25,430LB $1.50 $1.35 $1.35 $1.36 $1.25 $1.25
670619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $8,000.00 $12,500.00 $21,425.00 $6,206.81 $12,000.00 $15,900.00
680202(A)2210 UNCLASSIFIED EXCAVATION583.2CY $11.00 $16.00 $8.85 $15.07 $12.00 $13.25
690501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED113.8CY $40.00 $47.00 $28.90 $31.04 $41.00 $42.40
700509(A)0210 CLASS AA CONCRETE335CY $700.00 $600.00 $641.50 $619.31 $840.00 $642.50
710511(A)2210 REINFORCING STEEL45,650LB $1.50 $1.35 $1.35 $1.36 $1.25 $1.25
720619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $8,000.00 $12,500.00 $32,135.00 $6,206.81 $14,000.00 $15,900.00
730823 6100 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM135SD $180.00 $165.00 $133.00 $129.31 $145.00 $133.00
740857(A)9205 CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE)47,000LF $0.3000 $0.1500 $0.2800 $0.1100 $0.1200 $0.1500
750858(A)0228 PAVE.MARKERS CLASS A TYPE 2-D1,175EA $4.75 $3.15 $6.50 $3.10 $3.25 $3.15
760871(B)2300 CONST.ZONE IMPACT ATTEN.135SD $18.75 $20.00 $46.80 $10.35 $11.00 $10.60
770876(A)3210 (PL)TRUCK MOUNTED ATTENUATOR265SD $25.40 $10.00 $130.00 $5.17 $5.25 $5.30
780877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER400LF $21.00 $69.00 $59.30 $31.04 $32.00 $31.80
790877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER7,600LF $5.00 $6.00 $0.4200 $2.07 $2.10 $2.15
800880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF2,650SD $0.5000 $3.00 $0.2100 $2.07 $2.15 $2.15
810880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,375SD $1.00 $3.00 $0.0600 $1.55 $1.55 $1.60
820880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF5,035SD $1.40 $3.00 $0.0600 $2.07 $2.10 $2.15
830880(C)6410 CONSTRUCTION BARRICADES(TYPE III)2,650SD $0.8500 $3.50 $0.0300 $2.33 $2.30 $2.40
840880(D)6500 VERTICAL PANELS1,325SD $0.4000 $2.00 $0.2100 $0.1600 $0.1600 $0.2000
850880(E)6607 WARNING LIGHTS(TYPE B)14,310SD $0.4500 $0.5000 $0.0300 $0.2600 $0.2600 $0.3000
860880(E)6616 WARNING LIGHTS(TYPE D)2,650SD $0.2500 $2.00 $0.0300 $1.03 $1.05 $1.05
870880(F)6700 DRUMS2,650SD $0.3500 $2.00 $0.0300 $1.03 $1.05 $1.05
880880(G)6805 CHANNELIZER CONES29,415SD $0.2500 $1.00 $0.9900 $0.5200 $0.5500 $0.5500
890880(I)7000 FLAGGER135SD $140.00 $600.00 $675.00 $241.80 $700.00 $106.00
900880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)90HOUR $77.00 $77.00 $77.00 $77.00 $77.00 $77.00
910882(A)8210 PORT.CHANGEABLE MESSAGE SIGN558SD $16.95 $10.00 $10.40 $5.17 $5.25 $5.30
920413(A)4210 RUMBLE STRIP-CENTERLINE HMA-CON22,593LF $0.4000 $0.4500 $0.4500 $0.5300 $0.3500 $0.3500
930413(B)4310 RUMBLE STRIP-METHOD HMA-CYC45,290LF $0.3000 $0.3000 $0.3000 $0.5100 $0.2500 $0.2500
940805(A)3252 (PL)REMOVAL OF EXISTING SIGNS34EA $150.00 $55.00 $182.00 $51.73 $55.00 $53.00
950805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS2EA $400.00 $300.00 $208.00 $387.93 $400.00 $397.50
960850(A)1200 SHEET ALUMINUM SIGNS957SF $45.00 $26.00 $49.90 $25.86 $27.00 $26.50
970851(C)2430 2 1/2" SQUARE TUBE POST1,323LF $7.00 $11.00 $7.30 $10.35 $10.50 $10.60
980856(A)8207 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE)71,445LF $0.6000 $0.6500 $0.7500 $0.6300 $0.6500 $0.9500
990856(A)8215 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE)1,000LF $2.00 $1.10 $1.05 $1.03 $1.05 $1.05
1,000856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)302LF $8.00 $16.00 $11.00 $15.52 $16.00 $15.90
1,010856(B)8307 (SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS)12EA $250.00 $150.00 $365.00 $129.31 $130.00 $133.00
1,020201(A)1200 CLEARING AND GRUBBING1LSUM $49,800.00 $123,500.00 $50,000.00 $144,152.20 $55,000.00 $42,400.00
1,030202(A)2200 UNCLASSIFIED EXCAVATION113,810CY $10.00 $9.50 $8.85 $7.41 $7.50 $7.80
1,040202(D)2500 UNCLASSIFIED BORROW360CY $20.00 $1.00 $7.15 $0.3600 $12.75 $21.20
1,050205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $40,000.00 $175,000.00 $100,000.00 $120,379.90 $130,000.00 $37,100.00
1,060221(B)2300 TEMPORARY SILT FENCE5,330LF $3.50 $3.00 $3.65 $4.91 $3.75 $3.75
1,070221(E)2600 TEMPORARY SILT DIKE4,578LF $14.00 $11.00 $10.40 $10.35 $11.00 $10.60
1,080221(F)2710 TEMPORARY ROCK FILTER DAM TYPE 260CY $200.00 $230.00 $500.00 $301.65 $170.00 $196.10
1,090221(H)2900 (PL)TEMPORARY INLET SEDIMENT FILTER8EA $400.00 $210.00 $312.00 $310.34 $320.00 $371.00
1,100230(A)7200 SOLID SLAB SODDING8,000SY $3.00 $4.00 $3.40 $3.36 $3.50 $3.45
1,110233(E)0600 (SP) HYDROMULCH186,448.1SY $1.50 $1.10 $2.25 $2.22 $2.30 $2.30
1,120241 3100 MOWING136.6AC $250.00 $250.00 $208.00 $201.34 $210.00 $212.00
1,130303(A)1200 AGGREGATE BASE TYPE A15,121CY $80.00 $91.00 $51.25 $78.74 $100.00 $74.20
1,140307(K)4200 STABILIZED SUBGRADE85,988SY $9.00 $7.00 $8.85 $7.36 $5.00 $7.45
1,150325 0100 SEPARATOR FABRIC85,988SY $2.00 $1.10 $2.55 $1.45 $1.35 $2.15
1,160402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E12,387TON $50.00 $46.00 $47.30 $45.81 $36.00 $58.30
1,170407(B)7300 TACK COAT32,648GAL $4.00 $3.00 $2.75 $2.74 $3.50 $4.55
1,180409(A)9200 FABRIC REINFORCEMENT22,223SY $2.50 $1.50 $0.7500 $0.7800 $2.25 $8.60
1,190409(B)9300 BITUMINOUS BINDER4,445GAL $4.00 $4.10 $1.25 $1.29 $6.50 $6.50
1,200411(B)1320 SUPERPAVE, TYPE S3(PG 70-28 OK)9,300TON $120.00 $99.00 $112.50 $109.13 $113.00 $108.95
1,210411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)42,573TON $105.00 $94.00 $101.50 $103.44 $97.25 $99.65
1,220411(C)1420 SUPERPAVE, TYPE S4(PG 70-28 OK)7,440TON $130.00 $110.00 $126.50 $125.17 $117.00 $127.05
1,230411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)7,027TON $120.00 $99.00 $115.00 $115.86 $102.00 $108.20
1,240412 3100 COLD MILLING PAVEMENT67,309SY $3.50 $2.00 $2.75 $1.63 $2.30 $2.70
1,250501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED128CY $35.00 $47.00 $31.60 $36.21 $28.00 $42.40
1,260509(A)0200 CLASS AA CONCRETE721CY $700.00 $621.00 $641.50 $736.56 $875.00 $1,035.00
1,270509(C)0400 CLASS A CONCRETE, SMALL STRUCTURES6CY $2,000.00 $910.00 $1,775.00 $1,218.44 $500.00 $901.00
1,280511(A)2200 REINFORCING STEEL98,740LB $1.40 $1.35 $1.35 $1.36 $1.20 $1.25
1,290601(A)1100 TYPE I PLAIN RIPRAP10TON $62.00 $114.00 $144.50 $99.34 $150.00 $132.50
1,300602(B)2310 REVETMENT MATTRESSES3,684SY $45.00 $60.00 $55.00 $56.19 $56.00 $58.30
1,310610(B)5310 6" CONCRETE DRIVEWAY948SY $100.00 $75.00 $81.00 $62.42 $88.00 $84.80
1,320611(G)9000 INLET CDI RCP DES. 12EA $4,400.00 $3,365.00 $3,375.00 $3,005.30 $5,000.00 $3,286.00
1,330611(G)9004 INLET CDI RCP DES. 26EA $4,900.00 $3,315.00 $3,475.00 $3,228.23 $5,200.00 $4,240.00
1,340611(L)1600 JUNCTION BOXES127CF $153.00 $117.00 $224.50 $203.44 $104.00 $122.00
1,350613(A)5208 18" R.C.PIPE CLASS III728LF $100.00 $68.00 $67.70 $93.30 $70.00 $67.85
1,360613(A)5216 24" R.C.PIPE CLASS III638LF $120.00 $77.00 $110.50 $103.35 $77.00 $82.70
1,370613(A)5224 36" R.C.PIPE CLASS III92LF $200.00 $130.00 $150.50 $188.33 $120.00 $170.00
1,380613(A)5350 22" X 13" R.C.PIPE ARCH CLASS A-III54LF $135.00 $82.00 $87.30 $108.62 $112.00 $159.00
1,390613(A)5358 28" X 18" R.C.PIPE ARCH CLASS A-III796LF $140.00 $111.00 $118.50 $129.23 $123.00 $117.00
1,400613(A)5366 36" X 22" R.C.PIPE ARCH CLASS A-III63LF $190.00 $139.00 $168.50 $210.80 $180.00 $169.60
1,410613(B)5508 18" CORR. GALV. STEEL PIPE776LF $60.00 $59.00 $43.70 $37.16 $65.00 $68.90
1,420613(B)5516 24" CORR. GALV. STEEL PIPE452LF $75.00 $69.00 $54.20 $44.11 $80.00 $74.20
1,430613(B)5532 42" CORR. GALV. STEEL PIPE82LF $125.00 $95.00 $82.10 $76.27 $95.00 $143.10
1,440613(B)5604 21" X 15" CORR. GALV. STEEL PIPE ARCH70LF $72.00 $73.00 $44.20 $38.09 $100.00 $80.55
1,450613(H)6210 8" PERFORATED PIPE UNDERDRAIN ROUND1,776LF $30.00 $23.00 $26.50 $40.51 $30.00 $20.15
1,460613(I)6315 8" NON-PERF.PIPE UNDERDRAIN RND.592LF $30.00 $30.00 $26.50 $17.88 $42.00 $30.75
1,470613(L)6608 21" X 15" PREFAB. CULVERT END SEC., ARCH4EA $600.00 $700.00 $475.00 $347.15 $883.93 $1,272.00
1,480613(L)6716 24" PREFAB. CULVERT END SEC., ROUND2EA $1,200.00 $1,600.00 $1,145.00 $1,166.77 $1,300.00 $1,590.00
1,490613(L)6728 36" PREFAB. CULVERT END SEC., ROUND4EA $2,000.00 $2,100.00 $2,265.00 $2,388.87 $2,300.00 $2,120.00
1,500613(M)6960 TYPE A4 CULVERT END TREATMENT19EA $2,000.00 $2,300.00 $1,475.00 $2,068.94 $2,300.00 $1,908.00
1,510613(M)6964 TYPE B4 CULVERT END TREATMENT16EA $2,500.00 $2,600.00 $1,950.00 $2,275.84 $2,400.00 $2,015.00
1,520613(M)6972 TYPE D4 CULVERT END TREATMENT1EA $3,500.00 $3,650.00 $3,910.00 $3,103.41 $2,600.00 $2,120.00
1,530613(M)6980 TYPE AA4 CULVERT END TREATMENT2EA $3,300.00 $3,100.00 $3,160.00 $2,689.62 $3,600.00 $2,225.00
1,540613(M)7004 TYPE A6 CULVERT END TREATMENT20EA $2,700.00 $2,600.00 $2,525.00 $2,379.28 $2,400.00 $2,335.00
1,550613(M)7008 TYPE B6 CULVERT END TREATMENT18EA $3,000.00 $3,315.00 $3,005.00 $2,586.17 $2,600.00 $2,440.00
1,560613(M)7016 TYPE D6 CULVERT END TREATMENT1EA $4,000.00 $4,000.00 $5,670.00 $3,413.74 $3,400.00 $2,545.00
1,570613(M)7024 TYPE AA6 CULVERT END TREATMENT2EA $3,600.00 $4,400.00 $4,660.00 $2,896.51 $3,700.00 $2,968.00
1,580619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $32,232.00 $232,000.00 $40,955.00 $30,939.16 $33,000.00 $37,100.00
1,590619(B)6300 REMOVAL OF HEADWALL19EA $1,350.00 $2,100.00 $1,585.00 $1,208.01 $1,000.00 $530.00
1,600619(B)6364 REMOVAL OF ASPHALT PAVEMENT500SY $8.85 $7.00 $36.50 $10.17 $12.00 $15.90
1,610619(B)6396 REMOVAL OF GUARDRAIL1,523LF $9.00 $5.00 $5.15 $4.21 $2.15 $2.15
1,620619(C)6600 SAWING PAVEMENT50,040LF $3.50 $1.60 $1.05 $1.20 $2.35 $3.20
1,630624(C)3400 FENCE-STYLE SWF (4 BARBED WIRE)4,679LF $10.00 $7.00 $4.20 $6.88 $8.00 $7.05
1,640624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)9,912LF $10.50 $7.00 $8.35 $6.98 $9.00 $7.20
1,650624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)573LF $12.00 $7.50 $10.50 $7.14 $10.00 $7.30
1,660629(A)7200 MAILBOX INSTALLATION-SINGLE8EA $215.00 $130.00 $234.00 $129.31 $130.00 $133.00
1,670629(B)7300 MAILBOX INSTALLATION-MULTIPLE1EA $350.00 $210.00 $312.00 $206.90 $210.00 $212.00
1,680629(C)7400 REMOVAL OF MAILBOX INSTALLATION9EA $120.00 $52.00 $130.00 $51.73 $55.00 $53.00
1,690629(E)7600 MAILBOX10EA $75.00 $210.00 $52.00 $206.90 $210.00 $212.00
1,700648(C)6450 GAS LINE RELOCATION1LSUM $354,285.00 $640,000.00 $632,500.00 $616,944.97 $185,000.00 $487,600.00
1,710202(A)2210 UNCLASSIFIED EXCAVATION2,558CY $11.00 $15.00 $8.65 $15.46 $14.00 $13.25
1,720501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED203.2CY $40.00 $47.00 $31.60 $31.04 $35.00 $42.40
1,730509(A)0210 CLASS AA CONCRETE641.4CY $700.00 $600.00 $641.50 $576.43 $775.00 $589.00
1,740511(A)2210 REINFORCING STEEL116,060LB $1.50 $1.35 $1.35 $1.36 $1.20 $1.25
1,750619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $12,500.00 $37,500.00 $6,206.81 $10,000.00 $15,900.00
1,760202(A)2210 UNCLASSIFIED EXCAVATION565CY $11.00 $16.00 $8.65 $15.55 $12.00 $13.25
1,770501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED281.8CY $40.00 $47.00 $31.60 $31.04 $28.00 $42.40
1,780509(A)0210 CLASS AA CONCRETE319.8CY $700.00 $600.00 $63.20 $594.76 $825.00 $648.20
1,790511(A)2210 REINFORCING STEEL55,320LB $1.50 $1.35 $1.35 $1.36 $1.20 $1.25
1,800619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $12,500.00 $26,825.00 $6,206.81 $10,000.00 $15,900.00
1,810202(A)2210 UNCLASSIFIED EXCAVATION4,915CY $11.00 $15.00 $8.65 $10.73 $14.00 $13.25
1,820501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED465.6CY $40.00 $47.00 $30.50 $25.86 $35.00 $42.40
1,830509(A)0210 CLASS AA CONCRETE686.1CY $700.00 $600.00 $641.50 $571.29 $805.00 $585.10
1,840511(A)2210 REINFORCING STEEL128,990LB $1.50 $1.35 $1.35 $1.36 $1.20 $1.25
1,850619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $12,500.00 $42,845.00 $6,206.81 $10,000.00 $15,900.00
1,860823 6100 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM135SD $180.00 $165.00 $133.00 $129.31 $145.00 $133.00
1,870857(A)9205 CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE)50,000LF $0.5000 $0.1500 $0.2800 $0.1100 $0.1200 $0.1500
1,880858(A)0228 PAVE.MARKERS CLASS A TYPE 2-D1,250EA $8.00 $3.15 $6.50 $3.10 $3.25 $3.15
1,890871(B)2300 CONST.ZONE IMPACT ATTEN.135SD $17.00 $20.00 $46.80 $10.35 $10.50 $10.60
1,900876(A)3210 (PL)TRUCK MOUNTED ATTENUATOR265SD $25.40 $10.00 $130.00 $5.17 $5.25 $5.30
1,910877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER400LF $30.00 $69.00 $59.30 $31.04 $32.00 $31.80
1,920877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER9,200LF $5.00 $6.00 $0.4200 $2.07 $2.05 $2.15
1,930880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF2,650SD $0.4000 $3.00 $0.2100 $2.07 $2.05 $2.15
1,940880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,375SD $1.00 $3.00 $0.0600 $1.55 $1.60 $1.60
1,950880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF5,035SD $1.40 $3.00 $0.0600 $2.07 $2.10 $2.15
1,960880(C)6410 CONSTRUCTION BARRICADES(TYPE III)2,650SD $0.8500 $3.00 $0.0300 $2.33 $2.35 $2.40
1,970880(D)6500 VERTICAL PANELS1,325SD $0.4000 $1.00 $0.2100 $0.1600 $0.1600 $0.1500
1,980880(E)6607 WARNING LIGHTS(TYPE B)14,310SD $0.4500 $1.00 $0.0300 $0.2600 $0.2600 $0.3000
1,990880(E)6616 WARNING LIGHTS(TYPE D)2,650SD $0.2500 $2.00 $0.0300 $1.03 $1.05 $1.05
2,000880(F)6700 DRUMS2,650SD $0.3000 $2.00 $0.0300 $1.03 $1.05 $1.05
2,010880(G)6805 CHANNELIZER CONES29,415SD $0.5000 $1.00 $0.9900 $0.5200 $0.5500 $0.5500
2,020880(I)7000 FLAGGER135SD $140.00 $600.00 $675.00 $241.80 $700.00 $106.00
2,030880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)90HOUR $77.00 $77.00 $77.00 $77.00 $77.00 $77.00
2,040882(A)8210 PORT.CHANGEABLE MESSAGE SIGN558SD $15.00 $10.00 $10.40 $5.17 $5.25 $5.30
2,050413(A)4210 RUMBLE STRIP-CENTERLINE HMA-CON27,747LF $0.4000 $0.4500 $0.4500 $0.5100 $0.3200 $0.3500
2,060413(B)4310 RUMBLE STRIP-METHOD HMA-CYC40,242LF $0.5000 $0.3000 $0.3000 $0.5300 $0.2500 $0.2500
2,070805(A)3252 (PL)REMOVAL OF EXISTING SIGNS28EA $150.00 $55.00 $182.00 $51.73 $54.00 $53.00
2,080805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS3EA $400.00 $400.00 $364.00 $387.93 $400.00 $397.50
2,090850(A)1200 SHEET ALUMINUM SIGNS595SF $45.00 $26.00 $48.90 $25.86 $27.00 $26.50
2,100851(C)2430 2 1/2" SQUARE TUBE POST825LF $7.00 $11.00 $7.30 $10.35 $11.00 $10.60
2,110856(A)8207 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE)69,175LF $0.6000 $0.6500 $0.7500 $0.6300 $0.6500 $0.6500
2,120856(A)8215 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE)1,315LF $2.00 $1.10 $1.05 $1.03 $1.05 $1.10
2,130856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)302LF $8.00 $16.00 $11.00 $15.52 $16.00 $15.90
2,140856(B)8307 (SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS)12EA $250.00 $150.00 $365.00 $129.31 $130.00 $133.00
2,150642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $563,000.00 $208,000.00 $150,000.00 $128,824.16 $252,000.00 $417,640.00
2,160220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $38,000.00 $35,000.00 $30,000.00 $5,172.35 $55,000.00 $31,800.00
2,170641 2110 MOBILIZATION1LSUM $1,462,000.00