| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$49,800.00 |
$117,000.00 |
$50,000.00 |
$156,864.17 |
$45,000.00 |
$37,100.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 83,943 | CY |
$10.00 |
$9.50 |
$8.85 |
$7.89 |
$8.50 |
$8.75 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 172 | CY |
$20.00 |
$1.00 |
$7.15 |
$0.2500 |
$12.75 |
$21.20 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$165,000.00 |
$100,000.00 |
$122,111.24 |
$135,000.00 |
$37,100.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 6,058 | LF |
$3.50 |
$3.00 |
$3.65 |
$4.90 |
$3.90 |
$3.70 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 3,528 | LF |
$14.00 |
$11.00 |
$10.40 |
$10.35 |
$11.00 |
$10.60 |
| 70 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 20 | CY |
$200.00 |
$265.00 |
$500.00 |
$302.40 |
$170.00 |
$196.10 |
| 80 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 3 | EA |
$400.00 |
$210.00 |
$312.00 |
$310.34 |
$330.00 |
$371.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 8,000 | SY |
$3.00 |
$4.00 |
$3.40 |
$3.36 |
$3.60 |
$3.45 |
| 100 | 233(E)0600 |
(SP) HYDROMULCH | 167,227 | SY |
$1.50 |
$1.10 |
$2.25 |
$2.22 |
$2.40 |
$2.30 |
| 110 | 241 3100 |
MOWING | 124.26 | AC |
$250.00 |
$250.00 |
$208.00 |
$201.34 |
$215.00 |
$212.00 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 14,296 | CY |
$80.00 |
$91.00 |
$51.25 |
$78.74 |
$99.00 |
$74.20 |
| 130 | 307(K)4200 |
STABILIZED SUBGRADE | 82,890 | SY |
$9.00 |
$7.00 |
$8.85 |
$7.36 |
$5.00 |
$7.45 |
| 140 | 325 0100 |
SEPARATOR FABRIC | 82,890 | SY |
$2.00 |
$1.10 |
$2.55 |
$1.45 |
$1.35 |
$2.15 |
| 150 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 11,643 | TON |
$50.00 |
$48.00 |
$47.30 |
$45.81 |
$36.00 |
$58.30 |
| 160 | 407(B)7300 |
TACK COAT | 30,968 | GAL |
$4.00 |
$3.00 |
$2.75 |
$2.74 |
$3.50 |
$4.50 |
| 170 | 409(A)9200 |
FABRIC REINFORCEMENT | 20,858 | SY |
$2.50 |
$2.00 |
$0.7500 |
$0.7800 |
$2.25 |
$8.85 |
| 180 | 409(B)9300 |
BITUMINOUS BINDER | 4,172 | GAL |
$4.00 |
$4.54 |
$1.25 |
$1.29 |
$6.50 |
$6.75 |
| 190 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 8,730 | TON |
$120.00 |
$103.00 |
$112.50 |
$109.13 |
$109.00 |
$109.00 |
| 200 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 40,598 | TON |
$105.00 |
$94.00 |
$101.50 |
$103.44 |
$96.00 |
$99.60 |
| 210 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 6,984 | TON |
$130.00 |
$110.00 |
$126.50 |
$125.17 |
$114.00 |
$127.10 |
| 220 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,785 | TON |
$120.00 |
$102.00 |
$111.50 |
$115.86 |
$98.00 |
$108.00 |
| 230 | 412 3100 |
COLD MILLING PAVEMENT | 63,237 | SY |
$3.50 |
$2.00 |
$2.75 |
$1.63 |
$2.30 |
$2.90 |
| 240 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 142 | CY |
$35.00 |
$47.00 |
$31.60 |
$36.21 |
$33.00 |
$42.40 |
| 250 | 509(A)0200 |
CLASS AA CONCRETE | 527 | CY |
$700.00 |
$621.00 |
$641.50 |
$755.56 |
$850.00 |
$1,033.00 |
| 260 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 1 | CY |
$2,000.00 |
$1,250.00 |
$1,775.00 |
$1,314.29 |
$600.00 |
$901.00 |
| 270 | 511(A)2200 |
REINFORCING STEEL | 76,566 | LB |
$1.40 |
$1.35 |
$1.35 |
$1.36 |
$1.20 |
$1.25 |
| 280 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 10 | TON |
$62.00 |
$110.00 |
$144.50 |
$99.34 |
$105.00 |
$132.50 |
| 290 | 602(B)2310 |
REVETMENT MATTRESSES | 5,987 | SY |
$45.00 |
$60.00 |
$55.00 |
$56.19 |
$56.00 |
$58.30 |
| 300 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 269 | SY |
$100.00 |
$82.00 |
$81.00 |
$62.42 |
$91.00 |
$79.50 |
| 310 | 611(G)9004 |
INLET CDI RCP DES. 2 | 3 | EA |
$4,900.00 |
$3,400.00 |
$3,475.00 |
$3,228.23 |
$5,200.00 |
$4,134.00 |
| 320 | 611(L)1600 |
JUNCTION BOXES | 16 | CF |
$153.00 |
$155.00 |
$224.50 |
$410.13 |
$425.00 |
$121.90 |
| 330 | 613(A)5208 |
18" R.C.PIPE CLASS III | 204 | LF |
$100.00 |
$68.00 |
$67.70 |
$93.30 |
$70.00 |
$67.85 |
| 340 | 613(A)5216 |
24" R.C.PIPE CLASS III | 608 | LF |
$120.00 |
$77.00 |
$96.20 |
$103.35 |
$78.00 |
$82.65 |
| 350 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 1,037 | LF |
$140.00 |
$109.00 |
$118.50 |
$129.23 |
$120.00 |
$150.50 |
| 360 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 113 | LF |
$190.00 |
$135.00 |
$165.50 |
$210.80 |
$175.00 |
$169.60 |
| 370 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 110 | LF |
$210.00 |
$196.00 |
$231.50 |
$253.78 |
$250.00 |
$238.50 |
| 380 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 566 | LF |
$60.00 |
$60.00 |
$43.70 |
$37.16 |
$64.00 |
$66.80 |
| 390 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 172 | LF |
$75.00 |
$69.00 |
$54.30 |
$44.11 |
$72.00 |
$68.90 |
| 400 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 117 | LF |
$72.00 |
$130.00 |
$44.10 |
$38.09 |
$98.00 |
$80.55 |
| 410 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,669 | LF |
$30.00 |
$26.00 |
$26.50 |
$40.51 |
$26.00 |
$20.14 |
| 420 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 557 | LF |
$30.00 |
$42.00 |
$26.50 |
$17.88 |
$26.00 |
$33.95 |
| 430 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 6 | EA |
$600.00 |
$700.00 |
$469.00 |
$347.15 |
$900.00 |
$1,484.00 |
| 440 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,200.00 |
$670.00 |
$1,145.00 |
$1,166.77 |
$1,300.00 |
$2,120.00 |
| 450 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 15 | EA |
$2,000.00 |
$2,300.00 |
$1,473.00 |
$2,068.94 |
$2,200.00 |
$1,908.00 |
| 460 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 14 | EA |
$2,500.00 |
$2,600.00 |
$1,950.00 |
$2,275.84 |
$2,300.00 |
$2,120.00 |
| 470 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$3,000.00 |
$3,100.00 |
$3,160.00 |
$2,586.17 |
$2,350.00 |
$2,230.00 |
| 480 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 1 | EA |
$3,600.00 |
$4,150.00 |
$3,642.00 |
$2,896.51 |
$3,000.00 |
$2,550.00 |
| 490 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 15 | EA |
$2,700.00 |
$2,600.00 |
$2,517.00 |
$2,379.28 |
$2,000.00 |
$2,550.00 |
| 500 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 15 | EA |
$3,000.00 |
$3,315.00 |
$3,005.00 |
$2,586.17 |
$2,200.00 |
$2,650.00 |
| 510 | 613(M)7012 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$4,000.00 |
$4,600.00 |
$4,285.00 |
$2,896.51 |
$3,600.00 |
$2,755.00 |
| 520 | 613(M)7028 |
TYPE BB6 CULVERT END TREATMENT | 1 | EA |
$4,800.00 |
$5,200.00 |
$4,124.00 |
$3,103.41 |
$4,600.00 |
$3,395.00 |
| 530 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$32,232.00 |
$225,500.00 |
$39,905.00 |
$30,939.16 |
$45,000.00 |
$31,800.00 |
| 540 | 619(B)6300 |
REMOVAL OF HEADWALL | 19 | EA |
$1,350.00 |
$2,100.00 |
$1,585.00 |
$1,208.01 |
$1,000.00 |
$530.00 |
| 550 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,100 | SY |
$8.85 |
$7.00 |
$29.50 |
$10.17 |
$4.00 |
$11.65 |
| 560 | 619(C)6600 |
SAWING PAVEMENT | 46,971 | LF |
$3.50 |
$1.60 |
$1.15 |
$1.20 |
$2.15 |
$3.20 |
| 570 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,497 | LF |
$10.00 |
$7.00 |
$4.20 |
$6.98 |
$8.00 |
$7.15 |
| 580 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 20,156 | LF |
$10.50 |
$7.00 |
$8.35 |
$6.98 |
$9.00 |
$7.25 |
| 590 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 6 | EA |
$215.00 |
$130.00 |
$234.00 |
$129.31 |
$250.00 |
$133.00 |
| 600 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 6 | EA |
$120.00 |
$268.00 |
$130.00 |
$129.31 |
$135.00 |
$133.00 |
| 610 | 629(E)7600 |
MAILBOX | 6 | EA |
$125.00 |
$210.00 |
$52.00 |
$206.90 |
$53.00 |
$212.00 |
| 620 | 648(C)6450 |
GAS LINE RELOCATION | 1 | LSUM |
$354,285.00 |
$195,000.00 |
$175,000.00 |
$168,018.47 |
$630,000.00 |
$344,500.00 |
| 630 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 559.3 | CY |
$11.00 |
$17.00 |
$8.85 |
$15.71 |
$25.00 |
$13.25 |
| 640 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 70.4 | CY |
$40.00 |
$47.00 |
$28.90 |
$31.04 |
$33.00 |
$42.40 |
| 650 | 509(A)0210 |
CLASS AA CONCRETE | 151.7 | CY |
$700.00 |
$600.00 |
$641.50 |
$698.61 |
$805.00 |
$780.00 |
| 660 | 511(A)2210 |
REINFORCING STEEL | 25,430 | LB |
$1.50 |
$1.35 |
$1.35 |
$1.36 |
$1.25 |
$1.25 |
| 670 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$8,000.00 |
$12,500.00 |
$21,425.00 |
$6,206.81 |
$12,000.00 |
$15,900.00 |
| 680 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 583.2 | CY |
$11.00 |
$16.00 |
$8.85 |
$15.07 |
$12.00 |
$13.25 |
| 690 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 113.8 | CY |
$40.00 |
$47.00 |
$28.90 |
$31.04 |
$41.00 |
$42.40 |
| 700 | 509(A)0210 |
CLASS AA CONCRETE | 335 | CY |
$700.00 |
$600.00 |
$641.50 |
$619.31 |
$840.00 |
$642.50 |
| 710 | 511(A)2210 |
REINFORCING STEEL | 45,650 | LB |
$1.50 |
$1.35 |
$1.35 |
$1.36 |
$1.25 |
$1.25 |
| 720 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$8,000.00 |
$12,500.00 |
$32,135.00 |
$6,206.81 |
$14,000.00 |
$15,900.00 |
| 730 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 135 | SD |
$180.00 |
$165.00 |
$133.00 |
$129.31 |
$145.00 |
$133.00 |
| 740 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 47,000 | LF |
$0.3000 |
$0.1500 |
$0.2800 |
$0.1100 |
$0.1200 |
$0.1500 |
| 750 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 1,175 | EA |
$4.75 |
$3.15 |
$6.50 |
$3.10 |
$3.25 |
$3.15 |
| 760 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 135 | SD |
$18.75 |
$20.00 |
$46.80 |
$10.35 |
$11.00 |
$10.60 |
| 770 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 265 | SD |
$25.40 |
$10.00 |
$130.00 |
$5.17 |
$5.25 |
$5.30 |
| 780 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 400 | LF |
$21.00 |
$69.00 |
$59.30 |
$31.04 |
$32.00 |
$31.80 |
| 790 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 7,600 | LF |
$5.00 |
$6.00 |
$0.4200 |
$2.07 |
$2.10 |
$2.15 |
| 800 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,650 | SD |
$0.5000 |
$3.00 |
$0.2100 |
$2.07 |
$2.15 |
$2.15 |
| 810 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,375 | SD |
$1.00 |
$3.00 |
$0.0600 |
$1.55 |
$1.55 |
$1.60 |
| 820 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,035 | SD |
$1.40 |
$3.00 |
$0.0600 |
$2.07 |
$2.10 |
$2.15 |
| 830 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,650 | SD |
$0.8500 |
$3.50 |
$0.0300 |
$2.33 |
$2.30 |
$2.40 |
| 840 | 880(D)6500 |
VERTICAL PANELS | 1,325 | SD |
$0.4000 |
$2.00 |
$0.2100 |
$0.1600 |
$0.1600 |
$0.2000 |
| 850 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 14,310 | SD |
$0.4500 |
$0.5000 |
$0.0300 |
$0.2600 |
$0.2600 |
$0.3000 |
| 860 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 2,650 | SD |
$0.2500 |
$2.00 |
$0.0300 |
$1.03 |
$1.05 |
$1.05 |
| 870 | 880(F)6700 |
DRUMS | 2,650 | SD |
$0.3500 |
$2.00 |
$0.0300 |
$1.03 |
$1.05 |
$1.05 |
| 880 | 880(G)6805 |
CHANNELIZER CONES | 29,415 | SD |
$0.2500 |
$1.00 |
$0.9900 |
$0.5200 |
$0.5500 |
$0.5500 |
| 890 | 880(I)7000 |
FLAGGER | 135 | SD |
$140.00 |
$600.00 |
$675.00 |
$241.80 |
$700.00 |
$106.00 |
| 900 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 90 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 910 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 558 | SD |
$16.95 |
$10.00 |
$10.40 |
$5.17 |
$5.25 |
$5.30 |
| 920 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 22,593 | LF |
$0.4000 |
$0.4500 |
$0.4500 |
$0.5300 |
$0.3500 |
$0.3500 |
| 930 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 45,290 | LF |
$0.3000 |
$0.3000 |
$0.3000 |
$0.5100 |
$0.2500 |
$0.2500 |
| 940 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 34 | EA |
$150.00 |
$55.00 |
$182.00 |
$51.73 |
$55.00 |
$53.00 |
| 950 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$400.00 |
$300.00 |
$208.00 |
$387.93 |
$400.00 |
$397.50 |
| 960 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 957 | SF |
$45.00 |
$26.00 |
$49.90 |
$25.86 |
$27.00 |
$26.50 |
| 970 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 1,323 | LF |
$7.00 |
$11.00 |
$7.30 |
$10.35 |
$10.50 |
$10.60 |
| 980 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 71,445 | LF |
$0.6000 |
$0.6500 |
$0.7500 |
$0.6300 |
$0.6500 |
$0.9500 |
| 990 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 1,000 | LF |
$2.00 |
$1.10 |
$1.05 |
$1.03 |
$1.05 |
$1.05 |
| 1,000 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 302 | LF |
$8.00 |
$16.00 |
$11.00 |
$15.52 |
$16.00 |
$15.90 |
| 1,010 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 12 | EA |
$250.00 |
$150.00 |
$365.00 |
$129.31 |
$130.00 |
$133.00 |
| 1,020 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$49,800.00 |
$123,500.00 |
$50,000.00 |
$144,152.20 |
$55,000.00 |
$42,400.00 |
| 1,030 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 113,810 | CY |
$10.00 |
$9.50 |
$8.85 |
$7.41 |
$7.50 |
$7.80 |
| 1,040 | 202(D)2500 |
UNCLASSIFIED BORROW | 360 | CY |
$20.00 |
$1.00 |
$7.15 |
$0.3600 |
$12.75 |
$21.20 |
| 1,050 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$175,000.00 |
$100,000.00 |
$120,379.90 |
$130,000.00 |
$37,100.00 |
| 1,060 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,330 | LF |
$3.50 |
$3.00 |
$3.65 |
$4.91 |
$3.75 |
$3.75 |
| 1,070 | 221(E)2600 |
TEMPORARY SILT DIKE | 4,578 | LF |
$14.00 |
$11.00 |
$10.40 |
$10.35 |
$11.00 |
$10.60 |
| 1,080 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 60 | CY |
$200.00 |
$230.00 |
$500.00 |
$301.65 |
$170.00 |
$196.10 |
| 1,090 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 8 | EA |
$400.00 |
$210.00 |
$312.00 |
$310.34 |
$320.00 |
$371.00 |
| 1,100 | 230(A)7200 |
SOLID SLAB SODDING | 8,000 | SY |
$3.00 |
$4.00 |
$3.40 |
$3.36 |
$3.50 |
$3.45 |
| 1,110 | 233(E)0600 |
(SP) HYDROMULCH | 186,448.1 | SY |
$1.50 |
$1.10 |
$2.25 |
$2.22 |
$2.30 |
$2.30 |
| 1,120 | 241 3100 |
MOWING | 136.6 | AC |
$250.00 |
$250.00 |
$208.00 |
$201.34 |
$210.00 |
$212.00 |
| 1,130 | 303(A)1200 |
AGGREGATE BASE TYPE A | 15,121 | CY |
$80.00 |
$91.00 |
$51.25 |
$78.74 |
$100.00 |
$74.20 |
| 1,140 | 307(K)4200 |
STABILIZED SUBGRADE | 85,988 | SY |
$9.00 |
$7.00 |
$8.85 |
$7.36 |
$5.00 |
$7.45 |
| 1,150 | 325 0100 |
SEPARATOR FABRIC | 85,988 | SY |
$2.00 |
$1.10 |
$2.55 |
$1.45 |
$1.35 |
$2.15 |
| 1,160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,387 | TON |
$50.00 |
$46.00 |
$47.30 |
$45.81 |
$36.00 |
$58.30 |
| 1,170 | 407(B)7300 |
TACK COAT | 32,648 | GAL |
$4.00 |
$3.00 |
$2.75 |
$2.74 |
$3.50 |
$4.55 |
| 1,180 | 409(A)9200 |
FABRIC REINFORCEMENT | 22,223 | SY |
$2.50 |
$1.50 |
$0.7500 |
$0.7800 |
$2.25 |
$8.60 |
| 1,190 | 409(B)9300 |
BITUMINOUS BINDER | 4,445 | GAL |
$4.00 |
$4.10 |
$1.25 |
$1.29 |
$6.50 |
$6.50 |
| 1,200 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 9,300 | TON |
$120.00 |
$99.00 |
$112.50 |
$109.13 |
$113.00 |
$108.95 |
| 1,210 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 42,573 | TON |
$105.00 |
$94.00 |
$101.50 |
$103.44 |
$97.25 |
$99.65 |
| 1,220 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,440 | TON |
$130.00 |
$110.00 |
$126.50 |
$125.17 |
$117.00 |
$127.05 |
| 1,230 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,027 | TON |
$120.00 |
$99.00 |
$115.00 |
$115.86 |
$102.00 |
$108.20 |
| 1,240 | 412 3100 |
COLD MILLING PAVEMENT | 67,309 | SY |
$3.50 |
$2.00 |
$2.75 |
$1.63 |
$2.30 |
$2.70 |
| 1,250 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 128 | CY |
$35.00 |
$47.00 |
$31.60 |
$36.21 |
$28.00 |
$42.40 |
| 1,260 | 509(A)0200 |
CLASS AA CONCRETE | 721 | CY |
$700.00 |
$621.00 |
$641.50 |
$736.56 |
$875.00 |
$1,035.00 |
| 1,270 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 6 | CY |
$2,000.00 |
$910.00 |
$1,775.00 |
$1,218.44 |
$500.00 |
$901.00 |
| 1,280 | 511(A)2200 |
REINFORCING STEEL | 98,740 | LB |
$1.40 |
$1.35 |
$1.35 |
$1.36 |
$1.20 |
$1.25 |
| 1,290 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 10 | TON |
$62.00 |
$114.00 |
$144.50 |
$99.34 |
$150.00 |
$132.50 |
| 1,300 | 602(B)2310 |
REVETMENT MATTRESSES | 3,684 | SY |
$45.00 |
$60.00 |
$55.00 |
$56.19 |
$56.00 |
$58.30 |
| 1,310 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 948 | SY |
$100.00 |
$75.00 |
$81.00 |
$62.42 |
$88.00 |
$84.80 |
| 1,320 | 611(G)9000 |
INLET CDI RCP DES. 1 | 2 | EA |
$4,400.00 |
$3,365.00 |
$3,375.00 |
$3,005.30 |
$5,000.00 |
$3,286.00 |
| 1,330 | 611(G)9004 |
INLET CDI RCP DES. 2 | 6 | EA |
$4,900.00 |
$3,315.00 |
$3,475.00 |
$3,228.23 |
$5,200.00 |
$4,240.00 |
| 1,340 | 611(L)1600 |
JUNCTION BOXES | 127 | CF |
$153.00 |
$117.00 |
$224.50 |
$203.44 |
$104.00 |
$122.00 |
| 1,350 | 613(A)5208 |
18" R.C.PIPE CLASS III | 728 | LF |
$100.00 |
$68.00 |
$67.70 |
$93.30 |
$70.00 |
$67.85 |
| 1,360 | 613(A)5216 |
24" R.C.PIPE CLASS III | 638 | LF |
$120.00 |
$77.00 |
$110.50 |
$103.35 |
$77.00 |
$82.70 |
| 1,370 | 613(A)5224 |
36" R.C.PIPE CLASS III | 92 | LF |
$200.00 |
$130.00 |
$150.50 |
$188.33 |
$120.00 |
$170.00 |
| 1,380 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 54 | LF |
$135.00 |
$82.00 |
$87.30 |
$108.62 |
$112.00 |
$159.00 |
| 1,390 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 796 | LF |
$140.00 |
$111.00 |
$118.50 |
$129.23 |
$123.00 |
$117.00 |
| 1,400 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 63 | LF |
$190.00 |
$139.00 |
$168.50 |
$210.80 |
$180.00 |
$169.60 |
| 1,410 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 776 | LF |
$60.00 |
$59.00 |
$43.70 |
$37.16 |
$65.00 |
$68.90 |
| 1,420 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 452 | LF |
$75.00 |
$69.00 |
$54.20 |
$44.11 |
$80.00 |
$74.20 |
| 1,430 | 613(B)5532 |
42" CORR. GALV. STEEL PIPE | 82 | LF |
$125.00 |
$95.00 |
$82.10 |
$76.27 |
$95.00 |
$143.10 |
| 1,440 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 70 | LF |
$72.00 |
$73.00 |
$44.20 |
$38.09 |
$100.00 |
$80.55 |
| 1,450 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,776 | LF |
$30.00 |
$23.00 |
$26.50 |
$40.51 |
$30.00 |
$20.15 |
| 1,460 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 592 | LF |
$30.00 |
$30.00 |
$26.50 |
$17.88 |
$42.00 |
$30.75 |
| 1,470 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$600.00 |
$700.00 |
$475.00 |
$347.15 |
$883.93 |
$1,272.00 |
| 1,480 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,200.00 |
$1,600.00 |
$1,145.00 |
$1,166.77 |
$1,300.00 |
$1,590.00 |
| 1,490 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$2,000.00 |
$2,100.00 |
$2,265.00 |
$2,388.87 |
$2,300.00 |
$2,120.00 |
| 1,500 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 19 | EA |
$2,000.00 |
$2,300.00 |
$1,475.00 |
$2,068.94 |
$2,300.00 |
$1,908.00 |
| 1,510 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 16 | EA |
$2,500.00 |
$2,600.00 |
$1,950.00 |
$2,275.84 |
$2,400.00 |
$2,015.00 |
| 1,520 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 1 | EA |
$3,500.00 |
$3,650.00 |
$3,910.00 |
$3,103.41 |
$2,600.00 |
$2,120.00 |
| 1,530 | 613(M)6980 |
TYPE AA4 CULVERT END TREATMENT | 2 | EA |
$3,300.00 |
$3,100.00 |
$3,160.00 |
$2,689.62 |
$3,600.00 |
$2,225.00 |
| 1,540 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 20 | EA |
$2,700.00 |
$2,600.00 |
$2,525.00 |
$2,379.28 |
$2,400.00 |
$2,335.00 |
| 1,550 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 18 | EA |
$3,000.00 |
$3,315.00 |
$3,005.00 |
$2,586.17 |
$2,600.00 |
$2,440.00 |
| 1,560 | 613(M)7016 |
TYPE D6 CULVERT END TREATMENT | 1 | EA |
$4,000.00 |
$4,000.00 |
$5,670.00 |
$3,413.74 |
$3,400.00 |
$2,545.00 |
| 1,570 | 613(M)7024 |
TYPE AA6 CULVERT END TREATMENT | 2 | EA |
$3,600.00 |
$4,400.00 |
$4,660.00 |
$2,896.51 |
$3,700.00 |
$2,968.00 |
| 1,580 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$32,232.00 |
$232,000.00 |
$40,955.00 |
$30,939.16 |
$33,000.00 |
$37,100.00 |
| 1,590 | 619(B)6300 |
REMOVAL OF HEADWALL | 19 | EA |
$1,350.00 |
$2,100.00 |
$1,585.00 |
$1,208.01 |
$1,000.00 |
$530.00 |
| 1,600 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 500 | SY |
$8.85 |
$7.00 |
$36.50 |
$10.17 |
$12.00 |
$15.90 |
| 1,610 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,523 | LF |
$9.00 |
$5.00 |
$5.15 |
$4.21 |
$2.15 |
$2.15 |
| 1,620 | 619(C)6600 |
SAWING PAVEMENT | 50,040 | LF |
$3.50 |
$1.60 |
$1.05 |
$1.20 |
$2.35 |
$3.20 |
| 1,630 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 4,679 | LF |
$10.00 |
$7.00 |
$4.20 |
$6.88 |
$8.00 |
$7.05 |
| 1,640 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 9,912 | LF |
$10.50 |
$7.00 |
$8.35 |
$6.98 |
$9.00 |
$7.20 |
| 1,650 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 573 | LF |
$12.00 |
$7.50 |
$10.50 |
$7.14 |
$10.00 |
$7.30 |
| 1,660 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 8 | EA |
$215.00 |
$130.00 |
$234.00 |
$129.31 |
$130.00 |
$133.00 |
| 1,670 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$350.00 |
$210.00 |
$312.00 |
$206.90 |
$210.00 |
$212.00 |
| 1,680 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$120.00 |
$52.00 |
$130.00 |
$51.73 |
$55.00 |
$53.00 |
| 1,690 | 629(E)7600 |
MAILBOX | 10 | EA |
$75.00 |
$210.00 |
$52.00 |
$206.90 |
$210.00 |
$212.00 |
| 1,700 | 648(C)6450 |
GAS LINE RELOCATION | 1 | LSUM |
$354,285.00 |
$640,000.00 |
$632,500.00 |
$616,944.97 |
$185,000.00 |
$487,600.00 |
| 1,710 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,558 | CY |
$11.00 |
$15.00 |
$8.65 |
$15.46 |
$14.00 |
$13.25 |
| 1,720 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 203.2 | CY |
$40.00 |
$47.00 |
$31.60 |
$31.04 |
$35.00 |
$42.40 |
| 1,730 | 509(A)0210 |
CLASS AA CONCRETE | 641.4 | CY |
$700.00 |
$600.00 |
$641.50 |
$576.43 |
$775.00 |
$589.00 |
| 1,740 | 511(A)2210 |
REINFORCING STEEL | 116,060 | LB |
$1.50 |
$1.35 |
$1.35 |
$1.36 |
$1.20 |
$1.25 |
| 1,750 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$12,500.00 |
$37,500.00 |
$6,206.81 |
$10,000.00 |
$15,900.00 |
| 1,760 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 565 | CY |
$11.00 |
$16.00 |
$8.65 |
$15.55 |
$12.00 |
$13.25 |
| 1,770 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 281.8 | CY |
$40.00 |
$47.00 |
$31.60 |
$31.04 |
$28.00 |
$42.40 |
| 1,780 | 509(A)0210 |
CLASS AA CONCRETE | 319.8 | CY |
$700.00 |
$600.00 |
$63.20 |
$594.76 |
$825.00 |
$648.20 |
| 1,790 | 511(A)2210 |
REINFORCING STEEL | 55,320 | LB |
$1.50 |
$1.35 |
$1.35 |
$1.36 |
$1.20 |
$1.25 |
| 1,800 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$12,500.00 |
$26,825.00 |
$6,206.81 |
$10,000.00 |
$15,900.00 |
| 1,810 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 4,915 | CY |
$11.00 |
$15.00 |
$8.65 |
$10.73 |
$14.00 |
$13.25 |
| 1,820 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 465.6 | CY |
$40.00 |
$47.00 |
$30.50 |
$25.86 |
$35.00 |
$42.40 |
| 1,830 | 509(A)0210 |
CLASS AA CONCRETE | 686.1 | CY |
$700.00 |
$600.00 |
$641.50 |
$571.29 |
$805.00 |
$585.10 |
| 1,840 | 511(A)2210 |
REINFORCING STEEL | 128,990 | LB |
$1.50 |
$1.35 |
$1.35 |
$1.36 |
$1.20 |
$1.25 |
| 1,850 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$12,500.00 |
$42,845.00 |
$6,206.81 |
$10,000.00 |
$15,900.00 |
| 1,860 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 135 | SD |
$180.00 |
$165.00 |
$133.00 |
$129.31 |
$145.00 |
$133.00 |
| 1,870 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 50,000 | LF |
$0.5000 |
$0.1500 |
$0.2800 |
$0.1100 |
$0.1200 |
$0.1500 |
| 1,880 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 1,250 | EA |
$8.00 |
$3.15 |
$6.50 |
$3.10 |
$3.25 |
$3.15 |
| 1,890 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 135 | SD |
$17.00 |
$20.00 |
$46.80 |
$10.35 |
$10.50 |
$10.60 |
| 1,900 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 265 | SD |
$25.40 |
$10.00 |
$130.00 |
$5.17 |
$5.25 |
$5.30 |
| 1,910 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 400 | LF |
$30.00 |
$69.00 |
$59.30 |
$31.04 |
$32.00 |
$31.80 |
| 1,920 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 9,200 | LF |
$5.00 |
$6.00 |
$0.4200 |
$2.07 |
$2.05 |
$2.15 |
| 1,930 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,650 | SD |
$0.4000 |
$3.00 |
$0.2100 |
$2.07 |
$2.05 |
$2.15 |
| 1,940 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,375 | SD |
$1.00 |
$3.00 |
$0.0600 |
$1.55 |
$1.60 |
$1.60 |
| 1,950 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,035 | SD |
$1.40 |
$3.00 |
$0.0600 |
$2.07 |
$2.10 |
$2.15 |
| 1,960 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,650 | SD |
$0.8500 |
$3.00 |
$0.0300 |
$2.33 |
$2.35 |
$2.40 |
| 1,970 | 880(D)6500 |
VERTICAL PANELS | 1,325 | SD |
$0.4000 |
$1.00 |
$0.2100 |
$0.1600 |
$0.1600 |
$0.1500 |
| 1,980 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 14,310 | SD |
$0.4500 |
$1.00 |
$0.0300 |
$0.2600 |
$0.2600 |
$0.3000 |
| 1,990 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 2,650 | SD |
$0.2500 |
$2.00 |
$0.0300 |
$1.03 |
$1.05 |
$1.05 |
| 2,000 | 880(F)6700 |
DRUMS | 2,650 | SD |
$0.3000 |
$2.00 |
$0.0300 |
$1.03 |
$1.05 |
$1.05 |
| 2,010 | 880(G)6805 |
CHANNELIZER CONES | 29,415 | SD |
$0.5000 |
$1.00 |
$0.9900 |
$0.5200 |
$0.5500 |
$0.5500 |
| 2,020 | 880(I)7000 |
FLAGGER | 135 | SD |
$140.00 |
$600.00 |
$675.00 |
$241.80 |
$700.00 |
$106.00 |
| 2,030 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 90 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 2,040 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 558 | SD |
$15.00 |
$10.00 |
$10.40 |
$5.17 |
$5.25 |
$5.30 |
| 2,050 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 27,747 | LF |
$0.4000 |
$0.4500 |
$0.4500 |
$0.5100 |
$0.3200 |
$0.3500 |
| 2,060 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 40,242 | LF |
$0.5000 |
$0.3000 |
$0.3000 |
$0.5300 |
$0.2500 |
$0.2500 |
| 2,070 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 28 | EA |
$150.00 |
$55.00 |
$182.00 |
$51.73 |
$54.00 |
$53.00 |
| 2,080 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$400.00 |
$400.00 |
$364.00 |
$387.93 |
$400.00 |
$397.50 |
| 2,090 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 595 | SF |
$45.00 |
$26.00 |
$48.90 |
$25.86 |
$27.00 |
$26.50 |
| 2,100 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 825 | LF |
$7.00 |
$11.00 |
$7.30 |
$10.35 |
$11.00 |
$10.60 |
| 2,110 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 69,175 | LF |
$0.6000 |
$0.6500 |
$0.7500 |
$0.6300 |
$0.6500 |
$0.6500 |
| 2,120 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 1,315 | LF |
$2.00 |
$1.10 |
$1.05 |
$1.03 |
$1.05 |
$1.10 |
| 2,130 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 302 | LF |
$8.00 |
$16.00 |
$11.00 |
$15.52 |
$16.00 |
$15.90 |
| 2,140 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 12 | EA |
$250.00 |
$150.00 |
$365.00 |
$129.31 |
$130.00 |
$133.00 |
| 2,150 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$563,000.00 |
$208,000.00 |
$150,000.00 |
$128,824.16 |
$252,000.00 |
$417,640.00 |
| 2,160 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$38,000.00 |
$35,000.00 |
$30,000.00 |
$5,172.35 |
$55,000.00 |
$31,800.00 |
| 2,170 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,462,000.00 |
|
|
|
|
|