| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$75,000.00 |
$61,095.00 |
$115,875.00 |
$71,241.39 |
$55,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 166,844 | CY |
$10.00 |
$6.30 |
$8.25 |
$6.87 |
$14.75 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 500 | CY |
$20.00 |
$3.30 |
$16.50 |
$21.38 |
$10.00 |
| 40 | 205(A)6210 |
TYPE A-SALVAGED TOPSOIL | 35,519 | CY |
$5.00 |
$3.80 |
$9.30 |
$3.25 |
$5.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,293 | LF |
$3.00 |
$4.80 |
$4.65 |
$6.33 |
$5.00 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 8 | EA |
$360.00 |
$214.00 |
$206.00 |
$244.35 |
$225.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 5,796 | LF |
$9.00 |
$15.00 |
$14.40 |
$17.10 |
$16.00 |
| 80 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 512 | CY |
$150.00 |
$187.50 |
$103.00 |
$189.88 |
$225.00 |
| 90 | 221(F)2730 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 15 | CY |
$235.00 |
$187.50 |
$206.00 |
$233.18 |
$3,600.00 |
| 100 | 229 6100 |
DITCH LINER PROTECTION | 5,646 | LF |
$3.00 |
$2.65 |
$2.55 |
$3.05 |
$3.00 |
| 110 | 230(A)7200 |
SOLID SLAB SODDING | 255,730 | SY |
$3.00 |
$2.95 |
$2.80 |
$3.36 |
$3.25 |
| 120 | 232(A)9200 |
SEEDING METHOD A | 52.84 | AC |
$530.00 |
$1,926.00 |
$1,855.00 |
$2,199.07 |
$2,000.00 |
| 130 | 233(A)0200 |
VEGETATIVE MULCHING | 52.84 | AC |
$495.00 |
$1,337.00 |
$1,288.00 |
$1,527.13 |
$1,400.00 |
| 140 | 241 3100 |
MOWING | 105.68 | AC |
$153.00 |
$214.00 |
$206.00 |
$244.35 |
$225.00 |
| 150 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 4 | EA |
$3,500.00 |
$5,403.00 |
$3,605.00 |
$15,413.30 |
$2,600.00 |
| 160 | 303(A)1200 |
AGGREGATE BASE TYPE A | 21,143 | CY |
$50.00 |
$105.00 |
$70.60 |
$94.56 |
$118.00 |
| 170 | 307(K)4200 |
STABILIZED SUBGRADE | 118,008 | SY |
$7.00 |
$6.80 |
$8.25 |
$7.28 |
$6.25 |
| 180 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 108,900 | SY |
$3.00 |
$5.55 |
$3.20 |
$4.09 |
$3.75 |
| 190 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 9,890 | TON |
$45.00 |
$12.90 |
$46.35 |
$46.22 |
$40.00 |
| 200 | 407(B)7300 |
TACK COAT | 31,522 | GAL |
$5.00 |
$3.10 |
$5.10 |
$3.91 |
$3.50 |
| 210 | 408 8100 |
PRIME COAT | 67,898 | GAL |
$5.00 |
$0.2500 |
$5.00 |
$0.1000 |
$3.00 |
| 220 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,849 | TON |
$110.00 |
$132.50 |
$108.50 |
$166.15 |
$128.00 |
| 230 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,487 | TON |
$110.00 |
$116.50 |
$105.75 |
$146.00 |
$104.00 |
| 240 | 411(B)1340 |
SUPERPAVE, TYPE S3(PG 58-28 OK) | 17,096 | TON |
$115.00 |
$105.00 |
$106.30 |
$131.34 |
$112.00 |
| 250 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 10,278 | TON |
$120.00 |
$129.00 |
$118.95 |
$161.27 |
$124.00 |
| 260 | 411(C)1440 |
SUPERPAVE, TYPE S4(PG 58-28 OK) | 7,008 | TON |
$110.00 |
$119.00 |
$107.95 |
$161.27 |
$119.00 |
| 270 | 412 3100 |
COLD MILLING PAVEMENT | 68,945 | SY |
$3.00 |
$4.50 |
$3.75 |
$1.66 |
$1.90 |
| 280 | 413(B)4300 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 12 | EAGP |
$882.00 |
$2,434.00 |
$1,854.00 |
$2,199.07 |
$2,075.00 |
| 290 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 58,174 | LF |
$0.5000 |
$0.2000 |
$0.2500 |
$0.2800 |
$0.2500 |
| 300 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 199 | CY |
$30.00 |
$49.20 |
$46.35 |
$30.72 |
$44.00 |
| 310 | 509(A)0200 |
CLASS AA CONCRETE | 904 | CY |
$700.00 |
$634.00 |
$597.40 |
$817.21 |
$885.00 |
| 320 | 509(D)0500 |
CLASS C CONCRETE | 509 | CY |
$500.00 |
$437.00 |
$412.00 |
$483.34 |
$450.00 |
| 330 | 511(A)2200 |
REINFORCING STEEL | 132,266 | LB |
$1.50 |
$1.50 |
$1.35 |
$1.36 |
$1.00 |
| 340 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 4,969 | TON |
$50.00 |
$106.50 |
$103.00 |
$83.93 |
$120.00 |
| 350 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 1,828 | TON |
$41.00 |
$93.40 |
$103.00 |
$53.79 |
$110.00 |
| 360 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 6,697 | SY |
$4.00 |
$3.40 |
$20.60 |
$2.33 |
$3.00 |
| 370 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 234 | LF |
$47.00 |
$52.50 |
$49.40 |
$57.42 |
$70.00 |
| 380 | 609(B)4370 |
2'-8" COMB.CRB.& GUT.(6" MNTBLE) | 506 | LF |
$30.00 |
$52.50 |
$49.40 |
$51.31 |
$90.00 |
| 390 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 69 | SY |
$70.00 |
$87.40 |
$82.40 |
$79.41 |
$160.00 |
| 400 | 611(A)7211 |
(PL) MANHOLE (4' DIA.) | 1 | EA |
$3,355.00 |
$5,051.00 |
$2,987.00 |
$3,291.18 |
$3,800.00 |
| 410 | 611(A)7216 |
(PL) MANHOLE (5' DIA.) | 1 | EA |
$4,700.00 |
$6,396.00 |
$4,429.00 |
$4,744.02 |
$5,000.00 |
| 420 | 611(G)0350 |
INLET (SMD-TYPE 1) | 1 | EA |
$4,000.00 |
$7,033.00 |
$5,253.00 |
$6,369.34 |
$6,100.00 |
| 430 | 611(G)7754 |
INLET CI DES. 2 (STD) | 1 | EA |
$4,910.00 |
$6,714.00 |
$4,841.00 |
$5,086.54 |
$5,200.00 |
| 440 | 611(G)8020 |
INLET CDI RCB DES. 6 | 1 | EA |
$6,000.00 |
$8,372.00 |
$5,562.00 |
$6,549.66 |
$9,000.00 |
| 450 | 611(G)9008 |
INLET CDI RCP DES. 3 | 1 | EA |
$5,000.00 |
$5,079.00 |
$3,296.00 |
$3,782.63 |
$4,300.00 |
| 460 | 611(G)9012 |
INLET CDI RCP DES. 4 | 3 | EA |
$5,500.00 |
$5,079.00 |
$5,768.00 |
$3,782.63 |
$4,300.00 |
| 470 | 611(G)9054 |
INLET CDI 30SK RCP DES.2 | 1 | EA |
$4,250.00 |
$5,073.00 |
$3,090.00 |
$3,223.24 |
$5,200.00 |
| 480 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 3 | VF |
$460.00 |
$614.00 |
$1,854.00 |
$559.58 |
$1,000.00 |
| 490 | 611(H)0540 |
ADD'L DEPTH IN INLET CDI RCB DES. 6 | 1 | VF |
$600.00 |
$603.00 |
$2,060.00 |
$554.83 |
$1,200.00 |
| 500 | 611(H)0692 |
ADD'L DEPTH IN INLET CDI RCP DES. 4 | 4 | VF |
$600.00 |
$926.50 |
$2,163.00 |
$907.92 |
$1,400.00 |
| 510 | 613(A)5208 |
18" R.C.PIPE CLASS III | 642 | LF |
$76.00 |
$92.20 |
$108.00 |
$109.26 |
$83.00 |
| 520 | 613(A)5216 |
24" R.C.PIPE CLASS III | 293 | LF |
$91.00 |
$143.50 |
$118.50 |
$123.31 |
$146.00 |
| 530 | 613(A)5220 |
30" R.C.PIPE CLASS III | 8 | LF |
$125.00 |
$180.50 |
$412.00 |
$181.48 |
$160.00 |
| 540 | 613(A)5224 |
36" R.C.PIPE CLASS III | 290 | LF |
$141.00 |
$219.00 |
$128.75 |
$205.56 |
$210.00 |
| 550 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 78 | LF |
$106.00 |
$99.90 |
$139.05 |
$126.69 |
$120.00 |
| 560 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 23 | LF |
$118.00 |
$151.00 |
$190.55 |
$151.80 |
$140.00 |
| 570 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 329 | LF |
$151.00 |
$163.50 |
$139.05 |
$220.20 |
$155.00 |
| 580 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 28 | LF |
$36.00 |
$80.30 |
$113.25 |
$89.13 |
$45.00 |
| 590 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 5 | LF |
$21.00 |
$83.20 |
$180.25 |
$162.01 |
$45.00 |
| 600 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 549 | LF |
$16.00 |
$56.40 |
$27.75 |
$19.75 |
$45.00 |
| 610 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 5 | LF |
$20.00 |
$843.00 |
$669.50 |
$152.42 |
$45.00 |
| 620 | 613(L)6612 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 8 | EA |
$1,400.00 |
$1,574.00 |
$1,648.00 |
$748.00 |
$1,100.00 |
| 630 | 613(L)6620 |
28" X 18" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,475.00 |
$1,898.00 |
$1,957.00 |
$1,017.30 |
$1,300.00 |
| 640 | 613(L)6636 |
36" X 22" PREFAB. CULVERT END SEC., ARCH | 10 | EA |
$1,770.00 |
$2,763.00 |
$3,914.00 |
$2,521.86 |
$2,100.00 |
| 650 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 42 | EA |
$555.00 |
$1,574.00 |
$1,855.00 |
$1,121.80 |
$1,100.00 |
| 660 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$1,125.00 |
$1,613.00 |
$1,955.00 |
$897.44 |
$1,200.00 |
| 670 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,525.00 |
$1,976.00 |
$2,370.00 |
$2,018.30 |
$1,700.00 |
| 680 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 10 | EA |
$1,925.00 |
$2,902.00 |
$2,880.00 |
$2,535.49 |
$2,200.00 |
| 690 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$2,925.00 |
$3,279.00 |
$2,987.00 |
$3,389.64 |
$3,300.00 |
| 700 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$35,000.00 |
$20,385.00 |
$15,450.00 |
$21,117.25 |
$100,000.00 |
| 710 | 619(B)6300 |
REMOVAL OF HEADWALL | 42 | EA |
$965.00 |
$837.00 |
$1,803.00 |
$376.53 |
$2,300.00 |
| 720 | 619(B)6352 |
REMOVAL OF FENCE | 36,494 | LF |
$1.00 |
$2.15 |
$2.60 |
$1.76 |
$2.75 |
| 730 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 510 | SY |
$14.00 |
$18.10 |
$19.55 |
$19.21 |
$21.00 |
| 740 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 25,757 | SY |
$8.00 |
$13.20 |
$9.75 |
$7.06 |
$9.00 |
| 750 | 619(B)6368 |
REMOVAL OF DRAINAGE INLETS | 10 | EA |
$600.00 |
$1,621.00 |
$1,133.00 |
$1,065.69 |
$1,600.00 |
| 760 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 1,901 | LF |
$15.00 |
$32.40 |
$19.55 |
$25.48 |
$19.00 |
| 770 | 619(B)6508 |
REMOVE AND RESET CATTLE GUARD | 5 | EA |
$1,900.00 |
$540.50 |
$2,472.00 |
$3,516.95 |
$800.00 |
| 780 | 619(C)6600 |
SAWING PAVEMENT | 5,019 | LF |
$3.50 |
$2.50 |
$4.75 |
$1.62 |
$4.00 |
| 790 | 624(A)3200 |
FENCE-STYLE WWF | 693 | LF |
$9.00 |
$13.80 |
$11.30 |
$13.44 |
$12.50 |
| 800 | 624(B)3350 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 1 | EA |
$1,050.00 |
$1,297.00 |
$1,030.00 |
$1,221.71 |
$1,100.00 |
| 810 | 624(B)3380 |
GATES-STYLE WWF (4.5'HIGH X 20'LONG) | 1 | EA |
$1,310.00 |
$1,297.00 |
$1,236.00 |
$1,466.05 |
$1,300.00 |
| 820 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 10,822 | LF |
$7.00 |
$11.70 |
$10.25 |
$11.61 |
$10.50 |
| 830 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 4,128 | LF |
$8.00 |
$12.80 |
$10.30 |
$12.22 |
$11.00 |
| 840 | 624(D)3500 |
GATE, GALVANIZED STEEL | 18 | EA |
$1,250.00 |
$1,297.00 |
$1,545.00 |
$1,832.56 |
$1,700.00 |
| 850 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 9 | EA |
$188.00 |
$214.00 |
$206.00 |
$244.35 |
$225.00 |
| 860 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$48.00 |
$91.00 |
$154.50 |
$183.26 |
$170.00 |
| 870 | 629(E)7600 |
MAILBOX | 9 | EA |
$53.00 |
$42.80 |
$154.50 |
$183.26 |
$170.00 |
| 880 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 565.4 | CY |
$10.00 |
$4.30 |
$12.30 |
$12.11 |
$13.00 |
| 890 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 78.2 | CY |
$26.00 |
$49.20 |
$46.30 |
$30.72 |
$51.00 |
| 900 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$9,900.00 |
$7,650.00 |
$7,210.00 |
$30,130.18 |
$8,000.00 |
| 910 | 509(A)0210 |
CLASS AA CONCRETE | 161.9 | CY |
$700.00 |
$634.00 |
$683.25 |
$861.07 |
$790.00 |
| 920 | 511(A)2210 |
REINFORCING STEEL | 24,610 | LB |
$1.50 |
$1.50 |
$1.40 |
$1.36 |
$1.50 |
| 930 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$6,000.00 |
$37,500.00 |
$8,961.00 |
$4,914.71 |
$10,000.00 |
| 940 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 4,434.8 | CY |
$10.00 |
$4.30 |
$12.35 |
$12.11 |
$13.00 |
| 950 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 352.6 | CY |
$26.00 |
$49.20 |
$46.35 |
$30.72 |
$51.00 |
| 960 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$158,400.00 |
$32,785.00 |
$30,900.00 |
$69,611.95 |
$35,000.00 |
| 970 | 509(A)0210 |
CLASS AA CONCRETE | 786.1 | CY |
$700.00 |
$634.00 |
$615.00 |
$682.69 |
$790.00 |
| 980 | 511(A)2210 |
REINFORCING STEEL | 108,440 | LB |
$1.50 |
$1.50 |
$1.40 |
$1.29 |
$1.50 |
| 990 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$47,500.00 |
$25,750.00 |
$8,600.73 |
$29,000.00 |
| 1,000 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 1,682.2 | CY |
$10.00 |
$4.30 |
$12.35 |
$12.11 |
$13.00 |
| 1,010 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 403 | CY |
$26.00 |
$49.20 |
$46.35 |
$30.72 |
$51.00 |
| 1,020 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$110,000.00 |
$27,320.00 |
$25,750.00 |
$69,611.95 |
$30,000.00 |
| 1,030 | 509(A)0210 |
CLASS AA CONCRETE | 542.6 | CY |
$700.00 |
$634.00 |
$623.00 |
$698.98 |
$790.00 |
| 1,040 | 511(A)2210 |
REINFORCING STEEL | 78,270 | LB |
$1.50 |
$1.50 |
$1.40 |
$1.29 |
$1.50 |
| 1,050 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$42,500.00 |
$20,600.00 |
$8,600.73 |
$25,000.00 |
| 1,060 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 867.8 | CY |
$10.00 |
$4.30 |
$12.35 |
$12.11 |
$13.00 |
| 1,070 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 118.6 | CY |
$26.00 |
$49.20 |
$46.35 |
$30.72 |
$51.00 |
| 1,080 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$60,800.00 |
$32,785.00 |
$30,900.00 |
$38,187.74 |
$35,000.00 |
| 1,090 | 509(A)0210 |
CLASS AA CONCRETE | 241.9 | CY |
$700.00 |
$634.00 |
$655.00 |
$760.68 |
$790.00 |
| 1,100 | 511(A)2210 |
REINFORCING STEEL | 34,220 | LB |
$1.50 |
$1.50 |
$1.40 |
$1.36 |
$1.50 |
| 1,110 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$8,000.00 |
$47,500.00 |
$25,750.00 |
$8,600.73 |
$30,000.00 |
| 1,120 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 11 | EA |
$240.00 |
$198.00 |
$309.00 |
$366.51 |
$350.00 |
| 1,130 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 558 | SF |
$45.00 |
$50.30 |
$36.05 |
$42.76 |
$40.00 |
| 1,140 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 697 | LF |
$13.00 |
$10.70 |
$11.35 |
$13.44 |
$12.00 |
| 1,150 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 124,555 | LF |
$1.00 |
$0.8500 |
$1.10 |
$1.03 |
$1.00 |
| 1,160 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,914 | LF |
$2.00 |
$1.30 |
$2.05 |
$2.44 |
$2.25 |
| 1,170 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 4,068 | LF |
$2.00 |
$2.90 |
$3.65 |
$4.28 |
$4.00 |
| 1,180 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 121 | LF |
$10.00 |
$10.70 |
$30.90 |
$36.65 |
$35.00 |
| 1,190 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 36 | EA |
$185.00 |
$267.50 |
$257.50 |
$305.42 |
$300.00 |
| 1,200 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 290 | SD |
$140.00 |
$117.50 |
$267.80 |
$317.64 |
$300.00 |
| 1,210 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 138,884 | LF |
$0.2500 |
$0.2400 |
$0.2500 |
$0.2700 |
$0.2500 |
| 1,220 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 38,712 | LF |
$1.25 |
$1.20 |
$1.75 |
$2.08 |
$2.00 |
| 1,230 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 6,192 | EA |
$1.00 |
$0.7000 |
$1.55 |
$0.8600 |
$1.25 |
| 1,240 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 1,008 | LF |
$1.25 |
$3.50 |
$2.05 |
$2.44 |
$2.15 |
| 1,250 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 3,096 | EA |
$5.50 |
$6.40 |
$9.75 |
$11.61 |
$11.00 |
| 1,260 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 3,096 | EA |
$5.50 |
$6.40 |
$9.75 |
$11.61 |
$11.00 |
| 1,270 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 460 | SD |
$11.00 |
$23.50 |
$25.75 |
$30.54 |
$30.00 |
| 1,280 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,101 | LF |
$25.00 |
$21.10 |
$30.90 |
$40.84 |
$22.00 |
| 1,290 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 7,477 | LF |
$5.00 |
$3.20 |
$10.30 |
$3.42 |
$18.00 |
| 1,300 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,410 | SD |
$0.2500 |
$0.0300 |
$1.05 |
$1.22 |
$1.15 |
| 1,310 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,170 | SD |
$0.5000 |
$1.75 |
$5.15 |
$6.11 |
$5.50 |
| 1,320 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,230 | SD |
$1.00 |
$0.5900 |
$2.60 |
$3.05 |
$2.75 |
| 1,330 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 11,400 | SD |
$0.2500 |
$0.0600 |
$1.30 |
$1.53 |
$1.40 |
| 1,340 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 27,290 | SD |
$0.2500 |
$0.2100 |
$0.2500 |
$0.3100 |
$0.3000 |
| 1,350 | 880(F)6700 |
DRUMS | 20,060 | SD |
$1.00 |
$1.45 |
$0.8500 |
$0.9800 |
$0.9000 |
| 1,360 | 880(I)7000 |
FLAGGER | 50 | SD |
$110.00 |
$1,000.00 |
$132.50 |
$309.09 |
$1,500.00 |
| 1,370 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,000 | SD |
$12.00 |
$21.40 |
$15.45 |
$18.33 |
$17.00 |
| 1,380 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$200,000.00 |
$110,000.00 |
$161,000.00 |
$113,087.28 |
$210,000.00 |
| 1,390 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$21,200.00 |
$4,275.98 |
$90,000.00 |
| 1,400 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$705,000.00 |
$808,874.91 |
$790,000.00 |
$204,854.49 |
$900,000.00 |