| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$18,180.00 |
$15,000.00 |
$15,730.00 |
$14,500.00 |
$37,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 30,142 | CY |
$7.00 |
$8.10 |
$4.25 |
$9.13 |
$8.40 |
$5.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 37,088 | CY |
$8.00 |
$8.95 |
$10.50 |
$8.03 |
$7.40 |
$8.00 |
| 4 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 11,114 | CY |
$7.00 |
$2.75 |
$6.00 |
$4.40 |
$5.45 |
$7.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,484 | LF |
$1.50 |
$1.00 |
$2.00 |
$1.10 |
$1.00 |
$1.15 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 203 | LF |
$10.00 |
$5.05 |
$15.00 |
$5.50 |
$5.05 |
$5.50 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 10,381 | LF |
$1.25 |
$0.9600 |
$1.50 |
$1.05 |
$0.9500 |
$1.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 97,623 | SY |
$1.30 |
$1.00 |
$1.50 |
$1.10 |
$1.02 |
$1.15 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 40 | AC |
$250.00 |
$55.60 |
$110.00 |
$60.50 |
$55.85 |
$62.00 |
| 10 | 241 2832 |
MOWING | 40 | AC |
$75.00 |
$35.40 |
$110.00 |
$38.50 |
$35.55 |
$38.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 12,452 | CY |
$50.00 |
$60.20 |
$53.00 |
$42.00 |
$59.40 |
$64.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 11,873 | SY |
$8.50 |
$12.60 |
$6.30 |
$6.00 |
$5.55 |
$5.00 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 11,518 | TON |
$25.00 |
$27.40 |
$30.00 |
$30.00 |
$30.45 |
$29.00 |
| 14 | 407(B) 0250 |
TACK COAT | 9,722 | GAL |
$3.50 |
$3.55 |
$1.75 |
$2.00 |
$3.35 |
$3.50 |
| 15 | 408 5774 |
PRIME COAT | 43,986 | GAL |
$5.00 |
$6.45 |
$2.00 |
$3.00 |
$2.86 |
$3.00 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 13,904 | TON |
$70.00 |
$52.90 |
$55.00 |
$62.23 |
$62.60 |
$66.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,954 | TON |
$75.00 |
$63.00 |
$66.00 |
$70.58 |
$72.05 |
$73.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 1,349 | CY |
$250.00 |
$207.00 |
$230.00 |
$220.00 |
$203.00 |
$230.00 |
| 19 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 653 | TON |
$40.00 |
$46.00 |
$70.00 |
$66.00 |
$51.75 |
$80.00 |
| 20 | 609(B) 0380 |
COMBINED CURB & GUTTER (4" MOUNTABLE) | 128 | LF |
$30.00 |
$25.90 |
$40.00 |
$30.80 |
$28.40 |
$45.00 |
| 21 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 74 | SY |
$40.00 |
$103.50 |
$95.00 |
$52.80 |
$48.70 |
$65.00 |
| 22 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$4,000.00 |
$1,818.00 |
$1,500.00 |
$2,750.00 |
$5,075.00 |
$2,400.00 |
| 23 | 611(G) 5705 |
INLET CDI RCP DES. 2 | 2 | EA |
$4,000.00 |
$2,222.00 |
$2,000.00 |
$3,135.00 |
$3,349.00 |
$1,600.00 |
| 24 | 611(G) 5707 |
INLET CDI RCP DES. 4 | 1 | EA |
$5,500.00 |
$3,232.00 |
$3,200.00 |
$1,815.00 |
$3,654.00 |
$7,500.00 |
| 25 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 233 | LF |
$75.00 |
$42.40 |
$63.00 |
$85.80 |
$51.75 |
$48.00 |
| 26 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 46 | LF |
$110.00 |
$60.60 |
$75.00 |
$104.50 |
$79.15 |
$65.00 |
| 27 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 141 | LF |
$125.00 |
$80.80 |
$83.00 |
$140.80 |
$99.45 |
$72.00 |
| 28 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 205 | LF |
$150.00 |
$101.00 |
$96.00 |
$203.50 |
$140.00 |
$92.00 |
| 29 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 537 | LF |
$32.50 |
$19.20 |
$48.00 |
$44.00 |
$22.35 |
$47.00 |
| 30 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 493 | LF |
$40.00 |
$25.30 |
$55.00 |
$51.15 |
$25.70 |
$51.00 |
| 31 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 202 | LF |
$40.00 |
$19.20 |
$49.00 |
$39.60 |
$22.35 |
$47.00 |
| 32 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 347 | LF |
$45.00 |
$25.30 |
$55.00 |
$49.50 |
$22.35 |
$51.00 |
| 33 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 5 | EA |
$950.00 |
$1,010.00 |
$850.00 |
$1,210.00 |
$986.50 |
$1,425.00 |
| 34 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,111.00 |
$1,000.00 |
$1,518.00 |
$1,397.00 |
$1,625.00 |
| 35 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$1,350.00 |
$1,414.00 |
$1,500.00 |
$1,760.00 |
$1,735.65 |
$2,000.00 |
| 36 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,600.00 |
$1,818.00 |
$1,600.00 |
$2,365.00 |
$2,101.00 |
$2,250.00 |
| 37 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 20 | EA |
$1,000.00 |
$931.00 |
$1,400.00 |
$1,000.00 |
$924.00 |
$1,325.00 |
| 38 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 26 | EA |
$1,500.00 |
$1,190.00 |
$1,500.00 |
$1,320.00 |
$1,218.00 |
$1,400.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$12,120.00 |
$13,500.00 |
$23,320.00 |
$6,800.00 |
$10,000.00 |
| 40 | 619(B) 4725 |
REMOVAL OF FENCE | 31,063 | LF |
$1.25 |
$0.5000 |
$1.00 |
$1.65 |
$1.55 |
$1.00 |
| 41 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 5,015 | SY |
$4.50 |
$4.85 |
$4.00 |
$3.85 |
$2.90 |
$5.00 |
| 42 | 619(C) 0924 |
SAWING PAVEMENT | 435 | LF |
$3.00 |
$4.90 |
$4.00 |
$2.00 |
$7.15 |
$5.00 |
| 43 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 525 | LF |
$20.00 |
$15.40 |
$18.00 |
$16.72 |
$15.45 |
$17.00 |
| 44 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,500.00 |
$1,885.00 |
$2,100.00 |
$2,053.15 |
$1,894.50 |
$2,000.00 |
| 45 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 26,951 | LF |
$4.50 |
$3.90 |
$7.65 |
$4.24 |
$3.90 |
$4.00 |
| 46 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 4,112 | LF |
$6.00 |
$5.30 |
$12.50 |
$5.78 |
$4.05 |
$5.50 |
| 47 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 2 | EA |
$250.00 |
$126.50 |
$300.00 |
$150.00 |
$101.50 |
$700.00 |
| 48 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$100.00 |
$25.30 |
$55.00 |
$27.50 |
$25.40 |
$35.00 |
| 49 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 105 | SF |
$25.00 |
$30.30 |
$16.00 |
$33.00 |
$30.45 |
$40.00 |
| 50 | 851(C) 8324 |
2" SQUARE TUBE POST | 265 | LF |
$8.50 |
$10.10 |
$9.00 |
$11.00 |
$10.15 |
$14.00 |
| 51 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 61,311 | LF |
$0.4000 |
$0.3800 |
$0.4200 |
$0.4200 |
$0.4000 |
$0.4500 |
| 52 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 110 | LF |
$0.6000 |
$0.4500 |
$2.25 |
$0.5000 |
$0.4500 |
$0.5000 |
| 53 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 12 | LF |
$5.00 |
$15.20 |
$28.00 |
$16.50 |
$15.20 |
$17.00 |
| 54 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$7,322.00 |
$13,000.00 |
$11,440.00 |
$10,556.00 |
$18,000.00 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$97,060.00 |
$25,000.00 |
$66,550.00 |
$61,407.00 |
$35,000.00 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,535.00 |
$5,000.00 |
$4,000.00 |
$5,582.00 |
$25,000.00 |
| 57 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$225,000.00 |
$104,560.76 |
$170,000.00 |
$234,100.00 |
$243,600.00 |
$130,000.00 |