| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$33,603.94 |
$40,280.00 |
$300,000.00 |
$150,000.00 |
$100,859.99 |
$101,000.00 |
$475,000.00 |
$348,425.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 150,319 | CY |
$10.00 |
$8.50 |
$6.03 |
$9.25 |
$7.00 |
$6.55 |
$21.00 |
$12.95 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 7,243 | CY |
$14.00 |
$11.65 |
$0.2500 |
$1.50 |
$2.25 |
$2.25 |
$25.00 |
$16.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$35,762.00 |
$53,000.00 |
$372,626.35 |
$165,000.00 |
$300,000.00 |
$368,500.00 |
$425,000.00 |
$393,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,780 | LF |
$4.00 |
$2.40 |
$3.49 |
$2.50 |
$3.50 |
$3.80 |
$2.30 |
$4.70 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,288 | LF |
$13.00 |
$13.25 |
$13.96 |
$14.00 |
$16.00 |
$15.10 |
$13.00 |
$14.70 |
| 70 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 403 | CY |
$135.00 |
$212.00 |
$103.66 |
$155.00 |
$165.00 |
$330.50 |
$175.00 |
$137.50 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 542,550 | SY |
$2.00 |
$2.10 |
$2.20 |
$2.25 |
$2.50 |
$3.25 |
$2.00 |
$2.35 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 115.02 | AC |
$1,200.00 |
$900.00 |
$948.14 |
$925.00 |
$950.00 |
$1,620.00 |
$850.00 |
$927.00 |
| 100 | 241 3100 |
MOWING | 230.04 | AC |
$225.00 |
$238.50 |
$251.27 |
$250.00 |
$250.00 |
$216.00 |
$230.00 |
$247.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 18,883 | CY |
$75.00 |
$84.80 |
$68.75 |
$80.00 |
$95.00 |
$84.60 |
$75.00 |
$85.29 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 104,778 | SY |
$7.00 |
$7.20 |
$6.05 |
$6.00 |
$7.00 |
$7.10 |
$10.00 |
$9.19 |
| 130 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 119,748 | SY |
$4.00 |
$5.40 |
$3.52 |
$4.25 |
$3.80 |
$4.25 |
$4.00 |
$5.75 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 20,074 | TON |
$40.00 |
$36.55 |
$37.12 |
$38.00 |
$45.00 |
$44.10 |
$40.00 |
$47.50 |
| 150 | 407(B)7300 |
TACK COAT | 23,462 | GAL |
$3.50 |
$5.30 |
$4.47 |
$3.00 |
$4.00 |
$4.00 |
$4.00 |
$3.27 |
| 160 | 408 8100 |
PRIME COAT | 63,105 | GAL |
$4.00 |
$5.10 |
$0.2500 |
$2.00 |
$4.00 |
$1.00 |
$1.00 |
$4.00 |
| 170 | 409(A)9200 |
FABRIC REINFORCEMENT | 23,230 | SY |
$4.00 |
$8.55 |
$1.12 |
$1.55 |
$1.55 |
$3.55 |
$1.00 |
$3.87 |
| 175 | 409(B)9300 |
BITUMINOUS BINDER | 5,817 | GAL |
$5.00 |
$8.30 |
$3.35 |
$6.75 |
$5.00 |
$6.25 |
$3.00 |
$6.55 |
| 180 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 13,119 | TON |
$120.00 |
$95.60 |
$126.47 |
$110.00 |
$121.00 |
$111.00 |
$92.00 |
$110.55 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 43,112 | TON |
$115.00 |
$92.65 |
$104.98 |
$95.00 |
$115.00 |
$105.75 |
$86.00 |
$121.60 |
| 200 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 8,746 | TON |
$125.00 |
$114.70 |
$144.62 |
$120.00 |
$135.00 |
$124.50 |
$107.00 |
$127.76 |
| 210 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,860 | TON |
$115.00 |
$103.64 |
$137.36 |
$107.00 |
$120.00 |
$126.50 |
$101.00 |
$131.76 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 73,466 | SY |
$3.00 |
$6.25 |
$2.51 |
$1.25 |
$1.80 |
$2.40 |
$3.50 |
$4.26 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 259 | CY |
$30.00 |
$47.70 |
$35.20 |
$21.00 |
$50.00 |
$49.80 |
$60.00 |
$25.00 |
| 240 | 509(A)0200 |
CLASS AA CONCRETE | 1,079 | CY |
$650.00 |
$633.40 |
$824.42 |
$825.00 |
$593.00 |
$592.00 |
$770.00 |
$700.20 |
| 250 | 509(D)0500 |
CLASS C CONCRETE | 4,057 | CY |
$500.00 |
$365.70 |
$333.02 |
$420.00 |
$382.00 |
$381.50 |
$550.00 |
$395.00 |
| 260 | 511(A)2200 |
REINFORCING STEEL | 152,110 | LB |
$1.25 |
$1.30 |
$1.44 |
$1.05 |
$1.25 |
$1.35 |
$1.00 |
$1.44 |
| 270 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 88 | TON |
$60.00 |
$103.90 |
$59.34 |
$125.00 |
$100.00 |
$88.10 |
$100.00 |
$83.00 |
| 280 | 609(B)4370 |
2'-8" COMB.CRB.& GUT.(6" MNTBLE) | 3,643 | LF |
$35.00 |
$31.80 |
$32.60 |
$31.00 |
$24.00 |
$33.20 |
$33.00 |
$49.50 |
| 290 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 619 | SY |
$90.00 |
$72.05 |
$93.33 |
$86.00 |
$70.00 |
$75.20 |
$115.00 |
$87.07 |
| 300 | 611(G)0350 |
INLET (SMD-TYPE 1) | 1 | EA |
$6,000.00 |
$5,830.00 |
$3,699.15 |
$5,000.00 |
$6,100.00 |
$6,059.00 |
$4,106.20 |
$9,529.38 |
| 310 | 611(G)8004 |
INLET CDI RCB DES. 2 | 4 | EA |
$5,500.00 |
$5,618.00 |
$3,819.67 |
$5,200.00 |
$5,800.00 |
$5,839.00 |
$5,500.00 |
$7,971.00 |
| 320 | 611(G)9004 |
INLET CDI RCP DES. 2 | 1 | EA |
$4,500.00 |
$5,088.00 |
$3,819.67 |
$5,800.00 |
$5,300.00 |
$5,288.00 |
$6,000.00 |
$8,750.00 |
| 330 | 611(H)0524 |
ADD'L DEPTH IN INLET CDI RCB DES. 2 | 9.94 | VF |
$600.00 |
$848.00 |
$415.00 |
$1,000.00 |
$900.00 |
$881.50 |
$500.00 |
$590.00 |
| 340 | 611(H)0684 |
ADD'L DEPTH IN INLET CDI RCP DES. 2 | 2 | VF |
$400.00 |
$932.80 |
$415.00 |
$1,000.00 |
$900.00 |
$881.50 |
$500.00 |
$675.00 |
| 350 | 613(A)5216 |
24" R.C.PIPE CLASS III | 414 | LF |
$100.00 |
$93.25 |
$100.46 |
$60.00 |
$60.00 |
$59.50 |
$140.00 |
$98.20 |
| 360 | 613(A)5220 |
30" R.C.PIPE CLASS III | 104 | LF |
$120.00 |
$106.00 |
$160.17 |
$80.00 |
$68.00 |
$67.20 |
$160.00 |
$121.13 |
| 370 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 228 | LF |
$150.00 |
$121.90 |
$137.69 |
$90.00 |
$84.00 |
$82.60 |
$165.00 |
$140.00 |
| 380 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 1,596 | LF |
$60.00 |
$55.10 |
$68.10 |
$65.00 |
$39.00 |
$38.60 |
$80.00 |
$48.16 |
| 390 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 1,232 | LF |
$60.00 |
$58.30 |
$72.62 |
$87.00 |
$49.00 |
$48.50 |
$85.00 |
$56.00 |
| 400 | 613(B)5560 |
84" CORR. GALV. STEEL PIPE | 70 | LF |
$200.00 |
$222.60 |
$488.63 |
$250.00 |
$250.00 |
$237.00 |
$330.00 |
$325.00 |
| 410 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 78 | LF |
$80.00 |
$74.20 |
$64.37 |
$115.00 |
$45.00 |
$44.10 |
$100.00 |
$56.00 |
| 420 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 90 | LF |
$70.00 |
$95.40 |
$76.48 |
$117.00 |
$50.00 |
$49.60 |
$110.00 |
$67.00 |
| 430 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,898 | LF |
$30.00 |
$26.50 |
$54.25 |
$25.00 |
$23.00 |
$22.00 |
$15.00 |
$34.00 |
| 440 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 625 | LF |
$30.00 |
$29.70 |
$34.18 |
$28.00 |
$23.00 |
$22.00 |
$15.00 |
$28.00 |
| 450 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 3,643 | LF |
$13.00 |
$12.70 |
$10.54 |
$13.00 |
$14.00 |
$33.10 |
$15.00 |
$18.00 |
| 460 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 209 | LF |
$13.00 |
$12.70 |
$36.46 |
$13.00 |
$18.00 |
$33.10 |
$15.00 |
$14.00 |
| 470 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,622.50 |
$1,908.00 |
$1,705.20 |
$1,900.00 |
$1,900.00 |
$1,873.00 |
$2,200.00 |
$2,500.00 |
| 480 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,800.00 |
$1,696.00 |
$1,699.91 |
$1,800.00 |
$1,800.00 |
$1,826.00 |
$2,600.00 |
$2,400.00 |
| 490 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 64 | EA |
$2,100.00 |
$1,908.00 |
$1,373.89 |
$2,000.00 |
$1,900.00 |
$1,992.00 |
$3,000.00 |
$2,600.00 |
| 500 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 6 | EA |
$2,000.00 |
$2,120.00 |
$2,463.50 |
$2,300.00 |
$2,300.00 |
$2,323.00 |
$3,500.00 |
$2,950.00 |
| 510 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 23 | EA |
$650.00 |
$1,060.00 |
$533.39 |
$1,200.00 |
$500.00 |
$1,322.00 |
$1,300.00 |
$546.00 |
| 520 | 613(T)7800 |
STANDARD BEDDING MATERIAL, CLASS C | 523 | CY |
$60.00 |
$59.35 |
$65.20 |
$26.00 |
$61.00 |
$60.60 |
$80.00 |
$84.00 |
| 530 | 613(U)7950 |
PIPE UNDERDRAIN COVER MAT'L. | 214 | CY |
$100.00 |
$152.65 |
$66.41 |
$70.00 |
$64.00 |
$69.40 |
$80.00 |
$84.00 |
| 540 | 613(V)8000 |
TRENCH EXCAVATION | 816 | CY |
$25.00 |
$31.80 |
$7.56 |
$26.00 |
$13.00 |
$13.20 |
$35.00 |
$19.00 |
| 550 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,050.00 |
$64,660.00 |
$45,257.36 |
$110,000.00 |
$100,000.00 |
$99,500.00 |
$235,000.00 |
$81,000.00 |
| 560 | 619(B)6300 |
REMOVAL OF HEADWALL | 6 | EA |
$1,200.00 |
$1,272.00 |
$965.02 |
$1,000.00 |
$1,900.00 |
$1,992.00 |
$1,500.00 |
$970.00 |
| 570 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 8,296 | SY |
$10.00 |
$10.60 |
$7.82 |
$5.50 |
$6.50 |
$11.60 |
$9.00 |
$9.25 |
| 580 | 619(C)6600 |
SAWING PAVEMENT | 57,850 | LF |
$2.00 |
$2.10 |
$1.68 |
$2.25 |
$1.90 |
$5.50 |
$2.00 |
$3.70 |
| 590 | 624(A)3200 |
FENCE-STYLE WWF | 196 | LF |
$12.00 |
$10.60 |
$11.17 |
$11.25 |
$11.00 |
$11.00 |
$11.00 |
$14.40 |
| 600 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 8,677 | LF |
$7.00 |
$6.40 |
$6.76 |
$6.75 |
$6.70 |
$6.65 |
$7.00 |
$9.75 |
| 610 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 11,613 | LF |
$9.00 |
$6.65 |
$6.76 |
$6.75 |
$6.70 |
$6.65 |
$7.50 |
$10.15 |
| 620 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 14,504 | LF |
$9.00 |
$6.40 |
$6.76 |
$6.75 |
$6.70 |
$6.65 |
$8.00 |
$11.00 |
| 630 | 624(E)3600 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 211 | LF |
$55.00 |
$27.55 |
$29.03 |
$28.00 |
$29.00 |
$28.60 |
$35.00 |
$28.50 |
| 640 | 624(E)3610 |
FENCE-STYLE CLF (5'HIGH, CLASS A) | 252 | LF |
$65.00 |
$30.00 |
$31.27 |
$30.00 |
$31.00 |
$30.90 |
$40.00 |
$32.00 |
| 650 | 624(F)3745 |
GATES-STYLE CLF (5'HIGH X 16'LONG) | 1 | EA |
$2,000.00 |
$1,696.00 |
$1,786.85 |
$1,800.00 |
$1,800.00 |
$1,763.00 |
$2,200.00 |
$2,850.00 |
| 660 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 9 | EA |
$200.00 |
$238.50 |
$264.80 |
$110.00 |
$111.00 |
$243.00 |
$110.00 |
$125.00 |
| 670 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$100.00 |
$90.10 |
$100.04 |
$82.00 |
$83.00 |
$91.80 |
$80.00 |
$98.00 |
| 680 | 629(E)7600 |
MAILBOX | 9 | EA |
$100.00 |
$42.40 |
$47.07 |
$220.00 |
$222.00 |
$43.20 |
$300.00 |
$245.00 |
| 690 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 4,290 | CY |
$10.00 |
$9.55 |
$7.33 |
$8.50 |
$21.00 |
$6.55 |
$55.00 |
$16.00 |
| 700 | 303(A)1200 |
AGGREGATE BASE TYPE A | 559 | CY |
$60.00 |
$82.68 |
$82.29 |
$88.00 |
$89.00 |
$88.50 |
$95.00 |
$84.00 |
| 710 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 264 | CY |
$30.00 |
$47.70 |
$29.33 |
$48.00 |
$50.00 |
$49.80 |
$45.00 |
$28.00 |
| 720 | 509(A)0210 |
CLASS AA CONCRETE | 688.6 | CY |
$550.00 |
$671.00 |
$637.24 |
$655.00 |
$590.00 |
$592.00 |
$935.00 |
$675.00 |
| 730 | 511(A)2210 |
REINFORCING STEEL | 115,800 | LB |
$1.20 |
$1.30 |
$1.44 |
$1.30 |
$1.30 |
$1.35 |
$1.25 |
$1.47 |
| 740 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$31,800.00 |
$18,773.27 |
$34,000.00 |
$30,000.00 |
$47,500.00 |
$191,427.00 |
$42,500.00 |
| 750 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 27,340 | LF |
$0.3500 |
$0.4000 |
$0.4400 |
$0.3000 |
$0.3500 |
$0.4000 |
$0.3000 |
$0.3200 |
| 760 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 4,148 | EA |
$1.00 |
$0.8000 |
$0.7600 |
$1.25 |
$1.00 |
$0.7000 |
$1.00 |
$1.08 |
| 770 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 13,360 | LF |
$0.4000 |
$0.5000 |
$0.5800 |
$0.2500 |
$0.2500 |
$0.5300 |
$0.2500 |
$0.2400 |
| 780 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 2,400 | EA |
$3.00 |
$6.10 |
$6.77 |
$6.50 |
$6.65 |
$6.20 |
$6.00 |
$6.67 |
| 790 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 2,400 | EA |
$8.30 |
$6.10 |
$6.77 |
$6.50 |
$6.65 |
$6.20 |
$6.00 |
$6.60 |
| 800 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 2,720 | SD |
$18.25 |
$8.50 |
$9.41 |
$5.50 |
$5.50 |
$8.65 |
$6.00 |
$5.45 |
| 810 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 420 | SD |
$32.00 |
$8.50 |
$9.41 |
$11.00 |
$11.00 |
$8.65 |
$15.00 |
$10.90 |
| 820 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,625 | LF |
$27.00 |
$24.40 |
$27.07 |
$17.00 |
$30.00 |
$24.80 |
$33.00 |
$27.00 |
| 830 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 3,237.5 | LF |
$4.00 |
$3.70 |
$4.12 |
$14.00 |
$3.00 |
$3.80 |
$7.00 |
$9.00 |
| 840 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,800 | SD |
$0.6000 |
$5.85 |
$6.47 |
$1.05 |
$2.50 |
$5.95 |
$1.00 |
$1.12 |
| 850 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 15,600 | SD |
$1.00 |
$0.5500 |
$0.5900 |
$0.8000 |
$0.8000 |
$0.5500 |
$1.00 |
$0.8400 |
| 860 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 15,720 | SD |
$1.80 |
$0.0200 |
$0.0200 |
$0.2500 |
$0.2500 |
$0.0500 |
$0.5000 |
$0.2700 |
| 870 | 880(B)6340 |
VARIABLE SPEED LIMIT SIGN | 72 | SD |
$27.00 |
$25.45 |
$28.24 |
$110.00 |
$110.00 |
$25.90 |
$110.00 |
$115.00 |
| 880 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,840 | SD |
$1.50 |
$9.50 |
$10.59 |
$2.75 |
$4.00 |
$9.70 |
$3.00 |
$2.67 |
| 890 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 33,360 | SD |
$0.6500 |
$0.0200 |
$0.0200 |
$0.2500 |
$0.3000 |
$0.0500 |
$0.3000 |
$0.2800 |
| 900 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 99,840 | SD |
$0.2500 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.0400 |
$0.0500 |
$0.0500 |
$0.0600 |
| 910 | 880(F)6700 |
DRUMS | 39,720 | SD |
$0.3500 |
$0.0200 |
$0.0200 |
$0.1500 |
$0.2000 |
$0.0500 |
$0.2000 |
$0.1700 |
| 920 | 880(G)6805 |
CHANNELIZER CONES | 73,200 | SD |
$0.5500 |
$0.0200 |
$0.0200 |
$0.5500 |
$0.6000 |
$0.0500 |
$0.5500 |
$0.5400 |
| 930 | 880(I)7000 |
FLAGGER | 840 | SD |
$160.00 |
$134.40 |
$257.56 |
$550.00 |
$425.00 |
$1,000.00 |
$200.00 |
$540.00 |
| 940 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,982 | SD |
$18.00 |
$8.50 |
$9.41 |
$11.00 |
$11.00 |
$8.65 |
$15.00 |
$11.00 |
| 950 | 413(F)4700 |
SINUSOIDAL RUMBLE STRIP | 79,170 | LF |
$0.4500 |
$0.3000 |
$0.3300 |
$0.2500 |
$0.3000 |
$0.3000 |
$0.4000 |
$0.4600 |
| 960 | 804(A)2200 |
STRUCTURAL CONCRETE | 1.72 | CY |
$1,210.00 |
$530.00 |
$588.47 |
$700.00 |
$720.00 |
$540.00 |
$700.00 |
$790.00 |
| 970 | 804(B)2300 |
REINFORCING STEEL | 224 | LB |
$3.30 |
$2.65 |
$2.94 |
$2.75 |
$2.75 |
$2.70 |
$3.00 |
$2.90 |
| 980 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 50 | EA |
$155.00 |
$132.50 |
$147.11 |
$80.00 |
$80.00 |
$135.00 |
$80.00 |
$80.00 |
| 990 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$405.00 |
$265.00 |
$294.22 |
$1,350.00 |
$1,200.00 |
$270.00 |
$1,500.00 |
$1,400.00 |
| 1,000 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 509.17 | SF |
$35.00 |
$44.52 |
$49.43 |
$30.00 |
$31.00 |
$45.40 |
$30.00 |
$30.00 |
| 1,010 | 851(B)2310 |
2 1/2"@5.79 GALV.STL.PIPE POST | 70 | LF |
$33.00 |
$21.20 |
$23.54 |
$26.00 |
$26.00 |
$21.60 |
$25.00 |
$26.70 |
| 1,020 | 851(B)2315 |
3"@7.58 GALV.STL.PIPE POST | 48 | LF |
$35.00 |
$27.55 |
$30.60 |
$27.00 |
$27.00 |
$28.10 |
$30.00 |
$27.00 |
| 1,030 | 851(C)2415 |
2" SQUARE TUBE POST | 395 | LF |
$13.00 |
$7.40 |
$8.24 |
$12.00 |
$12.00 |
$7.55 |
$12.00 |
$12.10 |
| 1,040 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 388.5 | LF |
$14.30 |
$8.50 |
$9.41 |
$13.00 |
$13.00 |
$8.65 |
$13.00 |
$13.40 |
| 1,050 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 68 | EA |
$40.00 |
$27.55 |
$30.60 |
$80.00 |
$83.00 |
$28.10 |
$85.00 |
$84.00 |
| 1,060 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 107,725 | LF |
$1.20 |
$0.9500 |
$0.8000 |
$0.8000 |
$0.7500 |
$0.7300 |
$0.8000 |
$0.9700 |
| 1,070 | 856(A)8211 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(8" WIDE) | 1,120 | LF |
$1.40 |
$1.00 |
$1.12 |
$2.25 |
$2.00 |
$1.05 |
$3.00 |
$2.17 |
| 1,080 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 2,955 | LF |
$1.60 |
$3.00 |
$3.35 |
$2.75 |
$2.50 |
$3.10 |
$4.00 |
$2.70 |
| 1,090 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 216 | LF |
$7.40 |
$3.55 |
$3.94 |
$13.00 |
$12.00 |
$3.60 |
$15.00 |
$13.40 |
| 1,100 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 27 | EA |
$260.00 |
$424.00 |
$470.78 |
$170.00 |
$155.00 |
$432.00 |
$200.00 |
$170.00 |
| 1,110 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$324,500.00 |
$145,220.00 |
$97,329.31 |
$335,000.00 |
$150,000.00 |
$185,001.34 |
$195,000.00 |
$79,800.00 |
| 1,120 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,196.43 |
$23,650.00 |
$4,467.11 |
$90,000.00 |
$30,000.00 |
$8,500.00 |
$35,000.00 |
$7,900.00 |
| 1,130 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$10,400.00 |
$26,875.00 |
$41,710.49 |
$107,000.00 |
$25,000.00 |
$10,000.00 |
$22,000.00 |
$26,500.00 |
| 1,140 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$884,500.00 |
$990,000.00 |
$965,929.51 |
|
$968,369.74 |
|
|
$997,000.00 |