| 10 | 303(G)1510 |
AGGREGATE BASE TYPE D | 360 | CY |
$65.22 |
$155.00 |
$109.00 |
$300.00 |
| 20 | 407(B)7300 |
TACK COAT | 80,100 | GAL |
$3.98 |
$3.00 |
$3.25 |
$3.65 |
| 30 | 411(B)1310 |
(SP) SUPERPAVE, TYPE S3(PG 76-28 E) | 59,810 | TON |
$120.00 |
$108.00 |
$117.00 |
$152.00 |
| 40 | 411(F)1700 |
STONE MATRIX ASPHALT | 39,880 | TON |
$152.31 |
$131.00 |
$174.00 |
$180.00 |
| 50 | 411(J)2100 |
(SP) RICH INTERMEDIATE LAYER | 39,880 | TON |
$134.76 |
$128.50 |
$135.50 |
$170.00 |
| 60 | 412 3100 |
COLD MILLING PAVEMENT | 356,000 | SY |
$2.94 |
$6.25 |
$7.25 |
$5.25 |
| 70 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 220 | LF |
$22.14 |
$41.50 |
$100.00 |
$120.00 |
| 80 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 11 | EA |
$833.41 |
$935.00 |
$3,000.00 |
$2,200.00 |
| 90 | 613(V)8000 |
TRENCH EXCAVATION | 360 | CY |
$25.38 |
$23.00 |
$75.00 |
$55.00 |
| 100 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 164,748 | LF |
$0.3100 |
$0.2000 |
$0.6500 |
$0.2500 |
| 110 | 853 5145 |
DELINEATORS(TYPE 2, CODE 1, FLEXIBLE) | 112 | EA |
$77.97 |
$72.20 |
$70.80 |
$80.00 |
| 120 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 193,500 | LF |
$0.8700 |
$0.7500 |
$0.7000 |
$0.8000 |
| 130 | 856(A)8211 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(8" WIDE) | 5,500 | LF |
$1.55 |
$0.8500 |
$0.8000 |
$0.9000 |
| 140 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 4,200 | LF |
$1.63 |
$3.30 |
$3.25 |
$3.50 |
| 150 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 100 | LF |
$16.36 |
$4.10 |
$4.00 |
$4.25 |
| 160 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 150,000 | LF |
$0.2600 |
$0.5500 |
$0.4000 |
$0.4000 |
| 170 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 10,000 | EA |
$0.8800 |
$0.6500 |
$1.00 |
$1.10 |
| 180 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 19,100 | LF |
$0.1900 |
$0.1000 |
$0.4000 |
$0.4000 |
| 190 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 500 | SD |
$16.51 |
$8.15 |
$24.00 |
$9.00 |
| 200 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 10,560 | LF |
$28.68 |
$10.20 |
$10.00 |
$12.00 |
| 210 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 168,960 | LF |
$4.32 |
$1.35 |
$1.30 |
$1.35 |
| 220 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 500 | SD |
$8.76 |
$0.8000 |
$0.7500 |
$0.9000 |
| 230 | 880(J)7100 |
(SP) CONSTRUCTION TRAFFIC CONTROL | 195 | SD |
$488.00 |
$571.50 |
$1,050.00 |
$625.00 |
| 240 | 880(K)7200 |
SURVEILLANCE TRAFFIC CONTROL | 200 | SD |
$737.36 |
$918.50 |
$900.00 |
$975.00 |
| 250 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 3,900 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 260 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 950 | SD |
$17.24 |
$10.25 |
$15.00 |
$11.00 |
| 270 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$10,350.00 |
$273,050.00 |
$10,000.00 |
| 280 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$949,800.00 |
$866,036.00 |
|
|