| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$13,000.00 |
$31,698.53 |
$40,000.00 |
$33,500.00 |
$20,000.00 |
$5,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 8,431 | CY |
$13.00 |
$12.00 |
$11.83 |
$20.00 |
$12.50 |
$20.00 |
$25.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 3,231 | CY |
$16.50 |
$12.00 |
$16.67 |
$25.00 |
$17.50 |
$35.00 |
$60.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$13,000.00 |
$51,879.44 |
$33,000.00 |
$54,650.00 |
$80,000.00 |
$32,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,856 | LF |
$4.00 |
$6.00 |
$3.86 |
$2.25 |
$5.25 |
$5.00 |
$3.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 182 | LF |
$16.00 |
$8.00 |
$17.24 |
$11.00 |
$7.35 |
$7.00 |
$17.00 |
| 70 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 36.15 | CY |
$215.00 |
$179.00 |
$412.09 |
$270.00 |
$435.00 |
$100.00 |
$235.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 38,890 | SY |
$3.70 |
$4.50 |
$4.24 |
$3.35 |
$4.20 |
$4.00 |
$3.30 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 8.03 | AC |
$1,500.00 |
$7,500.00 |
$1,731.34 |
$1,800.00 |
$6,500.00 |
$6,550.00 |
$2,800.00 |
| 100 | 233(E)0600 |
(SP) HYDROMULCH | 38,888 | SY |
$2.20 |
$1.50 |
$0.9300 |
$1.00 |
$1.40 |
$1.50 |
$2.00 |
| 110 | 241 3100 |
MOWING | 16.07 | AC |
$345.00 |
$900.00 |
$214.01 |
$450.00 |
$840.00 |
$800.00 |
$400.00 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 10,625 | SY |
$10.50 |
$6.00 |
$10.44 |
$9.00 |
$16.10 |
$18.00 |
$12.00 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 367 | TON |
$50.00 |
$56.00 |
$89.05 |
$56.00 |
$95.00 |
$100.00 |
$120.00 |
| 140 | 407(B)7300 |
TACK COAT | 1,537 | GAL |
$4.50 |
$3.00 |
$3.18 |
$3.50 |
$3.05 |
$10.00 |
$4.00 |
| 150 | 408 8100 |
PRIME COAT | 3,719 | GAL |
$5.00 |
$5.00 |
$10.28 |
$3.50 |
$0.1000 |
$10.00 |
$6.00 |
| 160 | 409(A)9200 |
FABRIC REINFORCEMENT | 1,721 | SY |
$5.00 |
$3.00 |
$7.68 |
$4.25 |
$7.25 |
$6.00 |
$4.00 |
| 170 | 409(B)9300 |
BITUMINOUS BINDER | 688.4 | GAL |
$7.50 |
$6.00 |
$7.94 |
$16.00 |
$7.50 |
$6.00 |
$6.00 |
| 180 | 411(L)2404 |
BMD, TYPE B3 (PG 64-22 OK) | 2,512 | TON |
$110.00 |
$126.00 |
$131.84 |
$110.00 |
$124.50 |
$135.00 |
$160.00 |
| 190 | 411(L)2408 |
BMD, TYPE B3 (PG 70-28 OK) | 599 | TON |
$110.00 |
$145.00 |
$167.84 |
$129.00 |
$158.50 |
$150.00 |
$190.00 |
| 200 | 411(L)2424 |
BMD, TYPE B4 (PG 64-22 OK) | 615 | TON |
$143.00 |
$140.00 |
$159.90 |
$154.00 |
$151.00 |
$150.00 |
$200.00 |
| 210 | 411(L)2428 |
BMD, TYPE B4 (PG 70-28 OK) | 977 | TON |
$120.00 |
$140.00 |
$138.19 |
$144.00 |
$130.50 |
$150.00 |
$190.00 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 5,160 | SY |
$7.00 |
$8.00 |
$9.26 |
$2.60 |
$6.85 |
$5.00 |
$6.00 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 35 | CY |
$41.00 |
$65.00 |
$65.57 |
$63.00 |
$70.00 |
$100.00 |
$115.00 |
| 240 | 509(A)0200 |
CLASS AA CONCRETE | 27 | CY |
$940.00 |
$1,000.00 |
$1,002.14 |
$1,600.00 |
$1,055.00 |
$1,500.00 |
$1,100.00 |
| 250 | 511(A)2200 |
REINFORCING STEEL | 4,072 | LB |
$2.00 |
$2.00 |
$2.29 |
$2.30 |
$2.40 |
$2.00 |
$4.00 |
| 260 | 602(B)2310 |
REVETMENT MATTRESSES | 1,278 | SY |
$60.00 |
$55.00 |
$73.31 |
$66.00 |
$77.20 |
$75.00 |
$55.00 |
| 270 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,450.00 |
$13,000.00 |
$11,350.70 |
$22,000.00 |
$11,945.00 |
$10,000.00 |
$10,000.00 |
| 280 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 324 | SY |
$18.00 |
$10.00 |
$16.14 |
$20.00 |
$17.00 |
$20.00 |
$27.00 |
| 290 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 5,484 | SY |
$8.00 |
$8.00 |
$6.22 |
$4.50 |
$6.55 |
$10.00 |
$11.00 |
| 300 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,510 | LF |
$6.80 |
$3.00 |
$3.32 |
$3.25 |
$4.00 |
$2.75 |
$5.00 |
| 310 | 619(B)6436 |
REMOVAL OF CONCRETE DITCH LINER | 883 | LF |
$12.00 |
$10.00 |
$8.72 |
$12.00 |
$9.20 |
$10.00 |
$21.00 |
| 320 | 619(C)6600 |
SAWING PAVEMENT | 3,870 | LF |
$5.00 |
$4.00 |
$2.24 |
$3.00 |
$2.35 |
$3.00 |
$4.00 |
| 330 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 563 | LF |
$14.00 |
$25.00 |
$8.26 |
$9.00 |
$8.20 |
$15.00 |
$16.00 |
| 340 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 2,690 | LF |
$1.00 |
$1.00 |
$0.7900 |
$0.8500 |
$0.5500 |
$0.7500 |
$0.6000 |
| 350 | 413(B)4300 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 3 | EAGP |
$1,910.00 |
$900.00 |
$794.19 |
$850.00 |
$2,625.00 |
$750.00 |
$2,800.00 |
| 360 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 3,694 | LF |
$1.60 |
$1.00 |
$0.7900 |
$0.8500 |
$0.3500 |
$0.7500 |
$0.5000 |
| 370 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 9 | EA |
$145.00 |
$80.00 |
$79.42 |
$86.00 |
$210.00 |
$75.00 |
$225.00 |
| 380 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$450.00 |
$375.00 |
$370.62 |
$400.00 |
$315.00 |
$350.00 |
$335.00 |
| 390 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 133.19 | SF |
$39.00 |
$20.00 |
$19.06 |
$21.00 |
$68.50 |
$18.00 |
$73.00 |
| 410 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 140 | LF |
$15.00 |
$6.00 |
$5.29 |
$5.75 |
$8.50 |
$5.00 |
$9.00 |
| 420 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 13,586 | LF |
$1.50 |
$1.00 |
$0.8500 |
$0.9000 |
$0.6500 |
$0.8000 |
$0.7000 |
| 430 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 440 | LF |
$3.00 |
$3.00 |
$2.65 |
$2.85 |
$1.85 |
$2.50 |
$2.00 |
| 440 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 34 | LF |
$17.00 |
$12.00 |
$10.59 |
$11.40 |
$12.80 |
$10.00 |
$14.00 |
| 450 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 12 | EA |
$335.00 |
$250.00 |
$238.26 |
$255.00 |
$315.00 |
$225.00 |
$335.00 |
| 460 | 802(A)0230 |
1 1/2" GALV. STEEL ELECT COND EXPOSED | 10 | LF |
$61.00 |
$65.00 |
$61.42 |
$67.00 |
$61.00 |
$58.00 |
$56.00 |
| 470 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,170 | LF |
$18.50 |
$15.00 |
$13.77 |
$15.00 |
$13.70 |
$13.00 |
$23.00 |
| 480 | 802(B)0356 |
3" PVC SCH. 80 PLASTIC CONDUIT BORED | 350 | LF |
$50.00 |
$40.00 |
$37.06 |
$40.00 |
$36.80 |
$35.00 |
$67.00 |
| 490 | 803(A)1230 |
PULL BOX(SIZE III) | 3 | EA |
$3,000.00 |
$2,100.00 |
$1,863.70 |
$2,000.00 |
$1,850.00 |
$1,760.00 |
$2,800.00 |
| 500 | 811 9130 |
1/C NO.10 ELECT.COND. | 570 | LF |
$3.30 |
$2.00 |
$1.59 |
$1.75 |
$1.60 |
$1.50 |
$6.00 |
| 510 | 824(D)7500 |
(SP)COMMUNICATION CABINET, POLE MOUNTED | 1 | EA |
$40,000.00 |
$31,000.00 |
$29,649.78 |
$40,000.00 |
$29,400.00 |
$28,000.00 |
$40,000.00 |
| 520 | 828 0110 |
(PL)DETECTION SYSTEM (RADAR) | 1 | LSUM |
$250,000.00 |
$55,000.00 |
$52,310.68 |
$65,000.00 |
$51,870.00 |
$49,400.00 |
$52,000.00 |
| 530 | 831 3104 |
1WAY1SEC.ADJ.SIG.HD.S-8 | 8 | EA |
$1,000.00 |
$600.00 |
$593.00 |
$650.00 |
$588.00 |
$560.00 |
$900.00 |
| 540 | 833 5100 |
BACKPLATE | 8 | EA |
$265.00 |
$200.00 |
$185.31 |
$200.00 |
$184.00 |
$175.00 |
$225.00 |
| 550 | 834(A)6205 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 1,220 | LF |
$5.50 |
$4.00 |
$3.18 |
$3.45 |
$3.15 |
$3.00 |
$12.00 |
| 560 | 834(C)6410 |
UNDERGROUND COMMUNICATION CABLE | 1,495 | LF |
$8.00 |
$1.00 |
$1.06 |
$1.15 |
$1.05 |
$1.00 |
$17.00 |
| 570 | 836 7100 |
REGULATORY OR WARNING SIGN ASSEMBLY | 4 | EA |
$10,000.00 |
$4,500.00 |
$3,997.43 |
$4,500.00 |
$3,965.00 |
$3,775.00 |
$14,000.00 |
| 580 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 140 | LF |
$26.00 |
$19.00 |
$16.94 |
$18.00 |
$16.80 |
$16.00 |
$17.00 |
| 590 | 802(B)0356 |
3" PVC SCH. 80 PLASTIC CONDUIT BORED | 170 | LF |
$50.00 |
$40.00 |
$37.06 |
$40.00 |
$36.80 |
$35.00 |
$56.00 |
| 600 | 803(A)1210 |
PULL BOX(SIZE I) | 2 | EA |
$2,000.00 |
$1,500.00 |
$1,376.60 |
$1,500.00 |
$1,365.00 |
$1,300.00 |
$2,800.00 |
| 610 | 803(A)1230 |
PULL BOX(SIZE III) | 2 | EA |
$3,000.00 |
$2,100.00 |
$1,879.59 |
$2,000.00 |
$1,865.00 |
$1,775.00 |
$2,300.00 |
| 620 | 804(A)2200 |
STRUCTURAL CONCRETE | 3.28 | CY |
$837.00 |
$1,700.00 |
$1,556.61 |
$1,700.00 |
$1,545.00 |
$1,470.00 |
$2,500.00 |
| 630 | 804(B)2300 |
REINFORCING STEEL | 568 | LB |
$3.30 |
$3.00 |
$2.54 |
$2.75 |
$2.50 |
$2.40 |
$6.00 |
| 640 | 805(A)3228 |
(PL)REMOVAL OF LIGHT POLE | 1 | EA |
$998.00 |
$700.00 |
$635.35 |
$700.00 |
$630.00 |
$600.00 |
$1,700.00 |
| 650 | 806(C)4512 |
40' MTG & 10' HLMA(G.STL.) | 2 | EA |
$5,770.00 |
$7,500.00 |
$6,671.20 |
$8,000.00 |
$6,615.00 |
$6,300.00 |
$7,000.00 |
| 660 | 807 5120 |
BREAKAWAY BASE (DES. B) | 2 | EA |
$1,180.00 |
$1,400.00 |
$1,291.89 |
$1,400.00 |
$1,280.00 |
$1,220.00 |
$1,400.00 |
| 670 | 809(A)7200 |
ROADWAY LUMINAIRE | 2 | EA |
$1,153.00 |
$1,000.00 |
$953.03 |
$1,100.00 |
$945.00 |
$900.00 |
$660.00 |
| 680 | 810(A)8200 |
SERVICE POLE | 1 | EA |
$7,270.00 |
$8,500.00 |
$8,005.44 |
$11,000.00 |
$7,640.00 |
$7,560.00 |
$4,000.00 |
| 690 | 811 9120 |
1/C NO.6 ELECT.COND. | 915 | LF |
$3.40 |
$4.00 |
$3.18 |
$3.40 |
$3.15 |
$3.00 |
$6.00 |
| 700 | 811 9135 |
1/C NO.12 ELECT.COND. | 220 | LF |
$1.50 |
$2.00 |
$1.91 |
$2.00 |
$1.90 |
$1.80 |
$4.00 |
| 710 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 24,584 | LF |
$0.4000 |
$0.2500 |
$0.2300 |
$0.2500 |
$0.4500 |
$0.2200 |
$0.5000 |
| 720 | 857(F)9740 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 36,674 | LF |
$0.5000 |
$0.2500 |
$0.2100 |
$0.2500 |
$0.3000 |
$0.2000 |
$0.5000 |
| 730 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 265 | EA |
$9.00 |
$4.50 |
$4.24 |
$4.60 |
$10.00 |
$4.00 |
$11.00 |
| 740 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 227 | EA |
$8.00 |
$4.50 |
$4.24 |
$4.60 |
$10.00 |
$4.00 |
$11.00 |
| 750 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 960 | SD |
$16.30 |
$12.00 |
$10.59 |
$11.00 |
$14.70 |
$10.00 |
$16.00 |
| 760 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,091 | LF |
$28.80 |
$21.00 |
$20.65 |
$20.00 |
$25.80 |
$19.50 |
$28.00 |
| 770 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,091 | LF |
$5.20 |
$3.50 |
$3.44 |
$7.25 |
$5.05 |
$3.25 |
$6.00 |
| 780 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,410 | SD |
$0.3000 |
$0.2000 |
$0.1600 |
$0.2000 |
$0.0300 |
$0.1500 |
$0.0500 |
| 790 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 9,780 | SD |
$0.5000 |
$0.3000 |
$0.2600 |
$0.3000 |
$0.0300 |
$0.2500 |
$0.0500 |
| 800 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,090 | SD |
$0.9500 |
$1.00 |
$1.06 |
$1.15 |
$0.3000 |
$1.00 |
$1.00 |
| 810 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 480 | SD |
$1.50 |
$6.00 |
$5.29 |
$6.00 |
$16.80 |
$5.00 |
$25.00 |
| 820 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 7,770 | SD |
$0.5000 |
$1.00 |
$0.5300 |
$0.6000 |
$3.15 |
$0.5000 |
$4.00 |
| 830 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 6,900 | SD |
$0.2000 |
$1.00 |
$0.7900 |
$0.9000 |
$1.60 |
$0.7500 |
$2.00 |
| 840 | 880(F)6700 |
DRUMS | 6,900 | SD |
$0.2000 |
$1.00 |
$0.7900 |
$0.9000 |
$1.60 |
$0.7500 |
$2.00 |
| 850 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,854 | SD |
$16.00 |
$6.00 |
$5.29 |
$6.00 |
$8.40 |
$5.00 |
$10.00 |
| 860 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$25,000.00 |
$33,796.61 |
$55,000.00 |
$17,285.48 |
$10,000.00 |
$13,000.00 |
| 870 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$9,218.39 |
$50,000.00 |
$7,875.00 |
$5,000.00 |
$13,500.00 |
| 880 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$135,800.00 |
$75,000.00 |
$83,225.31 |
$130,000.00 |
$115,500.00 |
$35,000.00 |
$140,000.00 |