| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$49,536.82 |
$47,002.86 |
$20,000.00 |
$95,000.00 |
$100,000.00 |
$150,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 44,227 | CY |
$11.00 |
$5.73 |
$13.09 |
$12.00 |
$11.30 |
$11.00 |
$11.85 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$50,051.82 |
$55,467.93 |
$50,000.00 |
$110,000.00 |
$40,000.00 |
$125,000.00 |
| 40 | 221(C)2410 |
REINFORCED SILT FENCE | 4,662 | LF |
$7.00 |
$3.03 |
$3.44 |
$4.25 |
$3.20 |
$5.00 |
$1.92 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 230 | LF |
$18.00 |
$19.05 |
$21.58 |
$16.50 |
$20.00 |
$12.00 |
$10.98 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 56,445.89 | SY |
$3.00 |
$3.34 |
$3.79 |
$4.40 |
$3.50 |
$4.00 |
$3.26 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 11.67 | AC |
$1,350.00 |
$2,008.50 |
$2,274.98 |
$2,200.00 |
$2,107.00 |
$1,200.00 |
$1,207.57 |
| 80 | 307(E)3600 |
CEMENTITIOUS STABILIZED SUBGRADE | 46,865 | SY |
$10.00 |
$10.24 |
$8.30 |
$9.50 |
$8.10 |
$9.00 |
$7.00 |
| 90 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 297.74 | TON |
$50.00 |
$52.01 |
$54.81 |
$52.00 |
$150.00 |
$60.00 |
$49.39 |
| 100 | 407(B)7300 |
TACK COAT | 3,110.93 | GAL |
$4.50 |
$3.86 |
$5.53 |
$3.30 |
$3.05 |
$4.00 |
$4.60 |
| 110 | 408 8100 |
PRIME COAT | 16,594.4 | GAL |
$4.50 |
$2.06 |
$5.53 |
$0.2700 |
$0.2500 |
$2.00 |
$4.11 |
| 120 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 9,626.09 | TON |
$115.00 |
$106.09 |
$102.35 |
$120.00 |
$104.00 |
$96.00 |
$105.00 |
| 130 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,748.74 | TON |
$130.00 |
$123.60 |
$117.80 |
$135.00 |
$119.50 |
$111.00 |
$120.00 |
| 140 | 509(D)0500 |
CLASS C CONCRETE | 20 | CY |
$550.00 |
$721.00 |
$410.38 |
$500.00 |
$488.00 |
$550.00 |
$626.46 |
| 150 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 1,139.46 | TON |
$70.00 |
$90.64 |
$67.55 |
$73.00 |
$78.50 |
$120.00 |
$69.14 |
| 160 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 138 | LF |
$200.00 |
$203.94 |
$242.57 |
$180.00 |
$234.00 |
$171.50 |
$205.24 |
| 170 | 613(A)5378 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 226 | LF |
$415.00 |
$338.87 |
$403.57 |
$400.00 |
$334.50 |
$350.00 |
$352.31 |
| 180 | 613(A)5386 |
73" X 45" R.C.PIPE ARCH CLASS A-III | 71 | LF |
$600.00 |
$599.46 |
$669.92 |
$625.00 |
$441.50 |
$575.00 |
$501.57 |
| 190 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 650 | LF |
$70.00 |
$73.13 |
$96.45 |
$60.00 |
$65.80 |
$75.00 |
$57.95 |
| 200 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 130 | LF |
$75.00 |
$82.40 |
$96.45 |
$65.00 |
$92.30 |
$88.00 |
$58.17 |
| 210 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 36 | EA |
$2,100.00 |
$2,575.00 |
$2,543.12 |
$2,675.00 |
$2,605.00 |
$2,700.00 |
$1,727.73 |
| 220 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 6 | EA |
$3,000.00 |
$3,399.00 |
$2,569.06 |
$4,450.00 |
$4,340.00 |
$3,400.00 |
$3,217.43 |
| 230 | 613(M)6976 |
TYPE E4 CULVERT END TREATMENT | 2 | EA |
$3,500.00 |
$3,811.00 |
$2,869.30 |
$5,770.00 |
$5,650.00 |
$7,500.00 |
$5,501.28 |
| 240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$5,150.00 |
$10,390.35 |
$10,000.00 |
$37,500.00 |
$30,000.00 |
$75,000.00 |
| 250 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 126 | SY |
$20.00 |
$7.73 |
$20.01 |
$10.00 |
$18.70 |
$12.00 |
$10.65 |
| 260 | 619(C)6600 |
SAWING PAVEMENT | 45 | LF |
$10.00 |
$15.45 |
$6.13 |
$10.00 |
$75.50 |
$5.00 |
$3.29 |
| 270 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 8 | EA |
$3,000.00 |
$1,648.00 |
$1,866.65 |
$2,035.00 |
$1,715.00 |
$2,700.00 |
$1,756.05 |
| 280 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$3,500.00 |
$2,140.34 |
$2,423.72 |
$2,600.00 |
$2,225.00 |
$2,500.00 |
$2,280.12 |
| 290 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 6 | EA |
$300.00 |
$309.00 |
$300.00 |
$200.00 |
$267.50 |
$400.00 |
$384.14 |
| 300 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$30.00 |
$41.20 |
$26.35 |
$25.00 |
$33.70 |
$19.00 |
$18.49 |
| 310 | 501(F)1700 |
GRANULAR BACKFILL | 66 | CY |
$105.00 |
$98.39 |
$75.37 |
$104.00 |
$195.50 |
$100.00 |
$97.95 |
| 320 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 164 | LF |
$300.00 |
$362.22 |
$372.47 |
$304.00 |
$313.00 |
$380.00 |
$367.12 |
| 330 | 504(B)5300 |
SAW-CUT GROOVING | 139.8 | SY |
$15.00 |
$13.39 |
$14.00 |
$13.00 |
$12.80 |
$14.00 |
$13.17 |
| 340 | 504(D)5410 |
CONCRETE RAIL (TR3) | 166 | LF |
$120.00 |
$114.32 |
$90.34 |
$100.00 |
$173.50 |
$170.00 |
$156.95 |
| 350 | 506(A)7200 |
STRUCTURAL STEEL | 500 | LB |
$6.50 |
$2.89 |
$4.68 |
$4.00 |
$7.85 |
$5.00 |
$5.16 |
| 360 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$1,256.30 |
$641.53 |
$750.00 |
$1,575.00 |
$1,500.00 |
$1,338.99 |
| 370 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,650.00 |
$1,256.30 |
$641.53 |
$750.00 |
$1,765.00 |
$1,500.00 |
$1,338.99 |
| 380 | 509(A)0210 |
CLASS AA CONCRETE | 45 | CY |
$1,500.00 |
$1,330.76 |
$1,100.00 |
$1,200.00 |
$1,375.00 |
$1,500.00 |
$1,404.84 |
| 390 | 509(B)0320 |
CLASS A CONCRETE | 60.4 | CY |
$1,200.00 |
$1,335.91 |
$875.71 |
$1,100.00 |
$1,180.00 |
$1,500.00 |
$1,385.63 |
| 400 | 511(A)2210 |
REINFORCING STEEL | 19,140 | LB |
$2.00 |
$1.45 |
$1.74 |
$1.05 |
$1.85 |
$2.50 |
$1.50 |
| 410 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 88 | LF |
$60.00 |
$37.55 |
$43.33 |
$35.00 |
$62.70 |
$80.00 |
$74.63 |
| 420 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 190 | LF |
$70.00 |
$51.20 |
$55.61 |
$40.00 |
$72.20 |
$92.00 |
$88.24 |
| 430 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 88 | LF |
$25.00 |
$51.50 |
$62.02 |
$20.00 |
$42.20 |
$20.00 |
$18.66 |
| 440 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 190 | LF |
$25.00 |
$51.50 |
$71.60 |
$20.00 |
$39.10 |
$23.00 |
$22.06 |
| 450 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 460 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 963 | TON |
$65.00 |
$88.39 |
$69.43 |
$73.00 |
$80.70 |
$91.00 |
$86.70 |
| 470 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 240 | TON |
$50.00 |
$63.09 |
$55.24 |
$56.00 |
$62.80 |
$75.00 |
$70.24 |
| 480 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 104 | LF |
$40.00 |
$51.50 |
$31.88 |
$35.00 |
$60.80 |
$55.00 |
$53.78 |
| 490 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$40.00 |
$51.50 |
$27.97 |
$40.00 |
$29.70 |
$55.00 |
$53.78 |
| 500 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$12,293.05 |
$14,643.51 |
$10,000.00 |
$25,000.00 |
$20,000.00 |
$115,000.00 |
| 510 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$30.00 |
$41.20 |
$11.51 |
$25.00 |
$47.90 |
$19.00 |
$18.38 |
| 520 | 501(F)1700 |
GRANULAR BACKFILL | 88 | CY |
$105.00 |
$98.39 |
$75.37 |
$104.00 |
$210.00 |
$100.00 |
$97.13 |
| 530 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 299 | LF |
$400.00 |
$372.28 |
$376.99 |
$310.00 |
$328.00 |
$380.00 |
$367.67 |
| 540 | 504(B)5300 |
SAW-CUT GROOVING | 249.8 | SY |
$15.00 |
$11.33 |
$11.67 |
$11.00 |
$10.70 |
$14.00 |
$10.98 |
| 550 | 504(D)5410 |
CONCRETE RAIL (TR3) | 266.4 | LF |
$120.00 |
$114.32 |
$99.40 |
$100.00 |
$164.00 |
$140.00 |
$133.90 |
| 560 | 506(A)7200 |
STRUCTURAL STEEL | 510 | LB |
$6.50 |
$2.89 |
$4.68 |
$4.00 |
$7.75 |
$5.00 |
$5.05 |
| 570 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$1,489.87 |
$641.53 |
$950.00 |
$1,575.00 |
$1,700.00 |
$1,618.86 |
| 580 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 3 | EA |
$1,650.00 |
$1,489.87 |
$641.53 |
$950.00 |
$1,765.00 |
$1,700.00 |
$1,618.86 |
| 590 | 509(A)0210 |
CLASS AA CONCRETE | 79 | CY |
$1,500.00 |
$1,060.90 |
$1,050.00 |
$1,200.00 |
$1,125.00 |
$1,300.00 |
$1,212.77 |
| 600 | 509(B)0320 |
CLASS A CONCRETE | 69.8 | CY |
$1,200.00 |
$1,047.51 |
$882.56 |
$1,100.00 |
$1,055.00 |
$1,400.00 |
$1,297.83 |
| 610 | 511(A)2210 |
REINFORCING STEEL | 28,300 | LB |
$2.00 |
$1.47 |
$0.7600 |
$1.05 |
$1.90 |
$1.60 |
$1.51 |
| 620 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 268 | LF |
$60.00 |
$42.70 |
$39.59 |
$35.00 |
$50.10 |
$60.00 |
$56.19 |
| 630 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 869 | LF |
$70.00 |
$51.20 |
$46.38 |
$40.00 |
$48.60 |
$65.00 |
$61.46 |
| 640 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 268 | LF |
$25.00 |
$15.45 |
$40.99 |
$20.00 |
$27.70 |
$15.00 |
$14.05 |
| 650 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 869 | LF |
$25.00 |
$15.45 |
$26.78 |
$20.00 |
$25.60 |
$16.00 |
$15.37 |
| 660 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 670 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,227 | TON |
$65.00 |
$85.30 |
$65.64 |
$73.00 |
$80.40 |
$91.00 |
$86.70 |
| 680 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 320 | TON |
$50.00 |
$60.00 |
$55.82 |
$56.00 |
$61.90 |
$74.00 |
$70.24 |
| 690 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$40.00 |
$51.50 |
$34.91 |
$35.00 |
$84.80 |
$59.00 |
$55.97 |
| 700 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$40.00 |
$51.50 |
$39.12 |
$40.00 |
$29.70 |
$55.00 |
$52.68 |
| 710 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$14,528.15 |
$22,868.97 |
$15,000.00 |
$25,000.00 |
$25,000.00 |
$123,000.00 |
| 720 | 805(D)3536 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 1 | EA |
$1,100.00 |
$360.50 |
$408.33 |
$385.00 |
$374.50 |
$600.00 |
$384.14 |
| 730 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 60.9 | SF |
$45.00 |
$59.74 |
$67.67 |
$62.00 |
$62.10 |
$40.00 |
$63.66 |
| 740 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 135 | LF |
$15.00 |
$8.24 |
$9.33 |
$9.00 |
$8.55 |
$10.00 |
$8.78 |
| 750 | 855(A)7200 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 46,532 | LF |
$1.00 |
$0.6200 |
$0.7100 |
$0.6700 |
$0.6500 |
$0.7500 |
$0.6700 |
| 760 | 855(A)7216 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 56 | LF |
$17.00 |
$10.30 |
$11.67 |
$11.00 |
$10.70 |
$23.00 |
$10.98 |
| 770 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,720 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0300 |
$0.3000 |
$0.0200 |
| 780 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,860 | SD |
$1.50 |
$2.47 |
$2.80 |
$2.50 |
$2.55 |
$0.3000 |
$2.63 |
| 790 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 4,320 | SD |
$1.50 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0300 |
$1.75 |
$0.0200 |
| 791 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 8,640 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.0300 |
$0.0300 |
$0.6000 |
$0.0200 |
| 800 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$47,792.00 |
$17,557.78 |
$51,050.00 |
$85,000.00 |
$50,000.00 |
$56,138.70 |
| 810 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$3,135.32 |
$2,916.63 |
$4,000.00 |
$7,500.00 |
$50,000.00 |
$29,292.58 |
| 820 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$174,362.15 |
$239,000.00 |
$240,000.00 |
$262,032.60 |
$263,000.00 |
$277,800.00 |