| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$15,500.00 |
$7,800.00 |
$18,615.00 |
$20,000.00 |
$7,210.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 14,193.92 | CY |
$9.00 |
$5.28 |
$9.00 |
$10.10 |
$7.70 |
$6.75 |
| 3 | 202(I) 5100 |
SELECTIVE SUBGRADE TOPPING | 1 | LSUM |
$12,000.00 |
$7,912.00 |
$12,000.00 |
$12,240.00 |
$10,000.00 |
$8,755.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$2.00 |
$4.00 |
$7.00 |
$6.10 |
$1.75 |
$3.05 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,281 | LF |
$8.00 |
$10.50 |
$14.00 |
$12.20 |
$7.25 |
$16.40 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 44,817.41 | SY |
$1.15 |
$1.55 |
$2.65 |
$2.55 |
$2.95 |
$2.80 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.26 | AC |
$268.00 |
$1,000.00 |
$1,150.00 |
$1,020.00 |
$1,200.00 |
$1,133.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 40.12 | CY |
$92.00 |
$95.48 |
$47.00 |
$82.30 |
$42.00 |
$82.40 |
| 9 | 307(A) 4200 |
FLY ASH | 1,933.4 | TON |
$72.75 |
$27.75 |
$90.00 |
$56.50 |
$57.00 |
$51.50 |
| 10 | 307(D) 4230 |
LIME | 90 | TON |
$188.00 |
$197.12 |
$170.00 |
$186.00 |
$175.00 |
$164.80 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 30,040.87 | SY |
$3.50 |
$3.06 |
$3.00 |
$2.45 |
$3.25 |
$2.32 |
| 12 | 307(G) 4260 |
LIME PRETREATMENT | 8,333.33 | SY |
$1.70 |
$0.8000 |
$1.50 |
$2.45 |
$1.80 |
$1.55 |
| 13 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 10,718.65 | LF |
$5.42 |
$5.91 |
$1.25 |
$7.80 |
$29.90 |
$7.75 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 182.94 | TON |
$48.00 |
$48.00 |
$25.00 |
$33.90 |
$48.00 |
$39.15 |
| 15 | 407(B) 0250 |
TACK COAT | 2,782.28 | GAL |
$3.50 |
$2.83 |
$2.50 |
$3.55 |
$3.70 |
$3.80 |
| 16 | 408 5774 |
PRIME COAT | 10,530.98 | GAL |
$4.25 |
$0.0500 |
$3.75 |
$3.70 |
$4.00 |
$3.65 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,777.06 | TON |
$66.00 |
$61.69 |
$62.00 |
$58.80 |
$67.50 |
$89.45 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,134.34 | TON |
$75.00 |
$68.84 |
$71.00 |
$69.20 |
$75.30 |
$90.95 |
| 19 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 110 | CY |
$25.00 |
$30.00 |
$15.00 |
$57.00 |
$25.00 |
$15.45 |
| 20 | 501(G) 6315 |
CLSM BACKFILL | 110 | CY |
$182.00 |
$129.48 |
$110.00 |
$128.00 |
$190.00 |
$164.80 |
| 21 | 509(B) 0321 |
CLASS A CONCRETE | 57 | CY |
$625.00 |
$670.00 |
$1,000.00 |
$1,278.00 |
$650.00 |
$618.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$610.00 |
$470.00 |
$395.00 |
$307.50 |
$650.00 |
$412.00 |
| 23 | 511(A) 0332 |
REINFORCING STEEL | 1,376 | LB |
$1.15 |
$1.70 |
$0.6500 |
$19.60 |
$2.00 |
$1.25 |
| 24 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 3,003.47 | TON |
$51.00 |
$26.48 |
$55.00 |
$58.60 |
$48.00 |
$49.45 |
| 25 | 601(H) 1390 |
TYPE IV GROUTED RIPRAP | 184 | SY |
$75.00 |
$57.55 |
$115.00 |
$250.50 |
$95.00 |
$70.00 |
| 26 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 4,888.89 | SY |
$3.50 |
$3.36 |
$2.80 |
$8.75 |
$4.00 |
$2.05 |
| 27 | 610(G) 0617 |
ASPHALT DRIVEWAY | 31.87 | TON |
$82.00 |
$77.68 |
$285.00 |
$292.00 |
$100.00 |
$130.50 |
| 28 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 1 | EA |
$6,000.00 |
$5,580.00 |
$1,350.00 |
$7,420.00 |
$5,500.00 |
$5,974.00 |
| 29 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 32 | LF |
$81.00 |
$94.00 |
$100.00 |
$82.80 |
$71.00 |
$67.00 |
| 30 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 56 | LF |
$71.00 |
$100.86 |
$75.00 |
$87.00 |
$74.00 |
$77.25 |
| 31 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 176 | LF |
$94.50 |
$115.20 |
$100.00 |
$100.50 |
$85.00 |
$92.70 |
| 32 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 294 | LF |
$117.50 |
$145.57 |
$100.00 |
$135.50 |
$110.00 |
$134.00 |
| 33 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 160 | LF |
$150.00 |
$184.72 |
$120.00 |
$160.00 |
$140.00 |
$164.80 |
| 34 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 136 | LF |
$41.00 |
$53.00 |
$56.00 |
$34.20 |
$38.00 |
$25.75 |
| 35 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 136 | LF |
$47.00 |
$56.00 |
$60.00 |
$28.90 |
$42.00 |
$33.00 |
| 36 | 619(B) 4767 |
REMOVAL OF ASPHALT DRIVEWAY | 142.12 | SY |
$8.60 |
$7.59 |
$20.00 |
$56.10 |
$7.00 |
$6.15 |
| 37 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 200 | LF |
$5.60 |
$4.31 |
$8.00 |
$12.20 |
$3.00 |
$3.10 |
| 38 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 417 | LF |
$10.60 |
$5.04 |
$27.00 |
$5.10 |
$5.00 |
$5.15 |
| 39 | 619(C) 0924 |
SAWING PAVEMENT | 144 | LF |
$6.60 |
$5.48 |
$2.00 |
$15.00 |
$8.00 |
$10.45 |
| 40 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 500 | LF |
$7.00 |
$11.03 |
$20.00 |
$6.95 |
$7.50 |
$15.45 |
| 41 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 1 | EA |
$187.00 |
$50.75 |
$580.00 |
$51.00 |
$75.00 |
$51.50 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 75.15 | SF |
$26.00 |
$27.25 |
$40.00 |
$25.50 |
$35.00 |
$25.75 |
| 43 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 15,399.6 | LF |
$0.5500 |
$0.5000 |
$0.7000 |
$0.4900 |
$0.6500 |
$0.5000 |
| 44 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$8,500.00 |
$6,975.00 |
$8,159.00 |
$6,500.00 |
$8,240.00 |
| 45 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,000.00 |
$15,670.00 |
$35,000.00 |
$25,700.00 |
$32,000.00 |
$26,000.00 |
| 46 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,300.00 |
$5,775.00 |
$26,000.00 |
$2,550.00 |
$3,000.00 |
$6,000.00 |
| 47 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$104,490.00 |
$60,000.00 |
$133,581.79 |
$70,000.00 |
$164,000.00 |