| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$125,000.00 |
$148,000.00 |
$185,000.00 |
$200,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 89,524.87 | CY |
$10.00 |
$5.29 |
$11.30 |
$13.25 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 78,589.34 | CY |
$10.00 |
$9.94 |
$15.40 |
$8.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$195,000.00 |
$101,000.00 |
$150,000.00 |
$185,000.00 |
| 50 | 221(A)2200 |
TEMPORARY SLOPE DRAIN | 830 | LF |
$15.00 |
$30.00 |
$8.25 |
$32.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 32,200 | LF |
$3.00 |
$2.00 |
$2.50 |
$2.50 |
| 70 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 25 | EA |
$256.15 |
$110.00 |
$355.00 |
$500.00 |
| 80 | 221(D)2500 |
TEMPORARY SEDIMENT BASIN | 6 | EA |
$600.00 |
$3,000.00 |
$8,500.00 |
$7,000.00 |
| 90 | 221(E)2600 |
TEMPORARY SILT DIKE | 5,440 | LF |
$10.00 |
$9.50 |
$9.90 |
$10.00 |
| 100 | 229 6100 |
DITCH LINER PROTECTION | 1,954 | LF |
$3.20 |
$2.00 |
$2.55 |
$6.00 |
| 110 | 230(A)7200 |
SOLID SLAB SODDING | 241,473.87 | SY |
$3.00 |
$2.25 |
$2.55 |
$5.00 |
| 120 | 233(A)0200 |
VEGETATIVE MULCHING | 104.7 | AC |
$553.15 |
$975.00 |
$896.50 |
$1,250.00 |
| 130 | 303(A)1200 |
AGGREGATE BASE TYPE A | 30,772.35 | CY |
$65.00 |
$78.00 |
$72.60 |
$65.00 |
| 150 | 307(D)3500 |
LIME | 814.62 | TON |
$237.25 |
$305.00 |
$310.00 |
$290.00 |
| 160 | 307(E)3600 |
CEMENTITIOUS STABILIZED SUBGRADE | 165,453.17 | SY |
$4.00 |
$6.70 |
$6.40 |
$5.25 |
| 170 | 307(G)3800 |
LIME PRETREATMENT | 62,856.48 | SY |
$2.00 |
$1.90 |
$10.00 |
$3.00 |
| 180 | 310(B)5300 |
SUBGRADE, METHOD B | 9,564.48 | SY |
$3.00 |
$9.00 |
$1.45 |
$2.90 |
| 190 | 325 0100 |
SEPARATOR FABRIC | 146,855.56 | SY |
$3.00 |
$1.50 |
$3.15 |
$1.65 |
| 200 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,257.77 | TON |
$40.00 |
$45.00 |
$45.00 |
$32.00 |
| 210 | 407(A)7200 |
FOG SEAL | 43.06 | GAL |
$6.45 |
$4.00 |
$8.75 |
$3.00 |
| 220 | 407(B)7300 |
TACK COAT | 20,843.26 | GAL |
$4.00 |
$4.00 |
$4.25 |
$3.00 |
| 230 | 408 8100 |
PRIME COAT | 108,689.9 | GAL |
$3.00 |
$4.00 |
$4.50 |
$1.50 |
| 240 | 409(A)9200 |
FABRIC REINFORCEMENT | 426.31 | SY |
$10.25 |
$6.00 |
$7.05 |
$5.00 |
| 241 | 409(B)9300 |
BITUMINOUS BINDER | 106.58 | GAL |
$62.00 |
$9.00 |
$10.50 |
$80.00 |
| 250 | 411(B)1300 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 16,200.98 | TON |
$130.00 |
$115.00 |
$117.00 |
$126.00 |
| 260 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 35,402.71 | TON |
$130.00 |
$112.00 |
$100.00 |
$115.00 |
| 270 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 10,671.65 | TON |
$140.00 |
$135.00 |
$128.75 |
$140.00 |
| 280 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,645.58 | TON |
$150.00 |
$120.00 |
$118.50 |
$135.00 |
| 290 | 412 3100 |
COLD MILLING PAVEMENT | 430.56 | SY |
$20.00 |
$7.00 |
$43.50 |
$19.00 |
| 300 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 37,514.76 | LF |
$0.9500 |
$0.2800 |
$0.2000 |
$1.20 |
| 310 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 378 | CY |
$26.35 |
$28.00 |
$27.70 |
$21.00 |
| 320 | 509(A)0200 |
CLASS AA CONCRETE | 1,191.18 | CY |
$550.00 |
$470.00 |
$440.00 |
$900.00 |
| 330 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 5.93 | CY |
$629.00 |
$1,050.00 |
$460.00 |
$600.00 |
| 340 | 509(D)0500 |
CLASS C CONCRETE | 235.88 | CY |
$500.00 |
$278.00 |
$388.00 |
$450.00 |
| 350 | 511(A)2200 |
REINFORCING STEEL | 173,411 | LB |
$1.50 |
$1.75 |
$1.20 |
$1.50 |
| 360 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$45,000.00 |
$45,000.00 |
$165,000.00 |
$100,000.00 |
| 370 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 2,176 | TON |
$60.00 |
$64.00 |
$59.50 |
$92.00 |
| 380 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 612 | TON |
$55.00 |
$46.00 |
$54.50 |
$80.00 |
| 390 | 609(B)4370 |
2'-8" COMB.CRB.& GUT.(6" MNTBLE) | 1,728.04 | LF |
$36.90 |
$24.90 |
$33.30 |
$35.00 |
| 400 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 2,298.19 | SY |
$75.00 |
$67.25 |
$86.50 |
$85.00 |
| 410 | 611(G)0350 |
INLET (SMD-TYPE 1) | 24 | EA |
$1,500.00 |
$3,800.00 |
$4,626.00 |
$5,200.00 |
| 420 | 611(G)7754 |
INLET CI DES. 2 (STD) | 1 | EA |
$3,942.42 |
$5,600.00 |
$6,287.00 |
$7,200.00 |
| 430 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 8.39 | VF |
$405.45 |
$650.00 |
$640.00 |
$1,100.00 |
| 440 | 611(H)0970 |
ADD'L DEPTH IN INLET (SMD-DOUBLE-TYPE 1) | 57.15 | VF |
$20.00 |
$450.00 |
$475.00 |
$800.00 |
| 450 | 611(L)1600 |
JUNCTION BOXES | 401.94 | CF |
$84.35 |
$160.00 |
$79.70 |
$140.00 |
| 460 | 613(A)5208 |
18" R.C.PIPE CLASS III | 820 | LF |
$80.00 |
$80.00 |
$80.30 |
$125.00 |
| 470 | 613(A)5216 |
24" R.C.PIPE CLASS III | 1,946 | LF |
$100.00 |
$94.00 |
$104.50 |
$140.00 |
| 480 | 613(A)5220 |
30" R.C.PIPE CLASS III | 436 | LF |
$150.00 |
$130.00 |
$132.00 |
$175.00 |
| 490 | 613(A)5232 |
48" R.C.PIPE CLASS III | 130 | LF |
$240.00 |
$268.00 |
$272.50 |
$290.00 |
| 500 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 2,608 | LF |
$45.00 |
$51.00 |
$51.70 |
$65.00 |
| 510 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 114 | LF |
$80.00 |
$63.00 |
$64.70 |
$85.00 |
| 520 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 50 | LF |
$95.00 |
$74.00 |
$74.40 |
$80.00 |
| 530 | 613(B)5536 |
48" CORR. GALV. STEEL PIPE | 100 | LF |
$140.00 |
$140.00 |
$106.00 |
$170.00 |
| 540 | 613(B)5616 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 262 | LF |
$50.30 |
$87.00 |
$74.90 |
$130.00 |
| 550 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 8,000 | LF |
$20.00 |
$24.00 |
$20.00 |
$25.00 |
| 560 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 400 | LF |
$20.00 |
$27.00 |
$20.00 |
$25.00 |
| 570 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 1,140 | LF |
$15.50 |
$23.00 |
$15.00 |
$25.00 |
| 580 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 40 | LF |
$25.00 |
$40.00 |
$15.00 |
$30.00 |
| 590 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 3 | EA |
$2,745.00 |
$4,800.00 |
$4,966.00 |
$3,600.00 |
| 600 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 62 | EA |
$1,208.00 |
$1,100.00 |
$1,838.00 |
$1,800.00 |
| 610 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 10 | EA |
$1,462.00 |
$1,150.00 |
$2,015.00 |
$2,100.00 |
| 620 | 613(N)7100 |
TYPE A4 SLOPED CONCRETE END SECTION | 8 | EA |
$1,105.00 |
$1,600.00 |
$2,966.00 |
$3,000.00 |
| 630 | 613(N)7104 |
TYPE B4 SLOPED CONCRETE END SECTION | 2 | EA |
$1,200.00 |
$1,600.00 |
$3,568.00 |
$3,000.00 |
| 640 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 44 | EA |
$531.85 |
$1,000.00 |
$1,009.00 |
$2,000.00 |
| 650 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$135,000.00 |
$185,000.00 |
$100,000.00 |
$250,000.00 |
| 660 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 37,529.24 | SY |
$5.00 |
$6.00 |
$10.50 |
$4.00 |
| 670 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 32,210.34 | SY |
$10.00 |
$12.00 |
$24.50 |
$9.00 |
| 680 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 1,634.67 | SY |
$15.00 |
$4.00 |
$10.20 |
$20.00 |
| 690 | 619(C)6600 |
SAWING PAVEMENT | 1,846 | LF |
$4.30 |
$3.50 |
$5.00 |
$4.00 |
| 700 | 624(A)3200 |
FENCE-STYLE WWF | 547.94 | LF |
$10.00 |
$11.00 |
$10.80 |
$12.00 |
| 710 | 624(B)3360 |
GATES-STYLE WWF (4.5'HIGH X 16'LONG) | 1 | EA |
$894.50 |
$1,800.00 |
$1,650.00 |
$1,300.00 |
| 720 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 6,307.26 | LF |
$10.00 |
$9.00 |
$9.00 |
$10.00 |
| 730 | 624(E)3600 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 228.6 | LF |
$30.00 |
$46.00 |
$44.00 |
$100.00 |
| 740 | 624(E)3635 |
FENCE-STYLE CLF (7' HIGH, CLASS B) | 672.24 | LF |
$20.95 |
$76.00 |
$77.00 |
$130.00 |
| 750 | 624(F)3724 |
GATES-STYLE CLF (4'HIGH X 18'LONG) | 2 | EA |
$1,200.00 |
$2,100.00 |
$1,980.00 |
$1,500.00 |
| 760 | 624(F)3769 |
GATES-STYLE CLF (6'HIGH X 14'LONG) | 2 | EA |
$1,500.00 |
$2,100.00 |
$1,980.00 |
$1,300.00 |
| 770 | 624(F)3775 |
GATES-STYLE CLF (6'HIGH X 18'LONG) | 1 | EA |
$1,772.33 |
$2,650.00 |
$2,750.00 |
$1,300.00 |
| 780 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 15 | EA |
$129.00 |
$185.00 |
$192.50 |
$105.00 |
| 790 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 5 | EA |
$222.95 |
$265.00 |
$275.00 |
$160.00 |
| 800 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 20 | EA |
$22.80 |
$70.00 |
$71.50 |
$160.00 |
| 810 | 629(E)7600 |
MAILBOX | 29 | EA |
$41.60 |
$70.00 |
$44.00 |
$110.00 |
| 820 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 6,880 | CY |
$15.00 |
$9.00 |
$13.30 |
$4.75 |
| 830 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 293 | CY |
$25.00 |
$32.00 |
$27.70 |
$35.00 |
| 840 | 509(A)0210 |
CLASS AA CONCRETE | 915 | CY |
$700.00 |
$475.00 |
$440.00 |
$600.00 |
| 850 | 511(A)2210 |
REINFORCING STEEL | 192,970 | LB |
$1.50 |
$1.90 |
$1.20 |
$1.65 |
| 860 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,750 | CY |
$15.00 |
$9.00 |
$13.30 |
$4.75 |
| 870 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 258 | CY |
$25.00 |
$32.00 |
$27.70 |
$35.00 |
| 880 | 509(A)0210 |
CLASS AA CONCRETE | 698.6 | CY |
$700.00 |
$475.00 |
$440.00 |
$600.00 |
| 890 | 511(A)2210 |
REINFORCING STEEL | 144,930 | LB |
$1.50 |
$1.90 |
$1.20 |
$1.65 |
| 900 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 3,900 | CY |
$15.00 |
$9.00 |
$13.30 |
$4.75 |
| 910 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 263 | CY |
$25.00 |
$32.00 |
$27.70 |
$35.00 |
| 920 | 509(A)0210 |
CLASS AA CONCRETE | 726 | CY |
$700.00 |
$475.00 |
$440.00 |
$600.00 |
| 930 | 511(A)2210 |
REINFORCING STEEL | 119,090 | LB |
$1.50 |
$1.90 |
$1.20 |
$1.75 |
| 940 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$68,390.00 |
$33,240.00 |
$15,000.00 |
| 950 | 805(A)3248 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$1,227.00 |
$6,000.00 |
$5,965.00 |
$510.00 |
| 960 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 179.41 | SF |
$23.00 |
$36.00 |
$35.20 |
$26.00 |
| 970 | 851(C)2415 |
2" SQUARE TUBE POST | 500 | LF |
$150.00 |
$9.00 |
$8.80 |
$15.00 |
| 980 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 18 | EA |
$18.45 |
$32.00 |
$35.20 |
$25.00 |
| 990 | 855(A)7200 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 88,461.87 | LF |
$1.00 |
$0.8300 |
$0.6500 |
$1.10 |
| 1,000 | 855(A)7208 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,745.6 | LF |
$1.05 |
$1.44 |
$1.50 |
$2.10 |
| 1,010 | 855(A)7216 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 312 | LF |
$7.15 |
$8.55 |
$8.80 |
$6.50 |
| 1,020 | 855(B)7304 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 8 | EA |
$175.30 |
$225.00 |
$220.00 |
$260.00 |
| 1,030 | 855(B)7308 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 4 | EA |
$231.84 |
$268.00 |
$275.00 |
$260.00 |
| 1,040 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 173,600 | LF |
$0.2500 |
$0.2400 |
$0.2200 |
$0.2200 |
| 1,050 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 10,550 | EA |
$0.5800 |
$0.6000 |
$0.7100 |
$1.00 |
| 1,060 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 69,388 | LF |
$0.1600 |
$0.3800 |
$0.4200 |
$0.1100 |
| 1,070 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 336 | EA |
$7.00 |
$9.00 |
$9.90 |
$25.00 |
| 1,080 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 500 | EA |
$5.05 |
$9.00 |
$9.90 |
$25.00 |
| 1,090 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 2,975 | SD |
$4.25 |
$21.00 |
$18.70 |
$30.00 |
| 1,100 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 9,054 | LF |
$25.00 |
$34.00 |
$28.90 |
$25.00 |
| 1,110 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,531 | LF |
$5.00 |
$2.00 |
$14.20 |
$14.00 |
| 1,120 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 9,280 | SD |
$0.2000 |
$0.1500 |
$0.0500 |
$1.60 |
| 1,130 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 77,095 | SD |
$0.3500 |
$0.1500 |
$0.0500 |
$0.8000 |
| 1,140 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 9,115 | SD |
$0.7800 |
$3.00 |
$3.00 |
$5.10 |
| 1,150 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 20,840 | SD |
$0.2600 |
$3.00 |
$2.75 |
$1.60 |
| 1,160 | 880(D)6500 |
VERTICAL PANELS | 10,725 | SD |
$0.1500 |
$0.0500 |
$0.0200 |
$0.5500 |
| 1,170 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,680 | SD |
$0.3000 |
$0.5500 |
$0.5500 |
$2.20 |
| 1,180 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 110,445 | SD |
$0.1000 |
$0.1500 |
$0.0500 |
$0.2700 |
| 1,190 | 880(F)6700 |
DRUMS | 99,720 | SD |
$0.1800 |
$0.0500 |
$0.0200 |
$0.7800 |
| 1,200 | 880(G)6800 |
TUBE CHANNELIZERS | 23,000 | SD |
$0.3000 |
$0.3500 |
$0.2700 |
$0.7800 |
| 1,210 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 920 | SD |
$11.25 |
$24.00 |
$18.70 |
$90.00 |
| 1,220 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$126,349.20 |
$175,000.00 |
$160,000.00 |
| 1,230 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$25,000.00 |
$22,000.00 |
$27,500.00 |
$150,000.00 |
| 1,240 | 640(A)1200 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$11,000.00 |
$15,000.00 |
$130,000.00 |
| 1,250 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$935,000.00 |
$984,600.00 |
|
|