| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$65,000.00 |
$80,000.00 |
$95,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 74,273 | CY |
$6.00 |
$12.00 |
$7.65 |
$18.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 250 | CY |
$18.02 |
$12.00 |
$35.00 |
$50.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$50,000.00 |
$65,000.00 |
$70,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,025 | LF |
$3.00 |
$1.50 |
$2.05 |
$2.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,960 | LF |
$7.00 |
$8.00 |
$6.05 |
$7.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 70,651 | SY |
$2.50 |
$1.05 |
$1.15 |
$1.35 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 14.6 | AC |
$600.00 |
$175.00 |
$403.00 |
$460.00 |
| 9 | 307(K) 4300 |
STABILIZED SUBGRADE | 43,223 | SY |
$6.70 |
$6.90 |
$10.50 |
$3.40 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 405 | TON |
$30.00 |
$30.00 |
$85.80 |
$27.00 |
| 11 | 407(B) 0250 |
TACK COAT | 6,670 | GAL |
$3.50 |
$3.50 |
$4.60 |
$2.00 |
| 12 | 408 5774 |
PRIME COAT | 15,129 | GAL |
$7.00 |
$3.50 |
$6.45 |
$1.00 |
| 13 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 7,904 | TON |
$80.00 |
$60.00 |
$66.20 |
$64.50 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,331 | TON |
$75.00 |
$53.00 |
$59.80 |
$54.60 |
| 15 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 5,330 | TON |
$85.00 |
$70.00 |
$70.30 |
$72.40 |
| 16 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 26.86 | CY |
$38.50 |
$80.00 |
$10.20 |
$500.00 |
| 17 | 509(A) 1326 |
CLASS AA CONCRETE | 276.34 | CY |
$616.02 |
$686.00 |
$367.50 |
$455.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$379.96 |
$300.00 |
$408.00 |
$625.00 |
| 19 | 511(A) 0332 |
REINFORCING STEEL | 47,682.1 | LB |
$1.00 |
$1.50 |
$0.8900 |
$0.4000 |
| 20 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 2,112 | TON |
$45.00 |
$50.00 |
$56.60 |
$44.00 |
| 21 | 610(G) 0617 |
ASPHALT DRIVEWAY | 1,635.83 | TON |
$120.00 |
$80.00 |
$77.00 |
$74.25 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 174 | LF |
$90.00 |
$70.00 |
$134.00 |
$94.00 |
| 23 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 158 | LF |
$100.00 |
$135.00 |
$123.00 |
$124.00 |
| 24 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 188 | LF |
$150.00 |
$200.00 |
$130.00 |
$135.00 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 82.4 | LF |
$56.36 |
$43.00 |
$91.10 |
$87.00 |
| 26 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,610 | LF |
$35.00 |
$43.00 |
$72.70 |
$45.50 |
| 27 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 32.4 | LF |
$73.90 |
$70.00 |
$136.00 |
$90.00 |
| 28 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 78 | EA |
$1,194.39 |
$840.00 |
$1,200.00 |
$1,900.00 |
| 29 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$1,838.05 |
$1,500.00 |
$1,836.00 |
$2,650.00 |
| 30 | 613(M) 7190 |
TYPE E4 CULVERT END TREATMENT | 4 | EA |
$1,000.00 |
$1,700.00 |
$2,244.00 |
$2,950.00 |
| 31 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 4 | EA |
$306.79 |
$0.00 |
$0.00 |
$0.00 |
| 32 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 66 | EA |
$306.93 |
$0.00 |
$0.00 |
$0.00 |
| 33 | 613(P) 0765 |
48" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$856.17 |
$0.00 |
$0.00 |
$0.00 |
| 34 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$25,000.00 |
$85,000.00 |
$55,000.00 |
| 35 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,457 | SY |
$3.00 |
$6.00 |
$10.80 |
$7.50 |
| 36 | 619(C) 0924 |
SAWING PAVEMENT | 85.97 | LF |
$6.47 |
$4.00 |
$21.50 |
$20.00 |
| 37 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 20 | EA |
$157.88 |
$100.00 |
$50.00 |
$275.00 |
| 38 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$175.36 |
$250.00 |
$137.50 |
$230.00 |
| 39 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 94.62 | SF |
$25.53 |
$29.00 |
$37.70 |
$25.00 |
| 40 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 225 | LF |
$8.08 |
$12.00 |
$6.10 |
$12.00 |
| 41 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 32,895 | LF |
$0.7300 |
$0.4600 |
$0.5000 |
$0.4500 |
| 42 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 116 | LF |
$10.83 |
$13.00 |
$8.25 |
$10.50 |
| 43 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$14,694.20 |
$25,000.00 |
$12,000.00 |
$45,000.00 |
| 44 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$63,513.75 |
$25,000.00 |
$45,000.00 |
$40,000.00 |
| 45 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$2,500.00 |
$5,000.00 |
$27,000.00 |
| 46 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$225,000.00 |
$210,000.00 |
$165,144.26 |
$200,000.00 |