| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$75,000.00 |
$155,000.00 |
$165,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 23,246 | CY |
$10.00 |
$10.50 |
$9.75 |
$15.35 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 15,619 | CY |
$12.00 |
$11.50 |
$20.30 |
$1.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$80,000.00 |
$158,000.00 |
$185,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 10,235 | LF |
$3.00 |
$3.25 |
$2.95 |
$2.90 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,776 | LF |
$8.00 |
$15.25 |
$13.50 |
$13.20 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 56,904 | SY |
$3.00 |
$2.70 |
$2.40 |
$2.35 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 11.76 | AC |
$1,000.00 |
$122.00 |
$108.00 |
$105.00 |
| 90 | 241 3100 |
MOWING | 11.76 | AC |
$200.00 |
$270.00 |
$241.00 |
$220.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 10,760 | CY |
$60.00 |
$70.00 |
$69.50 |
$82.00 |
| 115 | 311(B)6300 |
PROCESS EXISTING BASE & SURFACE,METHOD B | 15,824 | LF |
$8.00 |
$7.25 |
$7.25 |
$7.50 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,124.28 | TON |
$28.00 |
$39.00 |
$40.90 |
$41.53 |
| 130 | 407(B)7300 |
TACK COAT | 3,070.06 | GAL |
$2.75 |
$3.25 |
$2.85 |
$2.50 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,031.71 | TON |
$80.00 |
$79.00 |
$73.00 |
$78.50 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,575.47 | TON |
$85.00 |
$90.00 |
$90.00 |
$90.40 |
| 155 | 412 3100 |
COLD MILLING PAVEMENT | 114 | SY |
$40.00 |
$12.00 |
$83.30 |
$44.00 |
| 160 | 509(D)0500 |
CLASS C CONCRETE | 55.49 | CY |
$400.00 |
$460.00 |
$351.00 |
$317.00 |
| 170 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 245 | LF |
$32.00 |
$42.00 |
$48.60 |
$67.00 |
| 180 | 611(G)0362 |
INLET (SMD-TYPE 2B) | 1 | EA |
$4,500.00 |
$9,000.00 |
$8,418.00 |
$3,695.00 |
| 190 | 613(A)5216 |
24" R.C.PIPE CLASS III | 220 | LF |
$65.00 |
$128.00 |
$80.30 |
$68.60 |
| 200 | 613(A)5224 |
36" R.C.PIPE CLASS III | 46 | LF |
$110.00 |
$196.00 |
$109.00 |
$137.30 |
| 210 | 613(A)5232 |
48" R.C.PIPE CLASS III | 92 | LF |
$160.00 |
$265.00 |
$137.50 |
$211.20 |
| 220 | 613(A)5240 |
60" R.C.PIPE CLASS III | 158 | LF |
$235.00 |
$390.00 |
$204.00 |
$369.60 |
| 230 | 613(A)5374 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 134 | LF |
$220.00 |
$333.00 |
$165.00 |
$316.80 |
| 240 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 43 | LF |
$35.00 |
$72.00 |
$67.90 |
$47.50 |
| 250 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,077 | LF |
$35.00 |
$86.00 |
$66.50 |
$47.50 |
| 260 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 135 | LF |
$45.00 |
$97.00 |
$67.00 |
$68.60 |
| 270 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$20.00 |
$33.00 |
$11.00 |
$21.10 |
| 280 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 58 | EA |
$200.00 |
$465.00 |
$906.00 |
$316.80 |
| 290 | 613(L)6624 |
28" X 20" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$275.00 |
$545.00 |
$1,131.00 |
$475.00 |
| 300 | 613(L)6656 |
51" X 31" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$3,500.00 |
$4,200.00 |
$5,839.00 |
$7,390.00 |
| 310 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$700.00 |
$450.00 |
$1,076.00 |
$422.00 |
| 320 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$900.00 |
$1,200.00 |
$1,724.00 |
$2,323.00 |
| 330 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,500.00 |
$2,200.00 |
$3,522.00 |
$4,750.00 |
| 340 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$3,500.00 |
$3,600.00 |
$3,569.00 |
$5,280.00 |
| 350 | 613(L)6744 |
60" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$4,000.00 |
$6,400.00 |
$4,130.00 |
$6,865.00 |
| 360 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$35,000.00 |
$55,000.00 |
$88,305.00 |
$125,000.00 |
| 380 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 75 | LF |
$4.50 |
$7.00 |
$6.50 |
$5.30 |
| 390 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,700.00 |
$4,100.00 |
$3,456.00 |
$3,380.00 |
| 400 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,000 | LF |
$5.50 |
$8.00 |
$7.35 |
$15.80 |
| 410 | 625(B)4300 |
REMOVE AND RECONSTRUCT FENCE | 1,000 | LF |
$20.00 |
$10.00 |
$9.50 |
$16.90 |
| 420 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 20 | EA |
$100.00 |
$100.00 |
$162.00 |
$350.00 |
| 430 | 884(A)9200 |
BRIDGE GUARDRAIL RETROFIT TYPE I | 75 | LF |
$75.00 |
$60.00 |
$196.50 |
$79.20 |
| 440 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 24 | SY |
$800.00 |
$1,100.00 |
$998.00 |
$1,056.00 |
| 450 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 9 | EA |
$250.00 |
$115.00 |
$102.50 |
$100.00 |
| 460 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 53.76 | SF |
$21.00 |
$60.00 |
$54.00 |
$53.00 |
| 470 | 851(C)2415 |
2" SQUARE TUBE POST | 140 | LF |
$10.00 |
$8.00 |
$7.55 |
$7.50 |
| 480 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 63,451 | LF |
$0.4000 |
$0.5000 |
$0.4800 |
$0.6000 |
| 490 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 11 | LF |
$5.50 |
$6.00 |
$5.40 |
$5.50 |
| 500 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,780 | SD |
$0.3500 |
$0.0500 |
$0.0200 |
$0.0200 |
| 510 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 390 | SD |
$0.5000 |
$0.6000 |
$0.5400 |
$0.5300 |
| 520 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$1.50 |
$5.00 |
$4.30 |
$5.00 |
| 530 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 390 | SD |
$0.4500 |
$2.50 |
$2.15 |
$2.10 |
| 540 | 880(D)6500 |
VERTICAL PANELS | 9,360 | SD |
$0.0500 |
$0.2000 |
$0.1600 |
$0.1600 |
| 550 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,500 | SD |
$0.4000 |
$0.6000 |
$0.5400 |
$0.5300 |
| 560 | 880(F)6700 |
DRUMS | 11,100 | SD |
$0.1500 |
$0.0500 |
$0.0200 |
$0.0200 |
| 570 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$75,000.00 |
$90,000.00 |
$74,847.86 |
| 580 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$90,000.00 |
$5,000.00 |
$12,000.00 |
| 590 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$185,000.00 |
$213,000.00 |
$218,012.70 |
$186,000.00 |