| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,652.46 |
$145,000.00 |
$124,760.00 |
$95,000.00 |
$25,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 137,912 | CY |
$8.03 |
$5.50 |
$8.25 |
$8.75 |
$9.75 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 26,597 | CY |
$16.76 |
$6.75 |
$13.90 |
$8.75 |
$1.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$38,364.26 |
$95,500.00 |
$39,410.00 |
$168,000.00 |
$25,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 10,955 | LF |
$1.25 |
$2.48 |
$2.70 |
$2.50 |
$5.00 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$170.00 |
$698.00 |
$763.50 |
$700.00 |
$750.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 2,090 | LF |
$8.23 |
$10.88 |
$11.90 |
$11.00 |
$20.00 |
| 80 | 229 6100 |
DITCH LINER PROTECTION | 9,125 | LF |
$1.20 |
$1.00 |
$1.10 |
$1.00 |
$4.04 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 196,869 | SY |
$2.00 |
$1.85 |
$2.00 |
$1.90 |
$4.04 |
| 100 | 232(B)9300 |
SEEDING METHOD B | 40.68 | AC |
$200.00 |
$400.00 |
$437.50 |
$400.00 |
$16.95 |
| 110 | 233(A)0200 |
VEGETATIVE MULCHING | 40.68 | AC |
$217.99 |
$625.00 |
$683.50 |
$625.00 |
$17.95 |
| 120 | 241 3100 |
MOWING | 81.36 | AC |
$70.40 |
$95.00 |
$104.00 |
$95.00 |
$2.45 |
| 130 | 307(D)3500 |
LIME | 362 | TON |
$200.00 |
$260.00 |
$100.00 |
$235.00 |
$255.00 |
| 140 | 307(H)3900 |
LIME STABILIZED SUBGRADE | 20,066 | SY |
$3.50 |
$3.25 |
$1.25 |
$4.00 |
$3.33 |
| 150 | 307(K)4200 |
STABILIZED SUBGRADE | 45,922 | SY |
$7.00 |
$7.00 |
$7.20 |
$7.00 |
$5.99 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 533 | TON |
$34.42 |
$40.00 |
$35.40 |
$60.00 |
$45.00 |
| 170 | 407(B)7300 |
TACK COAT | 27,080 | GAL |
$3.62 |
$2.50 |
$3.45 |
$2.00 |
$3.50 |
| 180 | 408 8100 |
PRIME COAT | 24,713 | GAL |
$4.60 |
$3.00 |
$3.50 |
$3.00 |
$5.00 |
| 190 | 409(A)9200 |
FABRIC REINFORCEMENT | 14,657 | SY |
$1.84 |
$2.50 |
$3.05 |
$2.50 |
$2.50 |
| 200 | 409(B)9300 |
BITUMINOUS BINDER | 2,932 | GAL |
$4.00 |
$6.50 |
$7.05 |
$5.00 |
$4.85 |
| 210 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 9,343 | TON |
$95.00 |
$81.00 |
$85.00 |
$87.00 |
$90.65 |
| 220 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 38,070 | TON |
$85.00 |
$74.00 |
$78.10 |
$78.00 |
$83.50 |
| 230 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 5,489 | TON |
$105.00 |
$90.00 |
$101.00 |
$98.00 |
$95.00 |
| 240 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 13,371 | TON |
$95.00 |
$80.00 |
$89.30 |
$88.00 |
$90.70 |
| 250 | 412 3100 |
COLD MILLING PAVEMENT | 36,643 | SY |
$6.59 |
$1.00 |
$3.35 |
$2.25 |
$3.00 |
| 260 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 140 | CY |
$35.98 |
$30.00 |
$39.60 |
$25.00 |
$25.00 |
| 270 | 509(A)0200 |
CLASS AA CONCRETE | 424 | CY |
$559.53 |
$750.00 |
$503.50 |
$725.00 |
$725.00 |
| 280 | 509(D)0500 |
CLASS C CONCRETE | 1,610 | CY |
$331.10 |
$300.00 |
$294.00 |
$275.00 |
$375.00 |
| 290 | 511(A)2200 |
REINFORCING STEEL | 62,092 | LB |
$1.06 |
$1.00 |
$1.25 |
$1.25 |
$2.50 |
| 300 | 611(G)9020 |
INLET CDI RCP DES. 6 | 1 | EA |
$4,500.00 |
$11,000.00 |
$6,500.00 |
$6,000.00 |
$3,500.00 |
| 310 | 613(A)5216 |
24" R.C.PIPE CLASS III | 412 | LF |
$87.36 |
$78.00 |
$89.70 |
$71.00 |
$80.00 |
| 320 | 613(A)5224 |
36" R.C.PIPE CLASS III | 278 | LF |
$126.91 |
$125.00 |
$130.50 |
$130.00 |
$110.00 |
| 330 | 613(A)5232 |
48" R.C.PIPE CLASS III | 148 | LF |
$236.66 |
$190.00 |
$243.00 |
$275.00 |
$250.00 |
| 340 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 84 | LF |
$106.47 |
$120.00 |
$109.50 |
$118.00 |
$120.00 |
| 350 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 174 | LF |
$568.95 |
$200.00 |
$584.50 |
$180.00 |
$165.00 |
| 360 | 613(A)5378 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 92 | LF |
$243.06 |
$290.00 |
$249.50 |
$280.00 |
$300.00 |
| 370 | 613(B)5500 |
12" CORR. GALV. STEEL PIPE | 14 | LF |
$32.00 |
$56.00 |
$32.90 |
$50.00 |
$100.00 |
| 380 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 326 | LF |
$36.67 |
$68.00 |
$37.70 |
$60.00 |
$45.00 |
| 390 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 738 | LF |
$25.34 |
$78.00 |
$26.00 |
$72.00 |
$52.00 |
| 400 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 298 | LF |
$50.79 |
$103.00 |
$52.20 |
$85.00 |
$60.00 |
| 410 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 314 | LF |
$55.60 |
$110.00 |
$57.10 |
$98.00 |
$65.00 |
| 420 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 140 | LF |
$30.70 |
$70.00 |
$31.50 |
$62.00 |
$42.00 |
| 430 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 56 | LF |
$36.00 |
$90.00 |
$37.00 |
$73.00 |
$52.00 |
| 440 | 613(L)6700 |
12" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$800.00 |
$375.00 |
$822.00 |
$300.00 |
$800.00 |
| 450 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$900.00 |
$450.00 |
$924.50 |
$350.00 |
$1,200.00 |
| 460 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,800.00 |
$3,000.00 |
$2,876.00 |
$3,800.00 |
$3,500.00 |
| 470 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$1,012.00 |
$1,250.00 |
$1,086.00 |
$1,050.00 |
$1,800.00 |
| 480 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 16 | EA |
$1,500.00 |
$1,300.00 |
$1,301.00 |
$1,250.00 |
$2,000.00 |
| 490 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 8 | EA |
$1,900.00 |
$1,450.00 |
$2,348.00 |
$2,200.00 |
$2,500.00 |
| 500 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 10 | EA |
$2,461.25 |
$1,550.00 |
$2,874.00 |
$2,700.00 |
$3,000.00 |
| 510 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 8 | EA |
$1,376.60 |
$1,450.00 |
$1,725.00 |
$1,625.00 |
$1,800.00 |
| 520 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 16 | EA |
$885.00 |
$1,500.00 |
$1,980.00 |
$1,850.00 |
$2,000.00 |
| 530 | 613(M)7012 |
TYPE C6 CULVERT END TREATMENT | 4 | EA |
$3,000.00 |
$2,100.00 |
$2,489.00 |
$2,350.00 |
$2,400.00 |
| 540 | 613(M)7016 |
TYPE D6 CULVERT END TREATMENT | 4 | EA |
$2,000.00 |
$2,600.00 |
$3,338.00 |
$3,150.00 |
$3,000.00 |
| 550 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$47,000.00 |
$37,000.00 |
$48,280.00 |
$47,500.00 |
$12,500.00 |
| 560 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 9,028 | SY |
$14.68 |
$3.50 |
$7.35 |
$8.25 |
$3.00 |
| 570 | 619(C)6600 |
SAWING PAVEMENT | 33,473 | LF |
$3.77 |
$1.50 |
$0.6100 |
$2.50 |
$0.5000 |
| 580 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 4,463 | LF |
$4.68 |
$5.00 |
$6.55 |
$5.00 |
$6.00 |
| 590 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 18,090 | LF |
$4.08 |
$5.25 |
$6.80 |
$5.25 |
$6.25 |
| 600 | 624(E)3625 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 41 | LF |
$17.55 |
$30.00 |
$87.50 |
$31.00 |
$35.00 |
| 610 | 624(F)3769 |
GATES-STYLE CLF (6'HIGH X 14'LONG) | 2 | EA |
$1,000.00 |
$1,000.00 |
$1,640.00 |
$1,000.00 |
$1,500.00 |
| 620 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$110.00 |
$100.00 |
$218.50 |
$100.00 |
$125.00 |
| 630 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$174.07 |
$200.00 |
$301.00 |
$205.00 |
$220.00 |
| 640 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$80.00 |
$25.00 |
$49.20 |
$25.00 |
$50.00 |
| 650 | 629(E)7600 |
MAILBOX | 9 | EA |
$52.50 |
$50.00 |
$54.70 |
$50.00 |
$100.00 |
| 660 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 60 | SD |
$130.00 |
$200.00 |
$107.00 |
$210.00 |
$250.00 |
| 670 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 80,400 | LF |
$0.1500 |
$0.1200 |
$0.1600 |
$0.1300 |
$0.1500 |
| 680 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 40 | SD |
$7.80 |
$20.00 |
$19.70 |
$21.00 |
$22.00 |
| 690 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 360 | SD |
$16.00 |
$8.00 |
$6.55 |
$8.50 |
$10.00 |
| 700 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 300 | LF |
$23.00 |
$30.00 |
$17.80 |
$48.00 |
$50.00 |
| 710 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 10,260 | SD |
$0.4000 |
$0.5000 |
$1.10 |
$0.5100 |
$0.5500 |
| 720 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,620 | SD |
$0.6000 |
$2.50 |
$1.10 |
$2.60 |
$2.75 |
| 730 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,320 | SD |
$1.60 |
$2.00 |
$1.10 |
$2.10 |
$2.25 |
| 740 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,960 | SD |
$0.7500 |
$0.5000 |
$1.35 |
$0.5200 |
$0.5500 |
| 750 | 880(C)6420 |
WING BARRICADES | 2,520 | SD |
$2.00 |
$0.1000 |
$0.0200 |
$0.1100 |
$0.1200 |
| 760 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 6,480 | SD |
$0.2500 |
$0.7500 |
$0.3800 |
$0.8000 |
$1.00 |
| 770 | 880(F)6700 |
DRUMS | 2,700 | SD |
$0.2000 |
$0.2500 |
$0.0200 |
$0.2600 |
$0.3000 |
| 780 | 880(G)6805 |
CHANNELIZER CONES | 13,920 | SD |
$0.2500 |
$0.1500 |
$0.0500 |
$0.1600 |
$0.1700 |
| 790 | 880(I)7000 |
FLAGGER | 60 | SD |
$167.00 |
$1,200.00 |
$417.00 |
$525.00 |
$250.00 |
| 800 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 582 | SD |
$11.00 |
$15.00 |
$17.50 |
$16.00 |
$20.00 |
| 810 | 413(F)4700 |
SINUSOIDAL RUMBLE STRIP | 90,450 | LF |
$0.3500 |
$0.3500 |
$0.3800 |
$0.2500 |
$0.3000 |
| 820 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 30 | EA |
$65.00 |
$75.00 |
$104.00 |
$75.00 |
$100.00 |
| 830 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$210.00 |
$500.00 |
$246.00 |
$500.00 |
$750.00 |
| 840 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 276.4 | SF |
$23.00 |
$19.00 |
$30.60 |
$20.00 |
$22.00 |
| 850 | 851(C)2415 |
2" SQUARE TUBE POST | 461 | LF |
$9.40 |
$9.00 |
$7.65 |
$9.50 |
$12.00 |
| 860 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 83,320 | LF |
$0.5500 |
$0.4800 |
$0.5400 |
$0.5000 |
$0.5500 |
| 870 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 400 | LF |
$2.15 |
$1.00 |
$2.20 |
$1.05 |
$1.25 |
| 880 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 70 | LF |
$7.40 |
$2.00 |
$6.55 |
$2.05 |
$2.50 |
| 890 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 6 | EA |
$140.00 |
$150.00 |
$301.00 |
$155.00 |
$200.00 |
| 900 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$109,000.00 |
$73,120.00 |
$95,000.00 |
$10,000.00 |
| 910 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$70,000.00 |
$5,468.00 |
$5,000.00 |
$2,500.00 |
| 920 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$500,000.00 |
$463,000.00 |
$116,533.70 |
$510,000.00 |
$350,000.00 |