Bid tab 260144

Let Jun 18, 2026 · Division 3 · Cleveland

‹ Jun 2026 results

Grade, Drain, Bridge, And Surface

Let date
Thursday, June 18, 2026
Contract
260144 · job page
J/P numbers
20266(14)
District
Division 3
County
Cleveland
Highway
SH-9
Limits
SH-9: FROM 7.7 MILES EAST OF THE US-77 INTERCHANGE, EXTEND EAST IN THE CITY OF NORMAN.
Classification
Grade, Drain, Bridge, And Surface ·
Project number
STP-241B(195)PM
Working days
505

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Haskell Lemon Group, LLC Low bidder $33,388,900
2 T.J. CAMPBELL CONSTRUCTION COMPANY $36,298,879 +8.7%
3 Silver Star Construction Company, Inc. $37,543,043 +12.4%
4 ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) $43,517,025 +30.3%

Bid tab: unit prices 160 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Haskell Lemon G…#2 T.J. CAMPBELL C…#3 Silver Star Con…#4 ALLEN CONTRACTI…
10201(A)1200 CLEARING AND GRUBBING1LSUM $110,000.00 $160,000.00 $295,000.00 $218,000.00 $250,961.26
20202(A)2200 UNCLASSIFIED EXCAVATION223,066CY $12.00 $5.35 $6.05 $6.00 $7.99
30202(D)2500 UNCLASSIFIED BORROW121,656CY $13.00 $6.90 $8.50 $6.35 $10.52
40205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $165,000.00 $305,500.00 $260,000.00 $225,000.00 $151,352.52
50210 0100 OBLITERATING ABANDONED ROAD150LF $30.00 $10.60 $20.00 $250.00 $17.74
60221(B)2300 TEMPORARY SILT FENCE21,528LF $5.00 $3.65 $3.75 $3.00 $4.07
70221(E)2600 TEMPORARY SILT DIKE2,806LF $15.00 $18.70 $18.50 $18.50 $20.65
80221(F)2710 TEMPORARY ROCK FILTER DAM TYPE 2468CY $270.00 $260.00 $160.00 $195.79 $431.96
90221(G)2800 TEMPORARY FIBER LOG7,721LF $8.00 $5.20 $5.15 $5.50 $5.74
100221(K)3202 TEMPORARY SEDIMENT CONTROL DEVICE2,000LF $10.00 $7.80 $8.25 $6.00 $9.18
110230(A)7200 SOLID SLAB SODDING269,178SY $4.25 $3.40 $3.70 $4.10 $3.84
120233(A)0200 VEGETATIVE MULCHING156.9AC $1,500.00 $1,040.00 $2,600.00 $1,835.00 $2,867.61
130233(D)0500 EXCELSIOR MAT1,000SY $35.00 $20.80 $4.25 $42.00 $4.33
140241 3100 MOWING110.82AC $325.00 $208.00 $1,150.00 $300.00 $1,261.75
150303(A)1200 AGGREGATE BASE TYPE A52,082CY $72.00 $45.00 $75.00 $81.50 $93.06
160307(K)4200 STABILIZED SUBGRADE279,886SY $8.00 $6.10 $5.25 $6.00 $6.45
170325 0100 SEPARATOR FABRIC250,848SY $2.50 $2.50 $1.75 $1.60 $1.76
180402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E21,054TON $46.00 $39.00 $36.00 $41.00 $55.02
190405 5100 PERMEABLE FRICTION COURSE3,173TON $175.00 $152.50 $157.00 $175.00 $202.81
200407(A)7200 FOG SEAL250GAL $6.00 $0.1000 $6.00 $7.00 $4.83
210407(B)7300 TACK COAT50,861GAL $4.50 $3.00 $3.35 $2.35 $3.96
220408 8100 PRIME COAT159,505GAL $5.00 $0.0100 $0.5500 $5.00 $1.01
230411(B)1300 SUPERPAVE, TYPE S3(PG 76-28 OK)7,768TON $133.00 $107.50 $106.00 $111.00 $139.53
240411(B)1320 SUPERPAVE, TYPE S3(PG 70-28 OK)22,673TON $125.00 $106.00 $103.00 $109.00 $138.71
250411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)69,944TON $110.00 $101.50 $93.00 $99.00 $119.58
260411(C)1420 SUPERPAVE, TYPE S4(PG 70-28 OK)17,660TON $145.00 $120.00 $118.00 $124.00 $155.38
270411(C)1430 SUPERPAVE, TYPE S4(PG 64-22 OK)9,416TON $142.00 $105.00 $98.00 $113.00 $131.49
280411(E)1600 SUPERPAVE, TYPE S6(PG 76-28 OK)2,621TON $175.00 $137.50 $125.00 $140.00 $160.09
290412 3100 COLD MILLING PAVEMENT7,788SY $4.00 $7.05 $4.50 $2.75 $7.95
300501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED118.01CY $39.00 $26.50 $20.00 $30.00 $20.71
310509(A)0200 CLASS AA CONCRETE426.62CY $725.00 $537.50 $800.00 $615.00 $864.31
320509(D)0500 CLASS C CONCRETE3,125.12CY $475.00 $335.00 $325.00 $380.00 $430.14
330511(A)2200 REINFORCING STEEL60,391.63LB $1.65 $1.45 $1.15 $1.70 $1.08
340601(A)1100 TYPE I PLAIN RIPRAP533TON $75.00 $77.20 $90.00 $88.00 $105.30
350609(B)4370 2'-8" COMB.CRB.& GUT.(6" MNTBLE)996LF $38.00 $30.50 $48.00 $50.00 $46.82
360611(A)7220 MANHOLE (6' DIA.)1EA $9,500.00 $6,457.00 $11,000.00 $7,500.00 $6,679.01
370611(B)7310 ADD'L.DEPTH IN MANHOLE (6' DIA.)6VF $650.00 $901.50 $2,800.00 $1,100.00 $670.20
380611(G)7930 INLET GPI TYPE 1 (DES. 1)1EA $5,250.00 $4,290.00 $6,000.00 $5,000.00 $4,105.53
390611(G)7962 INLET GPI TYPE 2 (DES. 9)2EA $6,700.00 $9,170.00 $11,000.00 $10,600.00 $5,318.93
400611(G)9012 INLET CDI RCP DES. 41EA $6,000.00 $5,175.00 $8,000.00 $6,000.00 $4,308.46
410611(G)9062 INLET CDI 30SK RCP DES.41EA $6,000.00 $5,535.00 $8,000.00 $6,400.00 $4,308.46
420611(H)0742 ADD'L DEPTH IN INLET CDI RCP 30SK DES. 412VF $725.00 $636.50 $625.00 $735.00 $670.16
430613(A)5216 24" R.C.PIPE CLASS III370LF $130.00 $90.50 $98.00 $105.00 $106.21
440613(A)5220 30" R.C.PIPE CLASS III340LF $170.00 $108.00 $135.00 $125.00 $143.62
450613(A)5224 36" R.C.PIPE CLASS III568LF $210.00 $156.50 $140.00 $181.00 $174.77
460613(A)5228 42" R.C.PIPE CLASS III72LF $250.00 $192.00 $280.00 $225.00 $238.95
470613(A)5232 48" R.C.PIPE CLASS III90LF $330.00 $257.50 $340.00 $300.00 $276.10
480613(A)5358 28" X 18" R.C.PIPE ARCH CLASS A-III95LF $165.00 $120.00 $135.00 $140.00 $164.85
490613(A)5366 36" X 22" R.C.PIPE ARCH CLASS A-III168LF $210.00 $182.50 $185.00 $215.00 $192.46
500613(A)5428 53" X 83" R.C.PIPE ELL. CLASS HE-III125LF $340.00 $309.50 $950.00 $360.00 $819.94
510613(B)5508 18" CORR. GALV. STEEL PIPE185LF $73.00 $47.70 $64.00 $49.00 $81.90
520613(B)5516 24" CORR. GALV. STEEL PIPE204LF $68.00 $93.30 $70.00 $68.00 $105.79
530613(B)5604 21" X 15" CORR. GALV. STEEL PIPE ARCH50LF $75.00 $43.50 $90.00 $62.00 $66.47
540613(B)5620 42" X 29" CORR. GALV. STEEL PIPE ARCH46LF $130.00 $95.40 $130.00 $111.00 $108.94
550613(H)6200 6" PERFORATED PIPE UNDERDRAIN ROUND1,000LF $32.00 $21.20 $30.00 $19.00 $44.76
560613(I)6305 6" NON-PERF.PIPE UNDERDRAIN RND.400LF $28.00 $21.20 $30.00 $19.00 $44.76
570613(J)6400 EDGE DRAIN CONDUIT-PERFORATED1,200LF $25.00 $26.50 $18.00 $19.00 $24.31
580613(K)6500 EDGE DRAIN OUTLET LATERAL-NONPERFORATED200LF $30.00 $26.50 $18.00 $19.00 $24.31
590613(L)6708 18" PREFAB. CULVERT END SEC., ROUND2EA $1,500.00 $1,030.00 $1,400.00 $1,200.00 $974.55
600613(L)6716 24" PREFAB. CULVERT END SEC., ROUND7EA $1,500.00 $1,230.00 $1,400.00 $1,500.00 $1,973.37
610613(L)6724 30" PREFAB. CULVERT END SEC., ROUND2EA $2,000.00 $1,769.00 $2,000.00 $2,100.00 $2,323.28
620613(L)6728 36" PREFAB. CULVERT END SEC., ROUND6EA $2,500.00 $2,267.00 $2,400.00 $2,700.00 $3,695.98
630613(L)6732 42" PREFAB. CULVERT END SEC., ROUND2EA $4,000.00 $4,689.00 $5,000.00 $5,500.00 $4,644.06
640613(L)6736 48" PREFAB. CULVERT END SEC., ROUND2EA $3,600.00 $4,973.00 $5,600.00 $5,800.00 $5,600.24
650613(L)6832 53" X 83" PREFAB. CULVERT END SEC., ELLI2EA $5,000.00 $5,716.00 $8,000.00 $6,600.00 $11,071.13
660613(M)6960 TYPE A4 CULVERT END TREATMENT6EA $2,300.00 $1,613.00 $1,650.00 $1,900.00 $1,895.20
670613(M)6964 TYPE B4 CULVERT END TREATMENT11EA $2,400.00 $2,133.00 $2,150.00 $2,500.00 $2,273.18
680613(M)6968 TYPE C4 CULVERT END TREATMENT2EA $3,400.00 $2,632.00 $2,650.00 $3,100.00 $3,265.03
690613(M)6972 TYPE D4 CULVERT END TREATMENT4EA $3,900.00 $3,174.00 $3,200.00 $3,700.00 $3,906.58
700613(M)7004 TYPE A6 CULVERT END TREATMENT2EA $2,900.00 $2,483.00 $2,450.00 $2,900.00 $2,570.85
710613(M)7008 TYPE B6 CULVERT END TREATMENT5EA $3,000.00 $2,676.00 $2,700.00 $3,100.00 $3,054.72
720613(Q)7500 OUTLET LATERAL HEADWALL2EA $1,000.00 $689.50 $2,400.00 $310.00 $1,016.39
730619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $55,000.00 $68,925.00 $245,000.00 $95,000.00 $245,468.51
740619(B)6364 REMOVAL OF ASPHALT PAVEMENT123,365.67SY $8.00 $7.50 $7.50 $4.40 $4.89
750619(B)6380 REMOVAL OF CONCRETE DRIVEWAY415.56SY $19.00 $9.55 $21.00 $19.00 $17.11
760619(B)6384 REMOVAL OF ASPHALT DRIVEWAY618.33SY $15.00 $9.55 $13.50 $15.00 $10.26
770619(B)6396 REMOVAL OF GUARDRAIL458LF $8.00 $9.10 $5.50 $11.00 $10.04
780619(C)6600 SAWING PAVEMENT19,931LF $7.50 $2.05 $3.50 $3.00 $3.82
790623 1100 (PL)GUARDRAIL CURBING4EA $2,000.00 $4,000.00 $4,500.00 $1,300.00 $4,555.65
800623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE900LF $40.00 $21.80 $28.00 $26.00 $24.09
810623(G)1820 GUARDRAIL END TREATMENT (31")4EA $4,200.00 $3,900.00 $4,600.00 $4,600.00 $4,301.42
820623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $3,900.00 $3,640.00 $5,900.00 $4,300.00 $4,014.66
830624(A)3200 FENCE-STYLE WWF19,920LF $14.00 $7.00 $8.75 $9.00 $8.95
840624(B)3340 GATES-STYLE WWF (4.5'HIGH X 12'LONG)4EA $2,000.00 $1,250.00 $325.00 $1,500.00 $1,147.05
850624(B)3350 GATES-STYLE WWF (4.5'HIGH X 14'LONG)3EA $2,000.00 $1,250.00 $550.00 $1,500.00 $1,204.40
860624(B)3370 GATES-STYLE WWF (4.5'HIGH X 18' LONG)2EA $2,000.00 $1,250.00 $750.00 $1,500.00 $1,376.46
870624(C)3405 FENCE-STYLE SWF (5 BARBED WIRE)9,626LF $11.00 $7.00 $7.50 $9.00 $7.91
880624(E)3600 FENCE-STYLE CLF (4'HIGH, CLASS A)230LF $65.00 $35.40 $42.00 $42.00 $28.68
890624(E)3610 FENCE-STYLE CLF (5'HIGH, CLASS A)255LF $55.00 $45.80 $50.00 $54.00 $32.12
900624(F)3772 GATES-STYLE CLF (6'HIGH X 16'LONG)1EA $3,500.00 $1,875.00 $2,000.00 $2,300.00 $1,835.28
910629(A)7200 MAILBOX INSTALLATION-SINGLE13EA $250.00 $260.00 $225.00 $300.00 $286.76
920629(C)7400 REMOVAL OF MAILBOX INSTALLATION12EA $150.00 $98.80 $56.00 $120.00 $108.97
930202(A)2210 UNCLASSIFIED EXCAVATION2,295CY $15.00 $5.35 $16.00 $15.00 $20.73
940501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED169CY $38.00 $24.00 $29.00 $28.00 $20.73
950509(A)0210 CLASS AA CONCRETE480.9CY $850.00 $558.50 $750.00 $636.00 $861.65
960511(A)2210 REINFORCING STEEL72,050LB $1.55 $1.45 $1.10 $1.70 $1.49
970619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $42,000.00 $14,240.00 $17,000.00 $17,000.00 $34,547.91
980501(B)1300 SUBSTRUCTURE EXCAVATION COMMON330CY $40.00 $43.20 $19.00 $23.00 $30.49
990501(G)1800 CLSM BACKFILL528.8CY $270.00 $221.50 $275.00 $255.00 $295.13
1,000502 3100 TEMPORARY EARTH RETAINAGE1LSUM $120,000.00 $48,545.00 $50,000.00 $110,000.00 $55,332.44
1,010503(A)4220 PRESTRESSED CONCRETE BEAMS (TYPE II)1,640.2LF $280.00 $259.00 $280.00 $280.00 $299.00
1,020504(A)5200 APPROACH SLAB601.2SY $330.00 $297.00 $325.00 $275.00 $362.41
1,030504(B)5300 SAW-CUT GROOVING2,216.7SY $7.00 $5.20 $5.00 $7.00 $5.81
1,040504(D)5420 CONCRETE RAIL (TR4)453.4LF $125.00 $175.00 $125.00 $135.00 $170.26
1,050506(A)7200 STRUCTURAL STEEL3,360LB $7.00 $3.20 $4.50 $3.00 $7.75
1,060507(A)8200 STAINLESS STEEL FIXED BEARING ASSEMBLY20EA $3,800.00 $2,315.00 $2,400.00 $2,600.00 $2,341.30
1,070507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY40EA $3,200.00 $2,315.00 $2,400.00 $2,500.00 $2,341.40
1,080509(A)0210 CLASS AA CONCRETE424.3CY $850.00 $1,100.00 $1,100.00 $1,200.00 $1,266.61
1,090509(B)0320 CLASS A CONCRETE273.2CY $1,200.00 $1,180.00 $1,100.00 $1,200.00 $1,117.46
1,100509(D)0510 CLASS C CONCRETE15.4CY $1,100.00 $327.00 $850.00 $1,000.00 $916.70
1,110511 2100 MECHANICAL SPLICES116EA $100.00 $167.00 $135.00 $130.00 $156.36
1,120511(B)2310 EPOXY COATED REINFORCING STEEL161,170LB $1.90 $2.00 $1.75 $1.80 $1.79
1,130514(A)5220 PILES, FURNISHED (HP 12X53)2,209LF $64.00 $82.40 $84.00 $88.00 $84.47
1,140514(B)5320 PILES, DRIVEN (HP 12X53)2,209LF $25.00 $27.90 $20.00 $15.00 $32.00
1,150514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $500.00 $500.00 $500.00 $500.00 $500.00
1,160515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)1,288SY $7.00 $5.70 $10.00 $7.00 $6.39
1,170516(A)8230 DRILLED SHAFTS 48" DIAMETER680LF $1,150.00 $958.50 $1,600.00 $760.00 $1,282.91
1,180516(C)8400 CROSSHOLE SONIC LOGGING10EA $3,000.00 $4,290.00 $3,500.00 $2,400.00 $2,451.70
1,190517 9110 ELASTOMERIC COATING1,972SF $30.00 $20.80 $23.00 $22.00 $22.94
1,200518(B)0300 SEALED EXPANSION JOINTS91.3LF $450.00 $329.00 $400.00 $270.00 $350.67
1,210613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND182LF $40.00 $79.70 $52.00 $34.00 $29.90
1,220613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $40.00 $40.20 $60.00 $48.00 $27.23
1,230619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $60,000.00 $35,445.00 $90,000.00 $190,000.00 $105,798.28
1,240857(A)9205 CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE)221,210LF $0.5000 $0.1900 $0.1500 $0.2500 $0.2100
1,250857(C)9405 REMOVABLE PAVEMENT MARKING TAPE(6" WIDE)6,000LF $2.50 $1.15 $2.25 $1.40 $1.25
1,260857(E)9620 (PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-110,000EA $1.05 $0.6800 $1.10 $0.8500 $0.7500
1,270857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)75,000LF $0.5000 $0.1800 $0.1700 $0.2500 $0.1900
1,280857(F)9710 PAVEMENT MARKING REMOVAL(ARROWS)30EA $105.00 $104.00 $55.00 $150.00 $114.70
1,290871(B)2300 CONST.ZONE IMPACT ATTEN.10,985SD $22.00 $16.60 $9.00 $23.00 $21.22
1,300871(C)2410 RELOCATION OF IMPACT ATTENUATOR35EA $2,500.00 $442.00 $550.00 $530.00 $487.49
1,310877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER23,500LF $30.00 $25.00 $14.00 $30.00 $26.73
1,320877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER33,100LF $6.00 $3.20 $7.75 $4.00 $3.44
1,330880(A)6220 ARROW DISPLAY(TYPE C)1,010SD $11.00 $1.05 $9.00 $10.00 $1.15
1,340880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF21,000SD $0.6500 $2.10 $0.2700 $3.00 $2.29
1,350880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF21,000SD $1.00 $2.95 $1.10 $4.00 $3.27
1,360880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF19,000SD $2.00 $0.8800 $0.5500 $2.00 $0.9700
1,370880(C)6410 CONSTRUCTION BARRICADES(TYPE III)22,215SD $1.60 $0.1600 $0.8000 $0.2500 $0.1700
1,390880(E)6600 WARNING LIGHTS(TYPE A)63,000SD $0.9000 $0.0500 $0.5500 $0.0500 $0.0200
1,400880(F)6700 DRUMS22,000SD $0.5000 $0.6800 $1.10 $1.00 $0.7500
1,410882(A)8210 PORT.CHANGEABLE MESSAGE SIGN1,010SD $25.00 $10.40 $10.00 $15.00 $11.47
1,420413(A)4200 RUMBLE STRIP-METHOD HMA-CON40,390LF $0.8000 $0.2100 $0.2800 $0.2500 $0.2300
1,430413(B)4310 RUMBLE STRIP-METHOD HMA-CYC48,294LF $0.3500 $0.2100 $0.2800 $0.2500 $0.2300
1,440804(A)2200 STRUCTURAL CONCRETE1.38CY $1,400.00 $365.00 $800.00 $2,500.00 $401.46
1,450804(B)2300 REINFORCING STEEL192LB $3.60 $2.60 $5.50 $7.00 $2.87
1,460805(A)3252 (PL)REMOVAL OF EXISTING SIGNS23EA $280.00 $98.80 $55.00 $150.00 $108.97
1,470805(D)3504 (PL)REMOVE & RESET LIGHT POLE5EA $13,000.00 $8,450.00 $8,400.00 $10,000.00 $9,050.18
1,480805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS17EA $450.00 $244.50 $325.00 $300.00 $269.56
1,490850(A)1200 SHEET ALUMINUM SIGNS788.05SF $60.00 $55.10 $36.00 $65.00 $60.79
1,500851(B)2315 3"@7.58 GALV.STL.PIPE POST84LF $40.00 $31.20 $27.00 $40.00 $34.41
1,510851(C)2415 2" SQUARE TUBE POST1,401LF $15.50 $7.30 $11.00 $9.00 $8.03
1,520853 5100 DELINEATORS(TYPE 1, CODE 1)30EA $60.00 $16.60 $55.00 $90.00 $83.73
1,530853 5125 DELINEATORS(TYPE 2, CODE 3)8EA $60.00 $75.90 $55.00 $90.00 $83.73
1,540856(A)8207 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE)133,445LF $1.50 $0.6500 $0.7000 $0.7500 $0.6900
1,550856(A)8215 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE)6,554LF $3.75 $2.30 $3.25 $2.80 $2.52
1,560856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)183LF $17.00 $9.90 $11.00 $12.00 $10.90
1,570856(B)8307 (SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS)84EA $300.00 $205.00 $170.00 $250.00 $229.41
1,580880(C)6425 PERMANENT BARRICADE UNIT3EA $500.00 $1,325.00 $1,300.00 $1,600.00 $1,462.48
1,590642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $100,000.00 $93,250.00 $375,000.00 $150,000.00 $122,921.93
1,600220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $20,000.00 $8,850.00 $76,000.00 $44,000.00 $32,246.63
1,610641 2110 MOBILIZATION1LSUM $1,500,000.00 $997,887.48