| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$70,153.14 |
$120,000.00 |
$290,000.00 |
$113,718.40 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 113,609 | CY |
$8.00 |
$8.65 |
$11.50 |
$11.75 |
$11.96 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 35,594 | CY |
$10.00 |
$8.00 |
$20.10 |
$10.50 |
$19.93 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$45,000.00 |
$128,000.01 |
$150,000.00 |
$95,000.00 |
$107,662.07 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,756 | LF |
$3.00 |
$2.82 |
$2.85 |
$2.75 |
$2.99 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,162 | LF |
$13.00 |
$13.52 |
$13.80 |
$14.00 |
$14.35 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 235,924 | SY |
$2.50 |
$2.74 |
$2.85 |
$2.90 |
$2.99 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 49 | AC |
$1,000.00 |
$1,125.00 |
$1,150.00 |
$1,170.00 |
$1,196.25 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 49 | AC |
$1,000.00 |
$1,125.00 |
$1,150.00 |
$1,170.00 |
$1,196.25 |
| 100 | 241 3100 |
MOWING | 98 | AC |
$150.00 |
$168.94 |
$172.50 |
$175.00 |
$179.44 |
| 101 | 242 4100 |
(PL)STABILIZED CONSTRUCTION EXIT | 3 | EA |
$2,800.00 |
$2,600.00 |
$5,174.00 |
$3,900.00 |
$4,833.11 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 70,660 | SY |
$7.00 |
$6.31 |
$6.90 |
$6.00 |
$7.18 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,850 | TON |
$35.00 |
$48.10 |
$48.30 |
$58.00 |
$50.24 |
| 130 | 407(B)7300 |
TACK COAT | 15,123 | GAL |
$3.00 |
$3.00 |
$3.05 |
$5.00 |
$4.08 |
| 140 | 408 8100 |
PRIME COAT | 27,318 | GAL |
$3.00 |
$3.00 |
$7.40 |
$2.60 |
$5.45 |
| 150 | 409(A)9200 |
FABRIC REINFORCEMENT | 746 | SY |
$2.00 |
$6.49 |
$12.50 |
$5.00 |
$10.76 |
| 160 | 409(B)9300 |
BITUMINOUS BINDER | 150 | GAL |
$8.00 |
$14.16 |
$14.10 |
$31.00 |
$17.69 |
| 170 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 6,532 | TON |
$85.00 |
$98.00 |
$106.50 |
$111.00 |
$120.82 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 37,821 | TON |
$85.00 |
$92.85 |
$102.50 |
$101.00 |
$104.46 |
| 190 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,355 | TON |
$100.00 |
$108.00 |
$125.00 |
$127.00 |
$137.48 |
| 200 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,620 | TON |
$105.00 |
$101.00 |
$115.50 |
$126.00 |
$113.77 |
| 210 | 412 3100 |
COLD MILLING PAVEMENT | 2,238 | SY |
$3.00 |
$3.75 |
$12.40 |
$5.50 |
$9.17 |
| 211 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 331 | CY |
$30.00 |
$33.79 |
$46.00 |
$32.00 |
$53.83 |
| 220 | 509(A)0200 |
CLASS AA CONCRETE | 1,045 | CY |
$500.00 |
$475.00 |
$669.00 |
$590.00 |
$693.82 |
| 221 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 0.99 | CY |
$475.00 |
$2,100.00 |
$2,000.00 |
$8,000.00 |
$1,495.30 |
| 230 | 509(D)0500 |
CLASS C CONCRETE | 1,686 | CY |
$300.00 |
$265.00 |
$368.00 |
$375.00 |
$358.87 |
| 240 | 511(A)2200 |
REINFORCING STEEL | 154,208 | LB |
$1.25 |
$1.80 |
$1.45 |
$1.15 |
$1.58 |
| 250 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$15,000.00 |
$45,000.00 |
$120,740.00 |
$110,000.00 |
$10,168.09 |
| 260 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 114 | TON |
$50.00 |
$78.84 |
$174.50 |
$110.00 |
$100.78 |
| 270 | 611(G)0350 |
INLET (SMD-TYPE 1) | 1 | EA |
$3,500.00 |
$3,275.00 |
$4,830.00 |
$5,700.00 |
$4,725.17 |
| 280 | 611(G)8000 |
INLET CDI RCB DES. 1 | 1 | EA |
$3,200.00 |
$3,300.00 |
$2,300.00 |
$7,300.00 |
$5,365.16 |
| 290 | 611(L)1600 |
JUNCTION BOXES | 23 | CF |
$100.00 |
$285.00 |
$135.50 |
$330.00 |
$117.23 |
| 300 | 613(A)5216 |
24" R.C.PIPE CLASS III | 79 | LF |
$80.00 |
$110.00 |
$138.00 |
$137.00 |
$87.62 |
| 310 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 272 | LF |
$120.00 |
$180.00 |
$172.50 |
$144.00 |
$170.35 |
| 320 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 58 | LF |
$160.00 |
$326.62 |
$345.00 |
$234.00 |
$209.34 |
| 330 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 1,988 | LF |
$50.00 |
$51.81 |
$63.50 |
$72.00 |
$59.27 |
| 340 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 274 | LF |
$40.00 |
$68.70 |
$77.60 |
$97.00 |
$80.15 |
| 350 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 766 | LF |
$40.00 |
$51.81 |
$63.80 |
$85.00 |
$61.61 |
| 360 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 342 | LF |
$40.00 |
$73.21 |
$78.80 |
$90.00 |
$79.37 |
| 370 | 613(B)5616 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 306 | LF |
$50.00 |
$90.10 |
$93.70 |
$106.00 |
$98.09 |
| 380 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 1,000 | LF |
$30.00 |
$28.16 |
$20.10 |
$22.00 |
$35.89 |
| 390 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 500 | LF |
$30.00 |
$28.16 |
$20.10 |
$27.00 |
$35.89 |
| 400 | 613(L)6620 |
28" X 18" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$1,200.00 |
$2,928.34 |
$2,214.00 |
$1,225.00 |
$1,704.65 |
| 410 | 613(L)6624 |
28" X 20" PREFAB. CULVERT END SEC., ARCH | 12 | EA |
$800.00 |
$732.09 |
$431.00 |
$700.00 |
$538.31 |
| 420 | 613(L)6632 |
35" X 24" PREFAB. CULVERT END SEC., ARCH | 12 | EA |
$1,000.00 |
$563.14 |
$632.50 |
$885.00 |
$765.60 |
| 430 | 613(L)6648 |
43" X 26" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,500.00 |
$6,757.72 |
$4,456.00 |
$2,500.00 |
$3,241.83 |
| 440 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 24 | EA |
$700.00 |
$506.83 |
$690.00 |
$650.00 |
$412.71 |
| 450 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 10 | EA |
$900.00 |
$732.09 |
$920.00 |
$775.00 |
$610.09 |
| 460 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 7 | EA |
$1,400.00 |
$1,013.66 |
$2,470.00 |
$2,500.00 |
$1,579.04 |
| 470 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 3 | EA |
$1,600.00 |
$1,351.54 |
$2,754.00 |
$2,800.00 |
$1,878.11 |
| 480 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 7 | EA |
$1,700.00 |
$1,238.91 |
$2,982.00 |
$3,000.00 |
$2,153.24 |
| 490 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 3 | EA |
$1,800.00 |
$1,689.43 |
$3,409.00 |
$3,500.00 |
$2,607.81 |
| 500 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 3 | EA |
$500.00 |
$1,126.29 |
$948.50 |
$6,900.00 |
$598.12 |
| 510 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$40,000.00 |
$39,419.99 |
$103,490.00 |
$155,000.00 |
$129,792.61 |
| 520 | 619(B)6300 |
REMOVAL OF HEADWALL | 9 | EA |
$1,300.00 |
$2,815.71 |
$1,322.00 |
$1,350.00 |
$1,256.06 |
| 530 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 36,538 | SY |
$4.50 |
$3.01 |
$7.60 |
$5.75 |
$6.31 |
| 540 | 619(C)6600 |
SAWING PAVEMENT | 1,776 | LF |
$3.50 |
$3.94 |
$5.40 |
$5.00 |
$7.52 |
| 550 | 624(A)3200 |
FENCE-STYLE WWF | 317 | LF |
$8.00 |
$12.61 |
$10.90 |
$15.00 |
$28.30 |
| 560 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 13,979 | LF |
$6.50 |
$10.31 |
$8.90 |
$12.00 |
$7.62 |
| 570 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 19 | EA |
$110.00 |
$337.89 |
$345.00 |
$175.00 |
$358.87 |
| 580 | 629(B)7300 |
MAILBOX INSTALLATION-MULTIPLE | 2 | EA |
$250.00 |
$422.36 |
$431.00 |
$350.00 |
$448.59 |
| 590 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 27 | EA |
$25.00 |
$50.68 |
$51.70 |
$115.00 |
$53.83 |
| 600 | 629(E)7600 |
MAILBOX | 27 | EA |
$45.00 |
$39.42 |
$40.30 |
$117.00 |
$41.87 |
| 610 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 2,000 | LF |
$0.1500 |
$2.32 |
$2.35 |
$1.15 |
$2.46 |
| 620 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 500 | SD |
$7.30 |
$9.01 |
$9.20 |
$16.00 |
$9.57 |
| 630 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 200 | LF |
$25.00 |
$57.44 |
$58.60 |
$13.50 |
$29.37 |
| 640 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,800 | LF |
$5.50 |
$8.67 |
$8.85 |
$40.00 |
$12.32 |
| 650 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 32,500 | SD |
$0.3500 |
$0.0200 |
$0.0300 |
$0.3500 |
$0.0200 |
| 660 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 16,500 | SD |
$0.7000 |
$0.0200 |
$0.0300 |
$0.7000 |
$0.0200 |
| 670 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 13,500 | SD |
$1.35 |
$0.0200 |
$0.0300 |
$1.35 |
$0.0200 |
| 680 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 1,250 | SD |
$2.00 |
$0.1700 |
$0.1700 |
$3.25 |
$0.1800 |
| 690 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,000 | SD |
$1.50 |
$7.88 |
$8.05 |
$2.50 |
$8.37 |
| 700 | 880(C)6420 |
WING BARRICADES | 1,000 | SD |
$1.35 |
$0.0200 |
$3.00 |
$0.5500 |
$0.0200 |
| 710 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 7,000 | SD |
$0.3000 |
$0.7900 |
$0.8000 |
$4.00 |
$0.8400 |
| 720 | 880(F)6700 |
DRUMS | 19,800 | SD |
$0.2500 |
$0.0200 |
$0.0300 |
$1.15 |
$0.0200 |
| 730 | 880(G)6805 |
CHANNELIZER CONES | 8,100 | SD |
$0.3000 |
$0.0200 |
$0.0300 |
$1.15 |
$0.0200 |
| 740 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 528 | SD |
$16.00 |
$28.16 |
$28.80 |
$35.00 |
$29.91 |
| 750 | 413(F)4700 |
SINUSOIDAL RUMBLE STRIP | 30,100 | LF |
$0.2000 |
$0.1600 |
$0.1600 |
$0.7500 |
$0.1700 |
| 760 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 21 | EA |
$60.00 |
$140.79 |
$143.50 |
$375.00 |
$149.53 |
| 770 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$350.00 |
$253.41 |
$258.50 |
$1,100.00 |
$269.16 |
| 780 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 221.14 | SF |
$21.50 |
$42.80 |
$43.70 |
$50.00 |
$45.46 |
| 790 | 851(C)2415 |
2" SQUARE TUBE POST | 455 | LF |
$9.50 |
$7.88 |
$8.05 |
$11.00 |
$8.37 |
| 800 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 54,000 | LF |
$0.6000 |
$0.8100 |
$0.8300 |
$0.9000 |
$0.8600 |
| 810 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$76,944.71 |
$73,400.00 |
$118,000.00 |
$75,973.54 |
| 820 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$17,007.44 |
$6,500.00 |
$106,000.00 |
$8,821.17 |
| 830 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$12,448.81 |
$5,749.00 |
$135,000.00 |
$10,766.21 |
| 840 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$430,000.00 |
$380,000.00 |
$583,880.68 |
$590,000.00 |
$594,806.28 |