| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$300,000.00 |
$196,000.00 |
$200,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 149,942 | CY |
$8.00 |
$6.95 |
$9.20 |
$10.50 |
| 30 | 202(B)2300 |
MUCK EXCAVATION | 100 | CY |
$15.00 |
$10.00 |
$20.00 |
$19.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 2,000 | CY |
$14.00 |
$10.00 |
$9.00 |
$20.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$80,000.00 |
$261,000.00 |
$197,000.00 |
$165,000.00 |
| 60 | 210 0100 |
OBLITERATING ABANDONED ROAD | 10,700 | LF |
$7.00 |
$8.25 |
$18.00 |
$17.00 |
| 70 | 221(B)2300 |
TEMPORARY SILT FENCE | 18,865 | LF |
$3.00 |
$2.46 |
$2.65 |
$2.75 |
| 80 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 41 | EA |
$235.00 |
$294.00 |
$300.00 |
$325.00 |
| 90 | 221(E)2600 |
TEMPORARY SILT DIKE | 5,360 | LF |
$10.00 |
$11.89 |
$13.00 |
$13.00 |
| 100 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 200 | CY |
$150.00 |
$200.00 |
$300.00 |
$130.00 |
| 110 | 230(A)7200 |
SOLID SLAB SODDING | 228,901 | SY |
$3.00 |
$2.84 |
$3.15 |
$3.25 |
| 120 | 232(A)9200 |
SEEDING METHOD A | 47.29 | AC |
$900.00 |
$998.00 |
$1,000.00 |
$1,100.00 |
| 130 | 233(A)0200 |
VEGETATIVE MULCHING | 47.29 | AC |
$715.00 |
$1,150.00 |
$1,250.00 |
$1,300.00 |
| 140 | 241 3100 |
MOWING | 94.58 | AC |
$140.00 |
$179.00 |
$200.00 |
$185.00 |
| 150 | 303(A)1210 |
AGGREGATE BASE TYPE A, PLANT MIXED | 22,219 | CY |
$65.00 |
$68.00 |
$98.00 |
$85.00 |
| 160 | 307(K)4200 |
STABILIZED SUBGRADE | 123,215 | SY |
$7.00 |
$5.25 |
$7.50 |
$5.50 |
| 170 | 325 0100 |
SEPARATOR FABRIC | 118,695 | SY |
$1.30 |
$2.00 |
$1.50 |
$1.50 |
| 180 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,995 | TON |
$30.00 |
$33.00 |
$42.69 |
$33.00 |
| 190 | 407(B)7300 |
TACK COAT | 18,547 | GAL |
$3.00 |
$3.50 |
$4.00 |
$3.50 |
| 200 | 408 8100 |
PRIME COAT | 70,586 | GAL |
$3.00 |
$4.60 |
$5.00 |
$2.65 |
| 210 | 409(A)9200 |
FABRIC REINFORCEMENT | 6,474 | SY |
$4.30 |
$5.05 |
$3.55 |
$2.00 |
| 220 | 409(B)9300 |
BITUMINOUS BINDER | 1,619 | GAL |
$5.20 |
$4.25 |
$6.20 |
$13.00 |
| 230 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 12,027 | TON |
$105.00 |
$118.10 |
$130.00 |
$131.00 |
| 240 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 30,734 | TON |
$100.00 |
$92.10 |
$119.00 |
$118.00 |
| 250 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,417 | TON |
$115.00 |
$119.10 |
$142.00 |
$147.00 |
| 260 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,673 | TON |
$110.00 |
$97.10 |
$136.00 |
$131.00 |
| 270 | 412 3100 |
COLD MILLING PAVEMENT | 24,756 | SY |
$4.00 |
$2.20 |
$2.10 |
$2.00 |
| 280 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 283 | CY |
$28.50 |
$42.00 |
$43.50 |
$47.00 |
| 290 | 501(G)1810 |
CLSM BACKFILL | 30 | CY |
$180.00 |
$150.00 |
$156.00 |
$210.00 |
| 300 | 509(A)0200 |
CLASS AA CONCRETE | 813 | CY |
$650.00 |
$590.00 |
$650.00 |
$890.00 |
| 310 | 509(D)0500 |
CLASS C CONCRETE | 1,012 | CY |
$350.00 |
$335.00 |
$350.00 |
$400.00 |
| 320 | 511(A)2200 |
REINFORCING STEEL | 117,604 | LB |
$1.50 |
$1.35 |
$1.40 |
$1.75 |
| 330 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$20,000.00 |
$7,500.00 |
$7,600.00 |
$23,000.00 |
| 340 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 2,657 | TON |
$57.00 |
$86.50 |
$61.00 |
$89.00 |
| 350 | 601(F)1610 |
TYPE IV GROUTED RIPRAP | 350 | SY |
$125.00 |
$122.00 |
$112.00 |
$130.00 |
| 360 | 609(B)4335 |
1'-8" COMB.CRB.& GUT.(6" MNTBLE) | 3,636 | LF |
$20.00 |
$22.90 |
$29.00 |
$31.00 |
| 370 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 90 | SY |
$60.00 |
$86.00 |
$100.00 |
$110.00 |
| 380 | 611(A)7210 |
MANHOLE (4' DIA.) | 1 | EA |
$3,200.00 |
$2,750.00 |
$2,845.00 |
$4,700.00 |
| 390 | 611(A)7220 |
MANHOLE (6' DIA.) | 1 | EA |
$5,400.00 |
$5,200.00 |
$5,300.00 |
$8,300.00 |
| 400 | 611(B)7300 |
ADD'L.DEPTH IN MANHOLE (4' DIA.) | 10.93 | VF |
$275.00 |
$180.00 |
$185.00 |
$460.00 |
| 410 | 611(B)7310 |
ADD'L.DEPTH IN MANHOLE (6' DIA.) | 13.47 | VF |
$330.00 |
$410.00 |
$424.00 |
$975.00 |
| 420 | 611(G)0264 |
INLET W/SMALL JCT. BOX, CI, DES.2 | 11 | EA |
$6,100.00 |
$7,680.00 |
$7,950.00 |
$9,500.00 |
| 430 | 611(G)0268 |
INLET W/SMALL JCT. BOX, CI, DES.2(B) | 2 | EA |
$7,500.00 |
$11,215.00 |
$11,600.00 |
$13,000.00 |
| 440 | 611(G)0350 |
INLET (SMD-TYPE 1) | 9 | EA |
$3,000.00 |
$4,500.00 |
$4,800.00 |
$5,900.00 |
| 450 | 611(G)8032 |
INLET CDI RCB DES. 9 | 1 | EA |
$6,500.00 |
$5,210.00 |
$5,400.00 |
$6,900.00 |
| 460 | 611(G)8086 |
INLET CDI 30SK RCB DES. 5 | 1 | EA |
$5,000.00 |
$4,350.00 |
$4,500.00 |
$6,400.00 |
| 470 | 611(H)0920 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2 | 32.9 | VF |
$325.00 |
$1,060.00 |
$1,100.00 |
$1,200.00 |
| 480 | 611(H)0924 |
ADD'L DEPTH IN INLET W/SJB, CI, DES. 2(B) | 5.98 | VF |
$600.00 |
$1,060.00 |
$1,100.00 |
$1,400.00 |
| 490 | 613(A)5208 |
18" R.C.PIPE CLASS III | 1,526 | LF |
$60.00 |
$64.80 |
$69.50 |
$110.00 |
| 500 | 613(A)5216 |
24" R.C.PIPE CLASS III | 493 | LF |
$95.00 |
$86.10 |
$89.00 |
$135.00 |
| 510 | 613(A)5220 |
30" R.C.PIPE CLASS III | 140 | LF |
$100.00 |
$104.75 |
$105.00 |
$165.00 |
| 520 | 613(A)5224 |
36" R.C.PIPE CLASS III | 238 | LF |
$125.00 |
$139.00 |
$144.00 |
$184.00 |
| 530 | 613(A)5228 |
42" R.C.PIPE CLASS III | 102 | LF |
$140.00 |
$166.25 |
$172.00 |
$202.00 |
| 540 | 613(A)5408 |
24" X 38" R.C.PIPE ELL. CLASS HE-III | 120 | LF |
$150.00 |
$125.50 |
$130.00 |
$147.00 |
| 550 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 440 | LF |
$37.00 |
$52.00 |
$39.00 |
$67.00 |
| 560 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 417 | LF |
$45.27 |
$66.81 |
$45.00 |
$77.00 |
| 570 | 613(H)6200 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 2,817 | LF |
$20.00 |
$12.00 |
$15.00 |
$23.00 |
| 580 | 613(I)6305 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 200 | LF |
$20.00 |
$12.00 |
$15.00 |
$23.00 |
| 590 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 21 | EA |
$480.00 |
$500.00 |
$800.00 |
$575.00 |
| 600 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 16 | EA |
$1,050.00 |
$720.00 |
$825.00 |
$675.00 |
| 610 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 18 | EA |
$1,500.00 |
$720.00 |
$1.00 |
$1,900.00 |
| 620 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 5 | EA |
$1,800.00 |
$2,950.00 |
$3,050.00 |
$2,300.00 |
| 630 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$3,000.00 |
$4,010.00 |
$4,100.00 |
$4,000.00 |
| 640 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$2,700.00 |
$2,735.00 |
$2,830.00 |
$3,000.00 |
| 650 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 2 | EA |
$750.00 |
$750.00 |
$930.00 |
$6,900.00 |
| 660 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$40,000.00 |
$75,000.00 |
$92,001.54 |
$270,000.00 |
| 670 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 31,855 | SY |
$6.00 |
$5.25 |
$6.25 |
$5.00 |
| 680 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,515 | LF |
$4.00 |
$4.00 |
$9.50 |
$4.50 |
| 690 | 619(B)6508 |
REMOVE AND RESET CATTLE GUARD | 2 | EA |
$2,000.00 |
$3,500.00 |
$1,025.00 |
$1,900.00 |
| 700 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$30.00 |
$50.00 |
$51.00 |
$59.00 |
| 710 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 1 | EA |
$2,800.00 |
$7,000.00 |
$7,200.00 |
$8,000.00 |
| 720 | 624(A)3200 |
FENCE-STYLE WWF | 2,075 | LF |
$8.00 |
$8.10 |
$10.15 |
$11.00 |
| 730 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 21,003 | LF |
$10.00 |
$7.25 |
$7.55 |
$8.00 |
| 740 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,998 | LF |
$7.00 |
$7.50 |
$8.20 |
$9.00 |
| 750 | 624(H)3900 |
(PL) GATE | 28 | EA |
$800.00 |
$1,500.00 |
$1,550.00 |
$1,775.00 |
| 760 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 36 | EA |
$16.00 |
$20.00 |
$21.00 |
$23.00 |
| 770 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 110 | CY |
$12.00 |
$18.00 |
$18.00 |
$4.50 |
| 780 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 70 | CY |
$24.00 |
$40.00 |
$43.00 |
$35.00 |
| 790 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$20,000.00 |
$1,500.00 |
$1,550.00 |
$17,000.00 |
| 800 | 509(A)0210 |
CLASS AA CONCRETE | 132 | CY |
$600.00 |
$590.00 |
$630.00 |
$800.00 |
| 810 | 511(A)2210 |
REINFORCING STEEL | 26,560 | LB |
$1.50 |
$1.50 |
$2.00 |
$1.50 |
| 820 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$1,500.00 |
$1,650.00 |
$11,000.00 |
| 830 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 650 | CY |
$12.00 |
$18.00 |
$18.00 |
$4.50 |
| 840 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 185 | CY |
$24.00 |
$40.00 |
$42.00 |
$32.00 |
| 850 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$30,000.00 |
$1,500.00 |
$1,550.00 |
$27,000.00 |
| 860 | 509(A)0210 |
CLASS AA CONCRETE | 431.6 | CY |
$600.00 |
$525.00 |
$575.00 |
$575.00 |
| 870 | 511(A)2210 |
REINFORCING STEEL | 90,180 | LB |
$1.50 |
$1.18 |
$1.20 |
$1.50 |
| 880 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$1,500.00 |
$1,550.00 |
$11,000.00 |
| 890 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 6,932 | LF |
$0.5500 |
$1.50 |
$3.00 |
$1.75 |
| 900 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 8,792 | EA |
$0.6000 |
$1.00 |
$1.00 |
$1.40 |
| 910 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 3,700 | LF |
$0.6000 |
$1.00 |
$1.00 |
$1.10 |
| 920 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,800 | SD |
$8.00 |
$1.00 |
$8.00 |
$1.10 |
| 930 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,784 | LF |
$25.00 |
$54.00 |
$20.00 |
$24.00 |
| 940 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,491 | LF |
$5.00 |
$4.00 |
$4.00 |
$25.00 |
| 950 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,357 | SD |
$0.3000 |
$1.00 |
$1.00 |
$1.10 |
| 960 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,699 | SD |
$0.5000 |
$2.00 |
$2.25 |
$2.10 |
| 961 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,400 | SD |
$1.25 |
$2.00 |
$2.25 |
$2.10 |
| 962 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,640 | SD |
$1.75 |
$1.00 |
$1.10 |
$1.10 |
| 970 | 880(D)6500 |
VERTICAL PANELS | 7,150 | SD |
$0.2000 |
$0.5000 |
$0.6500 |
$0.5500 |
| 980 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 65,335.5 | SD |
$0.2500 |
$0.1000 |
$0.1500 |
$0.1100 |
| 990 | 880(F)6700 |
DRUMS | 51,864 | SD |
$0.1000 |
$0.1000 |
$0.1500 |
$0.1100 |
| 1,000 | 880(G)6805 |
CHANNELIZER CONES | 12,967 | SD |
$0.3000 |
$0.7500 |
$0.8500 |
$0.8000 |
| 1,010 | 880(I)7000 |
FLAGGER | 360 | SD |
$125.00 |
$125.00 |
$375.00 |
$1,150.00 |
| 1,020 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 45 | EA |
$60.00 |
$125.00 |
$126.00 |
$140.00 |
| 1,030 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$200.00 |
$400.00 |
$400.00 |
$450.00 |
| 1,040 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 238 | SF |
$23.00 |
$40.00 |
$41.00 |
$45.00 |
| 1,050 | 851(B)2310 |
2 1/2"@5.79 GALV.STL.PIPE POST | 360 | LF |
$21.00 |
$22.00 |
$22.50 |
$24.00 |
| 1,060 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 5,659 | LF |
$1.05 |
$0.6000 |
$0.6500 |
$0.6500 |
| 1,070 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 71,535 | LF |
$0.6000 |
$0.9100 |
$0.7100 |
$1.00 |
| 1,080 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 155 | LF |
$10.00 |
$25.00 |
$25.40 |
$27.00 |
| 1,090 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 4 | EA |
$200.00 |
$250.00 |
$260.00 |
$275.00 |
| 1,100 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$160,000.00 |
$118,000.00 |
$180,000.00 |
$200,000.00 |
| 1,110 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$28,000.00 |
$200,000.00 |
| 1,120 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$15,000.00 |
$10,000.00 |
$22,000.00 |
$155,000.00 |
| 1,130 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$695,000.00 |
$999,999.00 |
$825,000.00 |
$865,000.00 |