| 10 | 303(A)1200 |
AGGREGATE BASE TYPE A | 50 | CY |
$95.00 |
$260.00 |
$250.00 |
| 20 | 404(C)4400 |
ULTRA-THIN BONDED WEARING COURSE, TYPE C | 8,500 | TON |
$150.00 |
$168.00 |
$151.00 |
| 30 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 1,200 | TON |
$200.00 |
$145.00 |
$225.00 |
| 40 | 412 3100 |
COLD MILLING PAVEMENT | 150,400 | SY |
$3.00 |
$1.70 |
$2.50 |
| 50 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,000 | SY |
$4.00 |
$100.00 |
$65.00 |
| 60 | 619(C)6600 |
SAWING PAVEMENT | 1,000 | LF |
$1.75 |
$17.00 |
$13.50 |
| 70 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 97,242 | LF |
$0.1900 |
$0.0800 |
$0.1000 |
| 80 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 115,100 | LF |
$1.00 |
$0.7500 |
$0.7800 |
| 90 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 7,000 | LF |
$2.00 |
$0.7500 |
$0.7800 |
| 100 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 12,000 | EA |
$0.6500 |
$0.7500 |
$0.7500 |
| 110 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 180 | SD |
$8.00 |
$40.00 |
$39.60 |
| 120 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 180 | SD |
$9.00 |
$8.00 |
$7.95 |
| 130 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,150 | SD |
$0.5000 |
$0.0200 |
$0.0300 |
| 140 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,500 | SD |
$1.00 |
$0.0200 |
$0.0300 |
| 150 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,150 | SD |
$1.50 |
$0.0200 |
$0.0300 |
| 160 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,350 | SD |
$1.10 |
$0.0200 |
$0.0300 |
| 170 | 880(C)6420 |
WING BARRICADES | 180 | SD |
$0.5000 |
$0.0200 |
$0.0300 |
| 180 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 5,850 | SD |
$0.5000 |
$0.0200 |
$0.0300 |
| 190 | 880(F)6700 |
DRUMS | 18,000 | SD |
$0.1500 |
$0.0200 |
$0.0300 |
| 200 | 880(G)6805 |
CHANNELIZER CONES | 36,000 | SD |
$0.1500 |
$0.6000 |
$0.5700 |
| 210 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 520 | HOUR |
$69.00 |
$69.00 |
$69.00 |
| 220 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$15.00 |
$70.00 |
$65.70 |
| 230 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$7,000.00 |
$10,000.00 |
| 240 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$138,000.00 |
$143,596.40 |