| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$39,421.50 |
$60,000.00 |
$125,000.00 |
$30,000.00 |
$70,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 21,180 | CY |
$9.38 |
$7.00 |
$18.50 |
$11.00 |
$13.50 |
$13.50 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,000 | CY |
$12.04 |
$7.00 |
$10.00 |
$1.00 |
$5.00 |
$5.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3.50 |
$23,003.97 |
$65,000.00 |
$145,000.00 |
$77,500.00 |
$23,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 9,510 | LF |
$1.97 |
$2.09 |
$1.85 |
$2.10 |
$2.20 |
$1.75 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 68 | EA |
$10.00 |
$208.53 |
$225.00 |
$210.00 |
$222.00 |
$162.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 100 | LF |
$12.98 |
$15.64 |
$17.00 |
$15.75 |
$16.70 |
$8.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 16,331 | SY |
$2.58 |
$1.88 |
$2.00 |
$1.90 |
$2.00 |
$2.25 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 2 | AC |
$1,301.76 |
$1,042.64 |
$1,200.00 |
$1,050.00 |
$1,110.00 |
$720.00 |
| 100 | 241 3100 |
MOWING | 2 | AC |
$379.71 |
$104.27 |
$200.00 |
$105.00 |
$111.00 |
$200.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 31,613 | SY |
$5.31 |
$5.14 |
$6.65 |
$6.00 |
$8.90 |
$7.75 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 799 | TON |
$31.72 |
$43.45 |
$50.00 |
$41.00 |
$81.10 |
$46.00 |
| 130 | 407(B)7300 |
TACK COAT | 9,125 | GAL |
$2.32 |
$3.47 |
$4.00 |
$2.50 |
$3.00 |
$3.50 |
| 140 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,548 | TON |
$71.89 |
$87.38 |
$87.00 |
$83.00 |
$83.40 |
$100.00 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 10,848 | TON |
$67.73 |
$74.18 |
$75.50 |
$68.50 |
$78.00 |
$80.00 |
| 160 | 411(D)1520 |
SUPERPAVE, TYPE S5(PG 70-28 OK) | 2,628 | TON |
$111.17 |
$102.10 |
$100.00 |
$88.30 |
$102.50 |
$110.00 |
| 170 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 6,734 | SY |
$23.28 |
$21.86 |
$25.00 |
$21.50 |
$28.00 |
$50.00 |
| 180 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 1,770 | CY |
$145.97 |
$160.21 |
$125.00 |
$131.15 |
$185.00 |
$170.00 |
| 190 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 7 | CY |
$673.39 |
$746.46 |
$600.00 |
$1,051.00 |
$611.50 |
$525.00 |
| 200 | 509(D)0500 |
CLASS C CONCRETE | 25 | CY |
$398.02 |
$399.99 |
$365.00 |
$421.00 |
$373.50 |
$450.00 |
| 210 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 88 | TON |
$52.47 |
$85.34 |
$72.00 |
$84.00 |
$72.50 |
$90.00 |
| 220 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 28 | TON |
$42.40 |
$55.71 |
$65.00 |
$84.00 |
$66.80 |
$90.00 |
| 240 | 609(B)4375 |
2'-8" COMB.CRB.& GUT.(8" BARRIER) | 10,917 | LF |
$21.19 |
$29.00 |
$23.00 |
$23.00 |
$23.50 |
$26.00 |
| 250 | 610(A)5200 |
4" CONCRETE SIDEWALK | 2,868 | SY |
$46.58 |
$49.00 |
$57.00 |
$58.00 |
$56.40 |
$51.00 |
| 260 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 4,484 | SY |
$65.00 |
$60.00 |
$63.00 |
$80.30 |
$64.80 |
$67.00 |
| 270 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 48 | SF |
$29.96 |
$34.64 |
$50.00 |
$21.00 |
$31.70 |
$36.00 |
| 280 | 611(A)7215 |
MANHOLE (5' DIA.) | 16 | EA |
$3,787.94 |
$3,210.94 |
$3,200.00 |
$3,150.00 |
$3,273.00 |
$4,100.00 |
| 290 | 611(B)7305 |
ADD'L.DEPTH IN MANHOLE (5' DIA.) | 15 | VF |
$280.68 |
$391.79 |
$270.00 |
$420.00 |
$277.50 |
$406.00 |
| 300 | 611(G)7700 |
SPECIAL INLET DRAIN | 2 | EA |
$3,556.02 |
$3,647.05 |
$5,000.00 |
$5,260.00 |
$5,092.00 |
$11,500.00 |
| 310 | 611(G)7754 |
INLET CI DES. 2 (STD) | 12 | EA |
$3,493.98 |
$3,594.18 |
$4,300.00 |
$5,260.00 |
$4,384.00 |
$4,600.00 |
| 320 | 611(G)7758 |
INLET CI DES. 2 (B) | 4 | EA |
$4,892.95 |
$5,253.61 |
$6,200.00 |
$5,260.00 |
$6,343.00 |
$7,000.00 |
| 330 | 611(G)7766 |
INLET CI DES. 2 (D) | 4 | EA |
$6,400.00 |
$6,035.24 |
$8,700.00 |
$5,260.00 |
$8,904.00 |
$8,700.00 |
| 340 | 611(G)7774 |
INLET CI DES. 2 (B-D) | 6 | EA |
$7,400.00 |
$7,297.29 |
$10,500.00 |
$6,400.00 |
$10,660.00 |
$10,300.00 |
| 350 | 611(G)7782 |
INLET CI DES. 2 (2D) | 2 | EA |
$5,031.13 |
$8,800.27 |
$12,500.00 |
$7,400.00 |
$12,610.00 |
$12,000.00 |
| 360 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 77 | VF |
$244.59 |
$507.10 |
$400.00 |
$106.00 |
$381.50 |
$575.00 |
| 370 | 611(L)1600 |
JUNCTION BOXES | 257 | CF |
$63.73 |
$115.86 |
$115.00 |
$95.00 |
$119.00 |
$125.00 |
| 380 | 613(A)5228 |
42" R.C.PIPE CLASS III | 956 | LF |
$100.00 |
$155.98 |
$200.00 |
$221.00 |
$199.50 |
$225.00 |
| 390 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 171 | LF |
$116.83 |
$117.39 |
$130.00 |
$158.00 |
$132.50 |
$140.00 |
| 400 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 415 | LF |
$36.64 |
$54.56 |
$60.00 |
$47.50 |
$62.30 |
$60.00 |
| 410 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 224 | LF |
$38.81 |
$61.96 |
$62.00 |
$52.50 |
$63.40 |
$75.00 |
| 420 | 613(E)5900 |
18" CORRUGATED POLYETHYLENE PIPE | 2,244 | LF |
$55.00 |
$50.67 |
$75.00 |
$44.15 |
$75.90 |
$81.00 |
| 430 | 613(E)5904 |
24" CORRUGATED POLYETHYLENE PIPE | 1,065 | LF |
$65.00 |
$66.34 |
$95.00 |
$73.50 |
$96.20 |
$103.00 |
| 440 | 613(E)5908 |
30" CORRUGATED POLYETHYLENE PIPE | 228 | LF |
$75.00 |
$84.31 |
$125.00 |
$126.00 |
$131.50 |
$150.00 |
| 460 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,035.04 |
$1,073.08 |
$1,600.00 |
$525.00 |
$1,700.00 |
$980.00 |
| 470 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,970.58 |
$1,697.71 |
$4,400.00 |
$4,210.00 |
$4,521.00 |
$4,000.00 |
| 480 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$23,504.42 |
$27,000.00 |
$137,994.10 |
$27,515.00 |
$95,000.00 |
| 490 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 330 | LF |
$8.10 |
$6.93 |
$12.00 |
$11.00 |
$10.10 |
$15.00 |
| 500 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 717 | SY |
$10.99 |
$6.98 |
$11.00 |
$10.00 |
$10.10 |
$35.00 |
| 510 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 22,306 | SY |
$3.87 |
$2.24 |
$2.50 |
$4.40 |
$4.25 |
$5.00 |
| 520 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 2,792 | SY |
$8.00 |
$6.99 |
$10.00 |
$19.50 |
$10.10 |
$20.00 |
| 525 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 1,610 | SY |
$10.63 |
$6.92 |
$10.00 |
$11.00 |
$16.90 |
$20.00 |
| 530 | 619(B)6400 |
REMOVAL OF CURB | 1,466 | LF |
$5.44 |
$4.16 |
$10.00 |
$5.00 |
$10.10 |
$16.00 |
| 540 | 619(B)6404 |
REMOVAL OF SIDEWALK | 236 | SY |
$12.59 |
$10.43 |
$20.00 |
$18.40 |
$10.10 |
$25.00 |
| 550 | 619(C)6600 |
SAWING PAVEMENT | 495 | LF |
$2.70 |
$3.21 |
$7.00 |
$2.50 |
$5.60 |
$6.00 |
| 560 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 14 | EA |
$119.98 |
$105.05 |
$115.00 |
$105.00 |
$216.50 |
$120.00 |
| 570 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 14 | EA |
$18.50 |
$52.53 |
$55.00 |
$52.50 |
$50.00 |
$60.00 |
| 580 | 629(E)7600 |
MAILBOX | 14 | EA |
$42.82 |
$52.53 |
$55.00 |
$52.50 |
$33.30 |
$60.00 |
| 590 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$56,118.33 |
$45,000.00 |
$241,997.95 |
$60,000.00 |
$70,000.00 |
| 600 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 75,036 | CY |
$10.00 |
$7.00 |
$13.50 |
$9.00 |
$13.50 |
$13.00 |
| 610 | 202(D)2500 |
UNCLASSIFIED BORROW | 5,000 | CY |
$12.04 |
$7.00 |
$10.00 |
$1.00 |
$5.00 |
$3.50 |
| 620 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,500.00 |
$59,228.85 |
$150,000.00 |
$245,000.00 |
$110,000.00 |
$70,000.00 |
| 630 | 221(B)2300 |
TEMPORARY SILT FENCE | 26,812 | LF |
$1.97 |
$2.09 |
$1.85 |
$2.10 |
$2.20 |
$1.75 |
| 640 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 74 | EA |
$100.00 |
$208.53 |
$225.00 |
$210.00 |
$222.00 |
$162.00 |
| 650 | 221(E)2600 |
TEMPORARY SILT DIKE | 399 | LF |
$12.98 |
$15.64 |
$17.00 |
$16.00 |
$16.70 |
$8.00 |
| 660 | 230(A)7200 |
SOLID SLAB SODDING | 59,405 | SY |
$2.58 |
$1.88 |
$2.00 |
$1.90 |
$2.00 |
$2.25 |
| 670 | 233(A)0200 |
VEGETATIVE MULCHING | 4 | AC |
$1,301.76 |
$1,042.64 |
$1,200.00 |
$1,050.00 |
$1,110.00 |
$720.00 |
| 680 | 241 3100 |
MOWING | 4 | AC |
$379.71 |
$104.26 |
$200.00 |
$105.00 |
$111.00 |
$200.00 |
| 690 | 307(K)4200 |
STABILIZED SUBGRADE | 82,953 | SY |
$5.31 |
$5.14 |
$6.65 |
$8.50 |
$8.90 |
$6.00 |
| 700 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,147 | TON |
$31.72 |
$43.45 |
$50.00 |
$34.00 |
$81.10 |
$46.00 |
| 710 | 407(B)7300 |
TACK COAT | 25,188 | GAL |
$2.32 |
$3.47 |
$4.00 |
$2.50 |
$3.00 |
$3.50 |
| 720 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 9,399 | TON |
$71.89 |
$94.21 |
$87.00 |
$82.00 |
$83.40 |
$105.00 |
| 730 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 29,425 | TON |
$67.73 |
$79.88 |
$75.50 |
$70.50 |
$78.00 |
$80.00 |
| 740 | 411(D)1520 |
SUPERPAVE, TYPE S5(PG 70-28 OK) | 7,040 | TON |
$111.17 |
$110.21 |
$100.00 |
$85.00 |
$102.50 |
$110.00 |
| 750 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 14,550 | SY |
$23.28 |
$21.86 |
$28.00 |
$27.50 |
$28.00 |
$40.00 |
| 760 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 3,335 | CY |
$145.97 |
$160.21 |
$130.00 |
$132.00 |
$185.00 |
$170.00 |
| 770 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 105 | CY |
$29.23 |
$23.38 |
$80.00 |
$25.00 |
$40.80 |
$50.00 |
| 780 | 509(A)0200 |
CLASS AA CONCRETE | 335 | CY |
$552.30 |
$726.77 |
$515.00 |
$421.00 |
$525.50 |
$790.00 |
| 790 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 27 | CY |
$673.39 |
$142.58 |
$600.00 |
$1,050.00 |
$611.50 |
$400.00 |
| 800 | 511(A)2200 |
REINFORCING STEEL | 54,773 | LB |
$1.11 |
$0.3400 |
$1.50 |
$1.25 |
$1.45 |
$1.20 |
| 810 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 150 | TON |
$52.47 |
$85.34 |
$72.00 |
$80.00 |
$72.50 |
$85.00 |
| 820 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 48 | TON |
$42.40 |
$55.74 |
$65.00 |
$80.00 |
$66.80 |
$75.00 |
| 840 | 609(B)4375 |
2'-8" COMB.CRB.& GUT.(8" BARRIER) | 23,777 | LF |
$21.19 |
$29.00 |
$23.00 |
$23.40 |
$23.50 |
$26.00 |
| 850 | 610(A)5200 |
4" CONCRETE SIDEWALK | 6,168 | SY |
$46.58 |
$49.00 |
$57.00 |
$58.00 |
$56.40 |
$51.00 |
| 860 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 2,644 | SY |
$65.00 |
$60.00 |
$63.00 |
$80.30 |
$64.80 |
$73.00 |
| 870 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 332 | SF |
$29.96 |
$34.63 |
$50.00 |
$21.00 |
$29.40 |
$30.00 |
| 880 | 611(A)7215 |
MANHOLE (5' DIA.) | 38 | EA |
$3,787.94 |
$3,210.94 |
$3,200.00 |
$3,150.00 |
$3,273.00 |
$4,100.00 |
| 890 | 611(B)7305 |
ADD'L.DEPTH IN MANHOLE (5' DIA.) | 34 | VF |
$208.14 |
$391.83 |
$275.00 |
$420.00 |
$278.50 |
$400.00 |
| 900 | 611(G)7700 |
SPECIAL INLET DRAIN | 5 | EA |
$3,556.02 |
$3,646.74 |
$4,800.00 |
$5,255.00 |
$4,931.00 |
$11,500.00 |
| 910 | 611(G)7754 |
INLET CI DES. 2 (STD) | 25 | EA |
$3,493.98 |
$3,594.23 |
$4,300.00 |
$5,255.00 |
$4,384.00 |
$4,500.00 |
| 920 | 611(G)7758 |
INLET CI DES. 2 (B) | 8 | EA |
$4,892.95 |
$5,253.60 |
$6,200.00 |
$5,255.00 |
$6,344.00 |
$7,000.00 |
| 930 | 611(G)7766 |
INLET CI DES. 2 (D) | 19 | EA |
$6,400.00 |
$6,035.22 |
$8,700.00 |
$6,305.00 |
$8,904.00 |
$8,700.00 |
| 940 | 611(G)7774 |
INLET CI DES. 2 (B-D) | 7 | EA |
$7,400.00 |
$6,901.44 |
$10,500.00 |
$7,355.00 |
$10,660.00 |
$10,000.00 |
| 950 | 611(G)7782 |
INLET CI DES. 2 (2D) | 8 | EA |
$5,031.13 |
$8,799.69 |
$12,250.00 |
$8,405.00 |
$12,610.00 |
$12,000.00 |
| 960 | 611(G)8028 |
INLET CDI RCB DES. 8 | 1 | EA |
$10,000.00 |
$7,725.51 |
$6,300.00 |
$12,600.00 |
$6,475.00 |
$9,400.00 |
| 970 | 611(G)8065 |
SPECIAL INLET CDI RCB DES. SP-1 | 1 | EA |
$15,000.00 |
$4,417.04 |
$11,000.00 |
$13,700.00 |
$11,100.00 |
$13,000.00 |
| 980 | 611(G)8066 |
SPECIAL INLET CDI RCB DES. SP-2 | 1 | EA |
$20,000.00 |
$6,517.09 |
$9,000.00 |
$13,700.00 |
$9,358.00 |
$11,000.00 |
| 990 | 611(H)0414 |
ADD'L DEPTH IN INLET CI DES. 2 | 36 | VF |
$244.59 |
$507.09 |
$400.00 |
$160.00 |
$382.50 |
$530.00 |
| 1,000 | 611(L)1600 |
JUNCTION BOXES | 1,419 | CF |
$63.73 |
$57.06 |
$90.00 |
$94.60 |
$91.70 |
$90.00 |
| 1,010 | 613(A)5208 |
18" R.C.PIPE CLASS III | 1,893 | LF |
$68.16 |
$52.25 |
$75.00 |
$47.30 |
$75.90 |
$95.00 |
| 1,020 | 613(A)5216 |
24" R.C.PIPE CLASS III | 133 | LF |
$80.43 |
$68.20 |
$100.00 |
$73.30 |
$101.00 |
$130.00 |
| 1,030 | 613(A)5228 |
42" R.C.PIPE CLASS III | 1,840 | LF |
$150.00 |
$159.82 |
$195.00 |
$221.00 |
$199.50 |
$200.00 |
| 1,040 | 613(A)5232 |
48" R.C.PIPE CLASS III | 100 | LF |
$167.38 |
$176.69 |
$235.00 |
$305.00 |
$239.00 |
$250.00 |
| 1,050 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 727 | LF |
$36.64 |
$54.56 |
$71.00 |
$48.00 |
$72.50 |
$64.00 |
| 1,060 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 184 | LF |
$44.68 |
$64.40 |
$80.00 |
$69.00 |
$81.50 |
$100.00 |
| 1,070 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 74 | LF |
$47.16 |
$74.03 |
$95.00 |
$105.00 |
$97.40 |
$145.00 |
| 1,080 | 613(E)5900 |
18" CORRUGATED POLYETHYLENE PIPE | 1,157 | LF |
$55.00 |
$52.15 |
$74.00 |
$47.50 |
$75.90 |
$92.00 |
| 1,090 | 613(E)5904 |
24" CORRUGATED POLYETHYLENE PIPE | 3,247 | LF |
$65.00 |
$68.81 |
$94.00 |
$73.50 |
$96.20 |
$112.00 |
| 1,100 | 613(E)5908 |
30" CORRUGATED POLYETHYLENE PIPE | 1,823 | LF |
$75.00 |
$87.30 |
$120.00 |
$126.00 |
$123.50 |
$150.00 |
| 1,110 | 613(E)5912 |
36" CORRUGATED POLYETHYLENE PIPE | 717 | LF |
$85.00 |
$126.78 |
$163.00 |
$158.00 |
$167.50 |
$170.00 |
| 1,130 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,819.49 |
$7,235.91 |
$4,500.00 |
$735.00 |
$4,611.00 |
$4,000.00 |
| 1,140 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 12 | EA |
$1,377.26 |
$1,389.11 |
$1,700.00 |
$945.00 |
$1,789.00 |
$1,350.00 |
| 1,150 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$1,758.32 |
$1,411.49 |
$2,000.00 |
$1,050.00 |
$1,902.00 |
$1,400.00 |
| 1,160 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$85,000.00 |
$31,848.01 |
$60,000.00 |
$235,926.75 |
$27,515.00 |
$90,000.00 |
| 1,170 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 752 | LF |
$8.10 |
$6.98 |
$12.00 |
$16.00 |
$10.10 |
$19.00 |
| 1,180 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 1,191 | SY |
$10.99 |
$6.98 |
$11.00 |
$8.00 |
$10.10 |
$35.00 |
| 1,190 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 62,037 | SY |
$3.87 |
$2.24 |
$2.50 |
$4.30 |
$3.80 |
$5.00 |
| 1,200 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 1,274 | SY |
$10.95 |
$6.99 |
$10.00 |
$11.00 |
$10.10 |
$23.00 |
| 1,210 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 486 | SY |
$10.63 |
$6.92 |
$10.00 |
$23.00 |
$85.40 |
$19.00 |
| 1,220 | 619(B)6404 |
REMOVAL OF SIDEWALK | 133 | SY |
$11.69 |
$11.62 |
$18.00 |
$28.00 |
$10.10 |
$24.00 |
| 1,230 | 619(B)6436 |
REMOVAL OF CONCRETE DITCH LINER | 151 | LF |
$14.11 |
$6.94 |
$18.00 |
$25.00 |
$10.10 |
$17.00 |
| 1,240 | 619(B)6508 |
REMOVE AND RESET CATTLE GUARD | 1 | EA |
$1,986.37 |
$2,001.45 |
$1,200.00 |
$3,000.00 |
$7,215.00 |
$2,000.00 |
| 1,250 | 619(C)6600 |
SAWING PAVEMENT | 13,821 | LF |
$2.70 |
$3.21 |
$3.50 |
$1.55 |
$5.60 |
$3.00 |
| 1,260 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 7 | EA |
$119.98 |
$105.05 |
$115.00 |
$105.00 |
$216.50 |
$120.00 |
| 1,270 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 7 | EA |
$18.50 |
$52.53 |
$56.00 |
$52.50 |
$50.00 |
$60.00 |
| 1,280 | 629(E)7600 |
MAILBOX | 7 | EA |
$42.82 |
$52.53 |
$56.00 |
$52.50 |
$33.30 |
$60.00 |
| 1,290 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 73.9 | SF |
$25.57 |
$18.91 |
$20.00 |
$19.00 |
$64.40 |
$21.60 |
| 1,300 | 851(C)2415 |
2" SQUARE TUBE POST | 182 | LF |
$9.66 |
$9.45 |
$10.00 |
$9.50 |
$6.65 |
$10.50 |
| 1,310 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 13,621 | LF |
$0.7600 |
$0.7100 |
$0.8000 |
$0.7000 |
$1.00 |
$0.8000 |
| 1,320 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 211 | LF |
$3.03 |
$1.05 |
$1.15 |
$1.05 |
$1.95 |
$1.20 |
| 1,330 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 330 | LF |
$7.12 |
$5.25 |
$6.00 |
$5.25 |
$7.75 |
$6.00 |
| 1,340 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 12 | EA |
$168.62 |
$183.84 |
$200.00 |
$183.85 |
$361.00 |
$210.00 |
| 1,350 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 67,100 | LF |
$0.6200 |
$0.8400 |
$0.8000 |
$0.8500 |
$0.8900 |
$0.9000 |
| 1,360 | 857(C)9420 |
REMOVABLE PAVEMENT MARKING TAPE(ARROWS) | 24 | EA |
$167.58 |
$26.26 |
$28.00 |
$26.30 |
$327.50 |
$30.00 |
| 1,370 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 67,100 | LF |
$0.1200 |
$0.1200 |
$0.1300 |
$0.1200 |
$0.2900 |
$0.1500 |
| 1,380 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 9,480 | SD |
$18.55 |
$4.20 |
$4.25 |
$4.20 |
$6.65 |
$4.50 |
| 1,390 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 178 | EA |
$705.50 |
$262.63 |
$26.00 |
$263.00 |
$444.00 |
$300.00 |
| 1,400 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 645 | SD |
$9.32 |
$10.51 |
$12.00 |
$10.50 |
$16.70 |
$12.00 |
| 1,410 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,225 | LF |
$20.60 |
$9.29 |
$20.00 |
$56.70 |
$16.50 |
$13.50 |
| 1,420 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 17,587.5 | LF |
$2.97 |
$7.35 |
$2.50 |
$3.90 |
$7.25 |
$12.50 |
| 1,430 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 348 | SD |
$3.85 |
$2.10 |
$2.25 |
$2.10 |
$1.10 |
$2.40 |
| 1,440 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 11,802 | SD |
$0.2000 |
$0.5300 |
$0.6000 |
$0.5500 |
$0.2200 |
$0.6000 |
| 1,450 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,287 | SD |
$0.5400 |
$2.10 |
$2.25 |
$2.00 |
$6.65 |
$2.40 |
| 1,460 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,534 | SD |
$0.9200 |
$3.68 |
$4.00 |
$3.70 |
$7.20 |
$4.20 |
| 1,470 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,032 | SD |
$0.4900 |
$2.10 |
$2.25 |
$2.10 |
$7.75 |
$2.40 |
| 1,480 | 880(C)6420 |
WING BARRICADES | 1,098 | SD |
$0.3500 |
$2.10 |
$2.25 |
$2.10 |
$0.0200 |
$2.40 |
| 1,490 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 10,598 | SD |
$0.2100 |
$0.7900 |
$0.8500 |
$0.8000 |
$0.7200 |
$0.9000 |
| 1,500 | 880(F)6700 |
DRUMS | 7,673 | SD |
$0.2000 |
$0.2600 |
$0.3000 |
$0.3000 |
$1.10 |
$0.3000 |
| 1,510 | 880(G)6805 |
CHANNELIZER CONES | 10,650 | SD |
$0.3200 |
$1.05 |
$1.15 |
$1.05 |
$1.10 |
$1.20 |
| 1,520 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 2,580 | SD |
$10.09 |
$5.25 |
$6.00 |
$5.25 |
$6.65 |
$6.00 |
| 1,530 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 455 | LF |
$10.77 |
$14.22 |
$15.00 |
$14.20 |
$12.20 |
$13.20 |
| 1,540 | 802(B)0328 |
3" PVC SCH.40 PLASTIC CONDUIT BORED | 660 | LF |
$34.43 |
$36.86 |
$40.00 |
$36.80 |
$31.10 |
$33.60 |
| 1,550 | 802(B)0332 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 320 | LF |
$14.57 |
$21.06 |
$23.00 |
$21.00 |
$14.40 |
$15.60 |
| 1,560 | 803(A)1220 |
PULL BOX(SIZE II) | 8 | EA |
$1,035.41 |
$1,463.90 |
$1,500.00 |
$1,460.00 |
$1,110.00 |
$1,200.00 |
| 1,570 | 804(A)2200 |
STRUCTURAL CONCRETE | 59.6 | CY |
$1,220.17 |
$895.19 |
$950.00 |
$893.00 |
$943.50 |
$1,020.00 |
| 1,580 | 804(B)2300 |
REINFORCING STEEL | 8,537.6 | LB |
$2.13 |
$1.95 |
$2.00 |
$1.95 |
$1.65 |
$1.80 |
| 1,590 | 806(A)4256 |
32'MH POLE 45'TS & 10'LMA(G.STL.) | 7 | EA |
$45,966.67 |
$33,016.76 |
$35,000.00 |
$32,936.00 |
$37,840.00 |
$40,000.00 |
| 1,600 | 806(A)4260 |
32'MH POLE 50'TS & 10'LMA(G.STL.) | 1 | EA |
$22,106.24 |
$38,440.57 |
$40,000.00 |
$38,350.00 |
$40,675.00 |
$43,000.00 |
| 1,610 | 806(B)4408 |
10' MTG.HT.TS PED.POLE(G.STL.) | 8 | EA |
$889.80 |
$947.85 |
$1,000.00 |
$945.00 |
$1,110.00 |
$1,200.00 |
| 1,620 | 809(A)7200 |
ROADWAY LUMINAIRE | 8 | EA |
$1,231.97 |
$763.55 |
$800.00 |
$762.00 |
$666.00 |
$720.00 |
| 1,630 | 810(A)8200 |
SERVICE POLE | 2 | EA |
$1,186.64 |
$1,685.06 |
$1,800.00 |
$1,682.00 |
$277.50 |
$300.00 |
| 1,640 | 811 9120 |
1/C NO.6 ELECT.COND. | 400 | LF |
$1.88 |
$5.37 |
$5.60 |
$5.40 |
$3.35 |
$3.60 |
| 1,650 | 811 9130 |
1/C NO.10 ELECT.COND. | 4,745 | LF |
$1.20 |
$1.69 |
$1.75 |
$1.70 |
$1.95 |
$2.10 |
| 1,660 | 825 8100 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY | 2 | EA |
$33,667.51 |
$47,392.47 |
$50,000.00 |
$47,300.00 |
$44,960.00 |
$48,600.00 |
| 1,670 | 828 0100 |
(PL)DETECTION SYSTEM (VIDEO) | 1 | LSUM |
$59,397.66 |
$163,240.74 |
$170,000.00 |
$162,845.00 |
$165,250.00 |
$175,000.00 |
| 1,680 | 830 2100 |
PEDESTRIAN PUSH BUTTON | 16 | EA |
$1,258.70 |
$842.53 |
$900.00 |
$840.00 |
$1,404.00 |
$1,500.00 |
| 1,690 | 831 3116 |
1WAY2SEC.ADJ.PED.SIG.HD.S-20 | 16 | EA |
$724.36 |
$684.56 |
$725.00 |
$683.00 |
$666.00 |
$720.00 |
| 1,700 | 831 3120 |
1WAY3SEC.ADJ.SIG.HD.S-6 | 16 | EA |
$830.43 |
$737.22 |
$775.00 |
$735.00 |
$943.50 |
$1,020.00 |
| 1,710 | 831 3144 |
1WAY4SEC.ADJ.SIG.HD.S-13 | 8 | EA |
$1,034.71 |
$947.85 |
$1,000.00 |
$945.00 |
$1,110.00 |
$1,200.00 |
| 1,720 | 833 5100 |
BACKPLATE | 24 | EA |
$231.45 |
$157.97 |
$160.00 |
$158.00 |
$277.50 |
$300.00 |
| 1,730 | 834(A)6205 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 7,510 | LF |
$2.51 |
$2.63 |
$2.75 |
$2.65 |
$4.45 |
$4.80 |
| 1,740 | 834(A)6210 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 555 | LF |
$3.04 |
$3.16 |
$3.30 |
$3.20 |
$5.55 |
$6.00 |
| 1,750 | 834(A)6235 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE | 2,180 | LF |
$6.29 |
$7.37 |
$7.70 |
$7.35 |
$7.75 |
$8.40 |
| 1,760 | 834(B)6300 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 96 | LF |
$2.72 |
$3.79 |
$4.00 |
$3.80 |
$2.20 |
$2.40 |
| 1,770 | 850(C)1400 |
MAST ARM MOUNTED SIGNS(ALUM.) | 156 | SF |
$61.78 |
$52.66 |
$55.00 |
$52.50 |
$66.60 |
$72.00 |
| 1,780 | 890 1100 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$35,000.00 |
$18,956.99 |
$20,000.00 |
$18,900.94 |
$23,125.00 |
$30,000.00 |
| 1,790 | 804(A)2200 |
STRUCTURAL CONCRETE | 1.22 | CY |
$1,220.17 |
$1,272.19 |
$280.00 |
$894.00 |
$943.50 |
$600.00 |
| 1,800 | 804(B)2300 |
REINFORCING STEEL | 103.8 | LB |
$2.13 |
$2.22 |
$3.00 |
$1.95 |
$5.55 |
$6.00 |
| 1,810 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$211.59 |
$393.94 |
$400.00 |
$670.00 |
$721.50 |
$450.00 |
| 1,820 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 138.72 | SF |
$23.88 |
$18.91 |
$20.00 |
$19.00 |
$35.50 |
$20.00 |
| 1,830 | 851(B)2305 |
2"@3.65 GALV.STL.PIPE POST | 24 | LF |
$14.13 |
$26.26 |
$28.00 |
$26.30 |
$20.00 |
$30.00 |
| 1,840 | 851(C)2415 |
2" SQUARE TUBE POST | 326.5 | LF |
$9.22 |
$9.45 |
$10.00 |
$9.50 |
$6.65 |
$10.00 |
| 1,850 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 43,094 | LF |
$0.4900 |
$0.5700 |
$0.6000 |
$0.6000 |
$0.5000 |
$0.6500 |
| 1,860 | 856(A)8212 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 651 | LF |
$2.81 |
$1.05 |
$1.15 |
$1.10 |
$3.35 |
$1.20 |
| 1,870 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 1,757 | LF |
$5.40 |
$3.15 |
$3.50 |
$3.15 |
$6.65 |
$3.60 |
| 1,880 | 856(B)8304 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 37 | EA |
$148.63 |
$183.84 |
$200.00 |
$184.00 |
$277.50 |
$210.00 |
| 1,890 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 179,400 | LF |
$0.4900 |
$0.7900 |
$0.7500 |
$0.8000 |
$0.9500 |
$0.9000 |
| 1,900 | 857(C)9420 |
REMOVABLE PAVEMENT MARKING TAPE(ARROWS) | 24 | EA |
$167.58 |
$26.26 |
$26.00 |
$26.30 |
$327.50 |
$30.00 |
| 1,910 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 179,400 | LF |
$0.1100 |
$0.1200 |
$0.1200 |
$0.1200 |
$0.2100 |
$0.1500 |
| 1,920 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 4,532 | SD |
$3.59 |
$4.20 |
$4.15 |
$4.20 |
$6.65 |
$4.80 |
| 1,930 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 126 | EA |
$705.50 |
$262.63 |
$26.00 |
$263.00 |
$444.00 |
$300.00 |
| 1,940 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 645 | SD |
$9.32 |
$10.51 |
$12.00 |
$10.50 |
$5.55 |
$12.00 |
| 1,950 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 14,437.5 | LF |
$17.63 |
$9.29 |
$20.00 |
$61.00 |
$16.50 |
$9.00 |
| 1,960 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 54,725 | LF |
$2.65 |
$7.35 |
$2.00 |
$3.95 |
$7.25 |
$9.50 |
| 1,970 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 348 | SD |
$3.85 |
$2.10 |
$2.25 |
$2.10 |
$1.10 |
$2.40 |
| 1,980 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 17,578 | SD |
$0.1700 |
$0.5300 |
$0.6000 |
$0.5500 |
$0.0200 |
$0.6000 |
| 1,990 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,670 | SD |
$0.3700 |
$1.58 |
$1.75 |
$1.60 |
$5.00 |
$1.80 |
| 2,000 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,348 | SD |
$0.8700 |
$3.15 |
$3.50 |
$3.15 |
$5.55 |
$3.60 |
| 2,010 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 6,194 | SD |
$0.3900 |
$2.10 |
$2.25 |
$2.10 |
$5.55 |
$2.40 |
| 2,020 | 880(C)6420 |
WING BARRICADES | 1,212 | SD |
$0.3400 |
$2.10 |
$2.25 |
$2.10 |
$0.0200 |
$2.40 |
| 2,030 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 17,736 | SD |
$0.1700 |
$0.7900 |
$0.8500 |
$0.8000 |
$0.3900 |
$0.9000 |
| 2,040 | 880(F)6700 |
DRUMS | 8,263 | SD |
$0.2000 |
$0.2600 |
$0.3000 |
$0.2500 |
$0.0600 |
$0.3000 |
| 2,050 | 880(G)6805 |
CHANNELIZER CONES | 13,028 | SD |
$0.3000 |
$1.05 |
$1.15 |
$1.10 |
$0.5600 |
$1.20 |
| 2,055 | 880(I)7000 |
FLAGGER | 7 | SD |
$100.00 |
$440.29 |
$1,200.00 |
$426.00 |
$855.00 |
$1,250.00 |
| 2,060 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 3,870 | SD |
$9.64 |
$5.25 |
$6.00 |
$5.25 |
$6.65 |
$6.00 |
| 2,070 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$50,009.96 |
$65,000.00 |
$84,993.67 |
$53,245.00 |
$70,000.00 |
| 2,080 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$101,536.95 |
$120,000.00 |
$200,000.00 |
$108,100.00 |
$156,000.00 |
| 2,090 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$2,085.27 |
$10,000.00 |
$15,000.00 |
$5,000.00 |
$30,000.00 |
| 2,100 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$184,392.00 |
$270,000.00 |
$250,000.00 |
$246,000.00 |
$250,000.00 |
$510,000.00 |
| 2,110 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$2,085.27 |
$15,000.00 |
$15,000.00 |
$7,500.00 |
$99,000.00 |
| 2,120 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$30,000.00 |
$39,406.28 |
$20,000.00 |
$34,000.00 |
$10,000.00 |
$88,000.00 |
| 2,130 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$490,418.00 |
$545,000.00 |
$600,000.00 |
$542,200.00 |
$500,000.61 |
$510,000.00 |
| 2,140 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$10,426.34 |
$6,500.00 |
$27,000.00 |
$11,265.00 |
$30,000.00 |
| 2,150 | 230(A)7200 |
SOLID SLAB SODDING | 5,976 | SY |
$2.00 |
$1.88 |
$2.00 |
$1.90 |
$2.00 |
$2.25 |
| 2,160 | 303(A)1200 |
AGGREGATE BASE TYPE A | 80 | CY |
$50.00 |
$46.92 |
$65.00 |
$63.00 |
$50.70 |
$68.00 |
| 2,165 | 600(A)0200 |
(PL) AS-BUILT SURVEY | 1 | LSUM |
$5,000.00 |
$4,743.99 |
$5,500.00 |
$3,867.00 |
$2,997.00 |
$25,000.00 |
| 2,170 | 612(G)3810 |
FIRE HYDRANT RELOCATION | 1 | EA |
$1,250.00 |
$7,819.76 |
$2,800.00 |
$1,156.00 |
$8,450.00 |
$1,250.00 |
| 2,180 | 612(I)4010 |
WATER METER RELOCATION | 24 | EA |
$1,500.00 |
$1,563.95 |
$1,600.00 |
$1,050.00 |
$1,690.00 |
$400.00 |
| 2,190 | 616(B)2329 |
3" PVC ENCASEMENT | 880 | LF |
$27.00 |
$31.28 |
$22.25 |
$48.30 |
$33.80 |
$39.00 |
| 2,200 | 616(B)2336 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 848 | LF |
$40.00 |
$52.13 |
$66.50 |
$99.80 |
$56.30 |
$65.00 |
| 2,210 | 616(B)2340 |
8" POLYVINYL CHLORIDE (PVC) PIPE | 1,449 | LF |
$45.00 |
$83.41 |
$105.00 |
$89.30 |
$90.10 |
$75.50 |
| 2,220 | 616(B)2352 |
12" POLYVINYL CHLORIDE (PVC) PIPE | 6,668 | LF |
$60.00 |
$120.95 |
$140.00 |
$108.20 |
$130.50 |
$122.25 |
| 2,230 | 616(C)2445 |
1 1/2" COPPER WATER SERVICE PIPE (SHORT) | 13 | EA |
$500.00 |
$2,085.27 |
$2,700.00 |
$2,080.20 |
$2,253.00 |
$5,000.00 |
| 2,240 | 616(C)2450 |
1 1/2" COPPER WATER SERVICE PIPE (LONG) | 11 | EA |
$1,000.00 |
$5,734.49 |
$6,600.00 |
$4,727.80 |
$6,197.00 |
$6,300.00 |
| 2,250 | 616(D)2534 |
2" AIR RELIEF VALVE ASSEMBLY & METER CAN | 1 | EA |
$1,500.00 |
$7,819.76 |
$4,000.00 |
$6,304.00 |
$8,450.00 |
$6,600.00 |
| 2,260 | 616(D)2646 |
6" GATE VALVE | 19 | EA |
$1,400.00 |
$1,616.08 |
$2,800.00 |
$1,156.00 |
$1,746.00 |
$2,000.00 |
| 2,270 | 616(D)2650 |
8" GATE VALVE | 1 | EA |
$2,500.00 |
$2,554.45 |
$3,300.00 |
$1,597.00 |
$2,760.00 |
$2,700.00 |
| 2,280 | 616(D)2658 |
12" GATE VALVE | 19 | EA |
$3,000.00 |
$3,909.88 |
$8,300.00 |
$2,942.00 |
$4,225.00 |
$4,850.00 |
| 2,290 | 616(D)2708 |
6" TAP | 8 | EA |
$3,500.00 |
$1,251.16 |
$1,100.00 |
$955.00 |
$1,352.00 |
$1,050.00 |
| 2,300 | 616(D)2710 |
8" TAP | 1 | EA |
$3,500.00 |
$1,303.29 |
$5,000.00 |
$1,282.00 |
$1,408.00 |
$1,350.00 |
| 2,310 | 616(D)2716 |
12" TAP | 2 | EA |
$5,000.00 |
$2,345.93 |
$7,200.00 |
$1,870.00 |
$2,535.00 |
$1,950.00 |
| 2,320 | 616(D)2718 |
16" TAP | 1 | EA |
$6,000.00 |
$4,743.99 |
$450.00 |
$3,394.00 |
$5,127.00 |
$4,875.00 |
| 2,330 | 616(D)2748 |
6" X 6" TAPPING SLEEVE | 8 | EA |
$450.00 |
$4,691.86 |
$1,600.00 |
$3,100.00 |
$5,070.00 |
$1,550.00 |
| 2,340 | 616(D)2752 |
8" X 8" TAPPING SLEEVE | 1 | EA |
$500.00 |
$5,213.17 |
$2,200.00 |
$3,290.00 |
$5,634.00 |
$1,900.00 |
| 2,350 | 616(D)2776 |
12" X 12" TAPPING SLEEVE | 3 | EA |
$1,000.00 |
$5,734.49 |
$4,000.00 |
$3,680.00 |
$6,197.00 |
$3,200.00 |
| 2,360 | 616(D)2779 |
16" X 12" TAPPING SLEEVE AND VALVE | 1 | EA |
$1,500.00 |
$6,255.81 |
$4,400.00 |
$5,085.00 |
$6,760.00 |
$3,900.00 |
| 2,370 | 616(D)2812 |
6" TAPPING VALVE AND BOX | 8 | EA |
$2,500.00 |
$1,563.95 |
$2,800.00 |
$1,135.00 |
$1,690.00 |
$2,400.00 |
| 2,380 | 616(D)2816 |
8" TAPPING VALVE AND BOX | 1 | EA |
$3,000.00 |
$2,345.93 |
$3,300.00 |
$1,587.00 |
$2,535.00 |
$3,200.00 |
| 2,390 | 616(D)2824 |
12" TAPPING VALVE AND BOX | 3 | EA |
$4,000.00 |
$3,753.48 |
$9,400.00 |
$2,932.00 |
$4,056.00 |
$6,400.00 |
| 2,400 | 616(G)3100 |
FIRE HYDRANTS | 11 | EA |
$3,500.00 |
$3,649.22 |
$8,300.00 |
$3,152.00 |
$3,944.00 |
$4,000.00 |
| 2,410 | 616(I)3327 |
18" STEEL CASING | 275 | LF |
$190.00 |
$208.53 |
$133.00 |
$64.00 |
$225.50 |
$162.00 |
| 2,420 | 616(J)3420 |
BORE AND JACK 14" CASING | 605 | LF |
$100.00 |
$364.92 |
$305.00 |
$525.00 |
$394.50 |
$490.00 |
| 2,430 | 616(J)3430 |
BORE AND JACK 18" CASING | 95 | LF |
$190.00 |
$479.61 |
$330.00 |
$893.00 |
$518.50 |
$580.00 |
| 2,440 | 616(K)3524 |
12" SOLID SLEEVE | 1 | EA |
$1,500.00 |
$1,251.16 |
$1,350.00 |
$2,112.00 |
$1,352.00 |
$1,800.00 |
| 2,450 | 616(O)3975 |
6" 11 1/4 DEGREE FITTING | 9 | EA |
$350.00 |
$469.19 |
$450.00 |
$523.00 |
$507.00 |
$795.00 |
| 2,460 | 616(O)3985 |
6" 45 DEGREE FITTING | 3 | EA |
$525.00 |
$521.32 |
$450.00 |
$778.00 |
$563.50 |
$810.00 |
| 2,470 | 616(O)3990 |
6" 90 DEGREE FITTING | 7 | EA |
$500.00 |
$573.45 |
$450.00 |
$581.00 |
$619.50 |
$845.00 |
| 2,480 | 616(O)4000 |
8" 11 1/4 DEGREE FITTING | 1 | EA |
$500.00 |
$677.71 |
$550.00 |
$622.00 |
$732.50 |
$1,000.00 |
| 2,490 | 616(O)4010 |
8" 45 DEGREE FITTING | 3 | EA |
$600.00 |
$729.84 |
$550.00 |
$955.00 |
$788.50 |
$950.00 |
| 2,500 | 616(O)4015 |
8" 90 DEGREE FITTING | 1 | EA |
$575.00 |
$834.11 |
$550.00 |
$951.00 |
$901.50 |
$1,100.00 |
| 2,510 | 616(O)4045 |
12" 45 DEGREE FITTING | 12 | EA |
$2,000.00 |
$1,563.95 |
$1,650.00 |
$1,471.00 |
$1,690.00 |
$1,800.00 |
| 2,520 | 616(R)4344 |
12" X 6" REDUCER | 1 | EA |
$600.00 |
$1,042.63 |
$1,100.00 |
$994.00 |
$1,127.00 |
$900.00 |
| 2,530 | 616(S)4405 |
6" PLUG | 11 | EA |
$190.00 |
$260.66 |
$300.00 |
$604.00 |
$281.50 |
$425.00 |
| 2,540 | 616(S)4410 |
8" PLUG | 3 | EA |
$200.00 |
$417.05 |
$400.00 |
$669.00 |
$450.50 |
$500.00 |
| 2,550 | 616(S)4420 |
12" PLUG | 4 | EA |
$500.00 |
$677.71 |
$800.00 |
$767.00 |
$732.50 |
$900.00 |
| 2,560 | 616(T)4535 |
6" X 6" X 6" TEE | 1 | EA |
$450.00 |
$834.11 |
$900.00 |
$760.00 |
$901.50 |
$1,100.00 |
| 2,570 | 616(T)4545 |
12" X 6" CROSS | 2 | EA |
$1,700.00 |
$2,085.27 |
$2,800.00 |
$1,660.00 |
$2,253.00 |
$2,200.00 |
| 2,580 | 616(T)4589 |
12" X 12" CROSS | 1 | EA |
$2,000.00 |
$2,710.85 |
$4,000.00 |
$2,250.00 |
$2,929.00 |
$3,200.00 |
| 2,590 | 616(T)4595 |
12" X 12" X 6" TEE | 13 | EA |
$700.00 |
$1,459.69 |
$2,200.00 |
$1,482.00 |
$1,577.00 |
$1,800.00 |
| 2,600 | 616(T)4600 |
12" X 12" X 8" TEE | 1 | EA |
$750.00 |
$1,563.95 |
$2,200.00 |
$1,545.00 |
$1,690.00 |
$2,000.00 |
| 2,610 | 616(T)4610 |
12" X 12" X 12" TEE | 1 | EA |
$800.00 |
$1,824.61 |
$2,800.00 |
$1,860.00 |
$1,972.00 |
$2,200.00 |
| 2,615 | 616(V)4800 |
HYDROSTATIC PRESSURE TESTING & DISINFECT | 1 | LSUM |
$10,000.00 |
$20,852.69 |
$30,000.00 |
$8,195.00 |
$22,535.00 |
$14,000.00 |
| 2,620 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 44 | SY |
$60.00 |
$15.64 |
$60.00 |
$81.00 |
$16.90 |
$12.00 |
| 2,630 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 35 | SY |
$100.00 |
$15.64 |
$60.00 |
$76.00 |
$16.90 |
$15.00 |
| 2,640 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 155 | SY |
$25.00 |
$5.21 |
$60.00 |
$59.00 |
$5.65 |
$5.00 |
| 2,650 | 619(B)6529 |
CUT 8" WATER LINE | 3 | EA |
$250.00 |
$2,345.93 |
$3,300.00 |
$3,152.00 |
$2,535.00 |
$825.00 |
| 2,660 | 619(B)6535 |
CUT 6" WATER LINE | 11 | EA |
$150.00 |
$2,085.27 |
$2,200.00 |
$3,152.00 |
$2,253.00 |
$825.00 |
| 2,670 | 619(B)6545 |
CUT 12" WATER LINE | 4 | EA |
$400.00 |
$2,606.59 |
$4,500.00 |
$3,152.00 |
$2,817.00 |
$1,250.00 |
| 2,680 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$15,000.00 |
$25,023.23 |
$105,000.00 |
$111,600.00 |
$85,000.00 |
$85,000.00 |
| 2,690 | 880(J)7110 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$9,500.00 |
$7,878.86 |
$8,500.00 |
$7,980.00 |
$2,636.00 |
$9,000.00 |
| 2,695 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$9,331.58 |
$25,000.00 |
$13,233.50 |
$9,935.00 |
$37,000.00 |
| 2,700 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$7,819.76 |
$2,000.00 |
$14,100.00 |
$8,450.00 |
$31,000.00 |
| 2,710 | 230(A)7200 |
SOLID SLAB SODDING | 2,170 | SY |
$2.00 |
$1.88 |
$2.00 |
$1.90 |
$2.00 |
$2.25 |
| 2,720 | 303(A)1200 |
AGGREGATE BASE TYPE A | 21 | CY |
$50.00 |
$46.92 |
$65.00 |
$63.00 |
$50.70 |
$85.00 |
| 2,725 | 600(A)0200 |
(PL) AS-BUILT SURVEY | 1 | LSUM |
$3,000.00 |
$2,815.11 |
$4,000.00 |
$1,681.00 |
$2,997.00 |
$18,000.00 |
| 2,730 | 616(B)2336 |
6" POLYVINYL CHLORIDE (PVC) PIPE | 15 | LF |
$40.00 |
$52.13 |
$35.00 |
$45.70 |
$56.30 |
$107.00 |
| 2,740 | 616(B)2340 |
8" POLYVINYL CHLORIDE (PVC) PIPE | 297 | LF |
$45.00 |
$83.41 |
$72.00 |
$92.50 |
$90.10 |
$75.00 |
| 2,750 | 616(B)2356 |
16" POLYVINYL CHLORIDE (PVC) PIPE | 2,959 | LF |
$65.00 |
$135.54 |
$233.00 |
$125.00 |
$146.50 |
$175.00 |
| 2,760 | 616(D)2646 |
6" GATE VALVE | 3 | EA |
$1,400.00 |
$1,616.08 |
$2,800.00 |
$1,156.00 |
$1,746.00 |
$2,000.00 |
| 2,770 | 616(D)2650 |
8" GATE VALVE | 1 | EA |
$2,500.00 |
$2,554.45 |
$3,300.00 |
$1,600.00 |
$2,760.00 |
$2,700.00 |
| 2,780 | 616(D)2666 |
16" GATE VALVE | 1 | EA |
$4,000.00 |
$13,032.93 |
$10,500.00 |
$9,385.00 |
$14,085.00 |
$14,000.00 |
| 2,790 | 616(D)2710 |
8" TAP | 2 | EA |
$3,500.00 |
$1,303.30 |
$5,000.00 |
$1,380.00 |
$1,408.00 |
$1,350.00 |
| 2,800 | 616(D)2718 |
16" TAP | 1 | EA |
$6,000.00 |
$4,743.99 |
$11,000.00 |
$4,675.00 |
$5,217.00 |
$4,875.00 |
| 2,810 | 616(D)2752 |
8" X 8" TAPPING SLEEVE | 4 | EA |
$500.00 |
$5,213.17 |
$2,200.00 |
$3,290.00 |
$5,634.00 |
$1,875.00 |
| 2,820 | 616(D)2778 |
16" X 8" TAPPING SLEEVE AND VALVE | 3 | EA |
$1,300.00 |
$6,047.28 |
$4,500.00 |
$3,575.00 |
$6,535.00 |
$3,000.00 |
| 2,830 | 616(D)2780 |
16" X 16" TAPPING SLEEVE AND VALVE | 2 | EA |
$1,500.00 |
$7,298.44 |
$11,000.00 |
$6,070.00 |
$7,887.00 |
$10,000.00 |
| 2,840 | 616(D)2816 |
8" TAPPING VALVE AND BOX | 7 | EA |
$3,000.00 |
$2,345.93 |
$3,300.00 |
$1,220.00 |
$2,535.00 |
$3,000.00 |
| 2,850 | 616(D)2829 |
16" TAPPING VALVE AND BOX | 2 | EA |
$5,000.00 |
$9,905.03 |
$13,500.00 |
$7,300.00 |
$10,705.00 |
$15,000.00 |
| 2,860 | 616(G)3100 |
FIRE HYDRANTS | 3 | EA |
$3,500.00 |
$3,649.22 |
$8,500.00 |
$3,985.00 |
$3,944.00 |
$4,000.00 |
| 2,870 | 616(I)3330 |
20" STEEL CASING | 27 | LF |
$300.00 |
$208.53 |
$160.00 |
$160.00 |
$225.50 |
$165.00 |
| 2,880 | 616(J)3420 |
BORE AND JACK 14" CASING | 259 | LF |
$150.00 |
$364.92 |
$305.00 |
$525.00 |
$394.50 |
$500.00 |
| 2,890 | 616(O)4010 |
8" 45 DEGREE FITTING | 9 | EA |
$600.00 |
$729.84 |
$450.00 |
$954.00 |
$788.50 |
$975.00 |
| 2,900 | 616(O)4015 |
8" 90 DEGREE FITTING | 4 | EA |
$575.00 |
$834.11 |
$550.00 |
$863.00 |
$901.50 |
$1,000.00 |
| 2,910 | 616(O)4055 |
16" 11 1/4 DEGREE FITTING | 3 | EA |
$3,000.00 |
$3,649.22 |
$2,000.00 |
$2,880.00 |
$3,944.00 |
$2,700.00 |
| 2,920 | 616(O)4065 |
16" 45 DEGREE FITTING | 4 | EA |
$3,000.00 |
$3,909.88 |
$2,500.00 |
$2,953.00 |
$4,225.00 |
$3,000.00 |
| 2,930 | 616(O)4070 |
16" 90 DEGREE FITTING | 1 | EA |
$2,500.00 |
$4,170.54 |
$2,800.00 |
$3,352.00 |
$4,507.00 |
$3,500.00 |
| 2,940 | 616(S)4410 |
8" PLUG | 4 | EA |
$225.00 |
$417.06 |
$550.00 |
$670.00 |
$450.50 |
$470.00 |
| 2,950 | 616(S)4425 |
16" PLUG | 2 | EA |
$550.00 |
$2,085.27 |
$4,000.00 |
$2,080.00 |
$2,253.00 |
$1,500.00 |
| 2,960 | 616(T)4618 |
16" X 8" TEE | 1 | EA |
$1,000.00 |
$3,023.64 |
$3,300.00 |
$3,815.00 |
$3,267.00 |
$3,600.00 |
| 2,970 | 616(T)4620 |
16" X 16" X 6" TEE | 3 | EA |
$950.00 |
$2,919.38 |
$3,300.00 |
$3,280.00 |
$3,155.00 |
$3,400.00 |
| 2,975 | 616(V)4800 |
HYDROSTATIC PRESSURE TESTING & DISINFECT | 1 | LSUM |
$3,500.00 |
$5,213.17 |
$38,000.00 |
$4,280.00 |
$5,634.00 |
$5,300.00 |
| 2,980 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 21 | SY |
$25.00 |
$5.21 |
$40.00 |
$56.00 |
$5.65 |
$18.00 |
| 2,990 | 619(B)6529 |
CUT 8" WATER LINE | 4 | EA |
$225.00 |
$2,345.93 |
$3,300.00 |
$3,152.00 |
$2,535.00 |
$825.00 |
| 3,000 | 619(B)6547 |
CUT 16" WATER LINE | 2 | EA |
$500.00 |
$2,867.25 |
$5,500.00 |
$3,362.00 |
$3,098.00 |
$1,650.00 |
| 3,010 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$1,000.00 |
$1,042.63 |
$50,000.00 |
$62,320.00 |
$55,000.00 |
$60,000.00 |
| 3,020 | 880(J)7110 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,000.00 |
$7,878.86 |
$8,500.00 |
$7,872.00 |
$5,273.00 |
$9,000.00 |
| 3,030 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$4,000.00 |
$5,682.36 |
$25,000.00 |
$4,420.00 |
$6,050.00 |
$30,000.00 |