| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,490.58 |
$40,000.00 |
$30,000.00 |
$37,000.00 |
$22,435.00 |
$60,000.00 |
$75,200.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 23,739 | CY |
$8.50 |
$7.70 |
$6.50 |
$7.00 |
$7.15 |
$6.95 |
$10.80 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 250 | CY |
$23.22 |
$13.20 |
$7.50 |
$12.00 |
$10.20 |
$6.95 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$18,501.91 |
$46,000.00 |
$28,400.00 |
$42,000.00 |
$30,590.00 |
$35,000.00 |
$85,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,550 | LF |
$1.51 |
$1.12 |
$2.00 |
$1.02 |
$1.05 |
$1.50 |
$1.10 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,910 | LF |
$7.07 |
$6.05 |
$7.25 |
$5.91 |
$6.05 |
$8.00 |
$3.10 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 189 | CY |
$97.65 |
$99.00 |
$24.00 |
$160.00 |
$127.50 |
$80.00 |
$55.90 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 52,992 | SY |
$1.28 |
$0.9900 |
$1.50 |
$0.9000 |
$0.9200 |
$1.50 |
$0.9500 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.95 | AC |
$283.78 |
$137.50 |
$350.00 |
$125.00 |
$127.50 |
$280.00 |
$130.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 12,423 | CY |
$47.18 |
$51.00 |
$33.50 |
$47.00 |
$49.00 |
$43.70 |
$60.50 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 74,456 | SY |
$1.31 |
$1.35 |
$1.50 |
$1.27 |
$1.55 |
$0.7000 |
$1.50 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 74,456 | SY |
$1.20 |
$1.08 |
$0.7500 |
$0.9900 |
$1.50 |
$1.30 |
$0.8500 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,650.5 | TON |
$42.60 |
$28.50 |
$18.00 |
$26.00 |
$22.40 |
$25.00 |
$25.00 |
| 14 | 407(B) 0250 |
TACK COAT | 5,040 | GAL |
$3.26 |
$2.00 |
$2.10 |
$3.85 |
$4.60 |
$2.00 |
$2.50 |
| 15 | 408 5774 |
PRIME COAT | 15,326 | GAL |
$3.89 |
$2.00 |
$3.10 |
$4.30 |
$8.30 |
$6.00 |
$2.50 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,854 | TON |
$80.00 |
$61.00 |
$61.00 |
$62.70 |
$56.90 |
$61.80 |
$56.25 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,683 | TON |
$85.00 |
$65.55 |
$68.00 |
$68.50 |
$66.70 |
$72.70 |
$64.91 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 3,748 | SY |
$5.62 |
$1.00 |
$2.50 |
$3.20 |
$2.10 |
$5.75 |
$6.00 |
| 19 | 509(A) 0319 |
CLASS AA CONCRETE | 52.8 | CY |
$315.27 |
$590.00 |
$700.00 |
$600.00 |
$751.50 |
$845.00 |
$584.00 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$315.27 |
$340.00 |
$800.00 |
$300.00 |
$456.50 |
$500.00 |
$330.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 7,277.6 | LB |
$1.11 |
$1.10 |
$1.25 |
$1.50 |
$3.10 |
$0.4500 |
$1.10 |
| 22 | 613(A) 4438 |
88" X 54" R.C.PIPE ARCH CLASS A-III | 116 | LF |
$305.82 |
$450.00 |
$485.00 |
$575.00 |
$545.50 |
$363.00 |
$438.00 |
| 23 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 80 | LF |
$89.86 |
$84.70 |
$110.00 |
$110.00 |
$89.70 |
$77.00 |
$82.00 |
| 24 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 42 | LF |
$157.26 |
$117.00 |
$110.00 |
$120.00 |
$108.00 |
$90.00 |
$114.00 |
| 25 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 42 | LF |
$167.45 |
$150.70 |
$150.00 |
$150.00 |
$149.00 |
$112.00 |
$146.00 |
| 26 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 229 | LF |
$231.70 |
$239.00 |
$180.00 |
$240.00 |
$244.50 |
$180.00 |
$232.00 |
| 27 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 252 | LF |
$103.82 |
$119.00 |
$85.00 |
$101.00 |
$81.60 |
$101.00 |
$116.00 |
| 28 | 613(D) 4512 |
28" X 20" CORR. ALUMINUM PIPE ARCH | 2,080 | LF |
$40.00 |
$38.50 |
$74.00 |
$33.00 |
$33.70 |
$54.50 |
$37.30 |
| 29 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$1,144.00 |
$1,600.00 |
$1,350.00 |
$1,170.00 |
$1,224.00 |
$1,200.00 |
$1,545.00 |
| 30 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 102 | EA |
$274.96 |
$275.00 |
$450.00 |
$185.00 |
$204.00 |
$565.00 |
$266.00 |
| 31 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,341.00 |
$1,760.00 |
$1,350.00 |
$1,425.00 |
$1,668.00 |
$1,480.00 |
$1,705.00 |
| 32 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,753.00 |
$2,200.00 |
$1,450.00 |
$1,750.00 |
$2,190.00 |
$1,805.00 |
$2,130.00 |
| 33 | 613(L) 4546 |
58" X 36" PREFAB. CULVERT END SECTION, ARCH | 10 | EA |
$2,866.00 |
$3,410.00 |
$2,300.00 |
$2,935.00 |
$3,803.00 |
$2,810.00 |
$3,305.00 |
| 34 | 613(L) 4569 |
88" X 54" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$5,777.00 |
$6,000.00 |
$6,200.00 |
$6,300.00 |
$8,531.00 |
$5,765.00 |
$6,115.00 |
| 35 | 613(L) 5742 |
60" PREFAB. CULVERT END SECTION, ROUND | 6 | EA |
$1,879.37 |
$1,870.00 |
$1,450.00 |
$1,690.00 |
$2,141.00 |
$1,905.00 |
$1,810.00 |
| 36 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$9,137.41 |
$24,000.00 |
$15,000.00 |
$21,000.00 |
$14,275.00 |
$25,000.00 |
$25,000.00 |
| 37 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 52,153 | SY |
$2.92 |
$1.30 |
$3.00 |
$3.20 |
$2.60 |
$4.45 |
$2.65 |
| 38 | 619(C) 0924 |
SAWING PAVEMENT | 278 | LF |
$5.71 |
$1.00 |
$5.50 |
$6.00 |
$6.65 |
$3.00 |
$2.65 |
| 39 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 19 | EA |
$150.12 |
$50.00 |
$125.00 |
$250.00 |
$25.50 |
$200.00 |
$160.00 |
| 40 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 9 | EA |
$158.00 |
$220.00 |
$210.00 |
$200.00 |
$137.50 |
$225.00 |
$213.00 |
| 41 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 79.72 | SF |
$21.68 |
$27.50 |
$30.00 |
$25.00 |
$41.80 |
$28.00 |
$27.00 |
| 42 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 180 | LF |
$7.52 |
$11.00 |
$12.00 |
$10.00 |
$7.15 |
$11.25 |
$10.65 |
| 43 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 108,740 | LF |
$0.3500 |
$0.3500 |
$0.3800 |
$0.3200 |
$0.3500 |
$0.3500 |
$0.3500 |
| 44 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 142 | LF |
$7.39 |
$11.00 |
$14.00 |
$10.00 |
$6.10 |
$11.25 |
$10.65 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$75,674.00 |
$26,500.00 |
$10,000.00 |
$6,000.00 |
$12,620.00 |
$13,500.00 |
$12,500.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$14,515.23 |
$24,000.00 |
$130,000.00 |
$96,750.00 |
$68,420.00 |
$80,000.00 |
$52,200.00 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,622.52 |
$2,000.00 |
$20,000.00 |
$25,000.00 |
$2,549.00 |
$3,750.00 |
$15,200.00 |
| 48 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$106,705.32 |
$90,000.00 |
$120,000.00 |
$87,000.00 |
$126,288.78 |
$85,000.00 |
$179,977.72 |