| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$70,184.80 |
$125,201.40 |
$64,450.00 |
$150,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 71,769 | CY |
$8.00 |
$7.75 |
$6.92 |
$8.35 |
$12.85 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 97,131 | CY |
$11.50 |
$8.70 |
$7.27 |
$9.35 |
$13.55 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$133,929.80 |
$122,000.00 |
$166,853.70 |
$145,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 11,999 | LF |
$5.00 |
$2.65 |
$2.55 |
$2.55 |
$3.25 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 7 | EA |
$425.00 |
$621.80 |
$595.00 |
$595.00 |
$700.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 840 | LF |
$18.50 |
$12.75 |
$12.20 |
$12.20 |
$9.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 302,781 | SY |
$3.50 |
$4.10 |
$3.90 |
$3.90 |
$4.20 |
| 90 | 232(B)9300 |
SEEDING METHOD B | 38.11 | AC |
$1,500.00 |
$2,607.30 |
$2,495.00 |
$2,495.00 |
$2,600.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 38.11 | AC |
$1,500.00 |
$1,828.75 |
$1,750.00 |
$1,750.00 |
$1,950.00 |
| 110 | 241 3100 |
MOWING | 125.12 | AC |
$275.00 |
$338.60 |
$324.00 |
$324.00 |
$400.00 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 71,420 | SY |
$9.00 |
$9.20 |
$9.37 |
$8.25 |
$11.65 |
| 130 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 208 | TON |
$85.00 |
$67.40 |
$65.88 |
$64.50 |
$44.50 |
| 140 | 407(B)7300 |
TACK COAT | 15,926 | GAL |
$4.50 |
$5.50 |
$2.92 |
$3.65 |
$4.10 |
| 150 | 408 8100 |
PRIME COAT | 26,846 | GAL |
$5.00 |
$5.45 |
$3.97 |
$4.00 |
$3.50 |
| 160 | 409(A)9200 |
FABRIC REINFORCEMENT | 12,866 | SY |
$6.00 |
$4.70 |
$2.38 |
$3.50 |
$2.85 |
| 170 | 409(B)9300 |
BITUMINOUS BINDER | 2,574 | GAL |
$6.50 |
$10.75 |
$4.31 |
$5.25 |
$4.10 |
| 180 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 12,186 | TON |
$145.00 |
$117.05 |
$142.05 |
$145.00 |
$150.00 |
| 190 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 20,358 | TON |
$140.00 |
$108.05 |
$134.42 |
$133.00 |
$122.55 |
| 200 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 7,103 | TON |
$160.00 |
$136.45 |
$145.54 |
$165.00 |
$126.80 |
| 210 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,953 | TON |
$150.00 |
$113.85 |
$139.77 |
$142.00 |
$128.25 |
| 220 | 412 3100 |
COLD MILLING PAVEMENT | 12,300 | SY |
$5.00 |
$6.50 |
$4.55 |
$3.85 |
$5.25 |
| 230 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 149 | CY |
$40.00 |
$31.35 |
$50.00 |
$50.00 |
$45.00 |
| 240 | 501(G)1810 |
CLSM BACKFILL | 203 | CY |
$350.00 |
$271.70 |
$400.00 |
$400.00 |
$265.00 |
| 250 | 509(A)0200 |
CLASS AA CONCRETE | 595 | CY |
$950.00 |
$679.25 |
$797.00 |
$797.00 |
$755.00 |
| 260 | 509(D)0500 |
CLASS C CONCRETE | 961 | CY |
$450.00 |
$292.60 |
$405.00 |
$405.00 |
$585.00 |
| 270 | 511(A)2200 |
REINFORCING STEEL | 85,824 | LB |
$2.00 |
$1.80 |
$1.50 |
$1.50 |
$1.65 |
| 280 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 400 | TON |
$100.00 |
$125.40 |
$115.00 |
$120.00 |
$78.00 |
| 290 | 609(B)4370 |
2'-8" COMB.CRB.& GUT.(6" MNTBLE) | 507 | LF |
$40.00 |
$88.85 |
$49.65 |
$50.00 |
$43.00 |
| 300 | 611(G)0354 |
INLET (SMD-TYPE 2) | 7 | EA |
$5,500.00 |
$2,560.25 |
$3,374.00 |
$5,735.00 |
$6,890.00 |
| 310 | 611(H)0990 |
ADD'L DEPTH IN INLET SMD TYPE 2 | 12.83 | VF |
$425.00 |
$564.70 |
$540.36 |
$832.00 |
$950.00 |
| 320 | 613(A)5208 |
18" R.C.PIPE CLASS III | 976 | LF |
$115.00 |
$92.00 |
$82.24 |
$88.00 |
$62.00 |
| 330 | 613(A)5216 |
24" R.C.PIPE CLASS III | 144 | LF |
$125.00 |
$109.75 |
$116.30 |
$105.00 |
$85.00 |
| 340 | 613(A)5220 |
30" R.C.PIPE CLASS III | 124 | LF |
$160.00 |
$130.65 |
$140.60 |
$125.00 |
$105.00 |
| 350 | 613(A)5224 |
36" R.C.PIPE CLASS III | 288 | LF |
$200.00 |
$193.35 |
$186.60 |
$185.00 |
$138.00 |
| 360 | 613(A)5228 |
42" R.C.PIPE CLASS III | 94 | LF |
$260.00 |
$214.25 |
$250.74 |
$205.00 |
$182.00 |
| 370 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 286 | LF |
$70.00 |
$50.70 |
$56.01 |
$48.50 |
$55.00 |
| 380 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 334 | LF |
$100.00 |
$72.40 |
$75.96 |
$69.25 |
$110.00 |
| 390 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 112 | LF |
$75.00 |
$40.25 |
$45.60 |
$38.50 |
$48.00 |
| 400 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,600.00 |
$2,607.30 |
$1,955.00 |
$2,495.00 |
$980.00 |
| 410 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$3,000.00 |
$2,868.55 |
$2,389.00 |
$2,745.00 |
$1,300.00 |
| 420 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$4,500.00 |
$5,481.05 |
$5,261.00 |
$5,245.00 |
$1,555.00 |
| 430 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 1 | EA |
$2,300.00 |
$3,657.50 |
$2,660.00 |
$2,660.00 |
$2,800.00 |
| 440 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$4,180.00 |
$3,695.00 |
$3,695.00 |
$3,650.00 |
| 450 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 4 | EA |
$3,200.00 |
$4,180.00 |
$4,095.00 |
$4,095.00 |
$3,855.00 |
| 460 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 8 | EA |
$3,000.00 |
$4,180.00 |
$3,350.00 |
$3,350.00 |
$3,800.00 |
| 470 | 613(M)7016 |
TYPE D6 CULVERT END TREATMENT | 4 | EA |
$4,200.00 |
$4,702.50 |
$5,540.00 |
$5,540.00 |
$5,000.00 |
| 480 | 613(M)7024 |
TYPE AA6 CULVERT END TREATMENT | 2 | EA |
$2,800.00 |
$5,225.00 |
$4,255.00 |
$4,255.00 |
$3,850.00 |
| 490 | 613(O)7212 |
SP. END SECTION OF 36" RCP ROUND | 2 | EA |
$2,500.00 |
$8,229.40 |
$7,900.00 |
$7,900.00 |
$6,800.00 |
| 500 | 613(W)8125 |
30" JACKED CONDUIT | 76 | LF |
$1,300.00 |
$1,124.20 |
$1,166.18 |
$1,160.00 |
$980.00 |
| 510 | 613(W)8130 |
36" JACKED CONDUIT | 320 | LF |
$1,200.00 |
$1,113.60 |
$1,286.47 |
$1,265.00 |
$1,120.00 |
| 520 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$48,540.25 |
$42,000.00 |
$46,450.00 |
$80,000.00 |
| 530 | 619(B)6300 |
REMOVAL OF HEADWALL | 34 | EA |
$1,750.00 |
$836.00 |
$1,250.00 |
$1,250.00 |
$1,800.00 |
| 540 | 619(B)6352 |
REMOVAL OF FENCE | 24,485 | LF |
$1.25 |
$0.6500 |
$0.6000 |
$0.6000 |
$1.65 |
| 550 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 34,163 | SY |
$9.00 |
$6.05 |
$11.58 |
$4.71 |
$5.50 |
| 560 | 619(B)6392 |
REMOVAL OF EXISTING STRUCTURES | 1 | EA |
$3,200.00 |
$2,612.50 |
$3,000.00 |
$2,500.00 |
$8,500.00 |
| 570 | 619(C)6600 |
SAWING PAVEMENT | 33,785 | LF |
$4.50 |
$4.75 |
$3.05 |
$1.40 |
$2.90 |
| 580 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 25,293 | LF |
$9.00 |
$5.90 |
$4.07 |
$4.07 |
$8.10 |
| 590 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 1 | EA |
$375.00 |
$261.25 |
$500.00 |
$500.00 |
$250.00 |
| 600 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 5,687 | CY |
$13.00 |
$5.25 |
$10.00 |
$10.00 |
$15.00 |
| 610 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 677 | CY |
$35.00 |
$31.35 |
$50.00 |
$50.00 |
$35.00 |
| 620 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$50,000.00 |
$36,575.00 |
$77,000.00 |
$77,000.00 |
$100,000.00 |
| 630 | 509(A)0210 |
CLASS AA CONCRETE | 1,882.3 | CY |
$850.00 |
$627.00 |
$402.00 |
$402.00 |
$720.00 |
| 640 | 511(A)2210 |
REINFORCING STEEL | 268,790 | LB |
$1.60 |
$1.65 |
$1.50 |
$1.50 |
$1.85 |
| 650 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$31,350.00 |
$10,000.00 |
$10,000.00 |
$65,000.00 |
| 660 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$65,000.00 |
$36,575.00 |
$30,000.00 |
$30,000.00 |
$120,000.00 |
| 670 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 69,770 | LF |
$0.5000 |
$0.2000 |
$0.1800 |
$0.1800 |
$0.4800 |
| 680 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,000 | LF |
$1.50 |
$3.20 |
$3.07 |
$3.07 |
$1.80 |
| 690 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 3,850 | EA |
$1.00 |
$1.60 |
$0.6500 |
$1.00 |
$1.20 |
| 700 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 2,178 | SD |
$18.00 |
$8.35 |
$8.00 |
$8.00 |
$6.00 |
| 710 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,625 | LF |
$30.00 |
$16.80 |
$16.10 |
$16.10 |
$65.00 |
| 720 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 3,925 | LF |
$5.50 |
$4.20 |
$4.00 |
$4.00 |
$35.00 |
| 730 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,998 | SD |
$0.3500 |
$3.15 |
$3.00 |
$3.00 |
$1.20 |
| 740 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 884 | SD |
$1.50 |
$20.90 |
$20.00 |
$30.00 |
$3.60 |
| 750 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,603 | SD |
$1.50 |
$3.15 |
$3.00 |
$3.00 |
$3.60 |
| 760 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 884 | SD |
$1.00 |
$31.35 |
$30.00 |
$40.00 |
$3.60 |
| 770 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 10,974 | SD |
$0.4000 |
$1.60 |
$1.50 |
$1.50 |
$0.6000 |
| 780 | 880(F)6700 |
DRUMS | 9,660 | SD |
$0.3000 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.6000 |
| 790 | 880(G)6805 |
CHANNELIZER CONES | 188,848 | SD |
$0.2500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.2400 |
| 800 | 880(I)7000 |
FLAGGER | 21 | SD |
$150.00 |
$270.30 |
$65.00 |
$1,790.00 |
$150.00 |
| 810 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,768 | SD |
$12.00 |
$12.55 |
$12.00 |
$12.00 |
$12.00 |
| 820 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 22,916 | LF |
$0.5000 |
$0.4500 |
$0.4700 |
$0.4300 |
$0.3600 |
| 830 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 44,800 | LF |
$0.2500 |
$0.2500 |
$0.3000 |
$0.2400 |
$0.3600 |
| 840 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$375.00 |
$287.40 |
$275.00 |
$275.00 |
$300.00 |
| 850 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 66 | SF |
$45.00 |
$120.20 |
$115.00 |
$115.00 |
$60.00 |
| 860 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 134 | LF |
$20.00 |
$9.40 |
$9.00 |
$9.00 |
$30.00 |
| 870 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 70,678 | LF |
$1.25 |
$1.00 |
$0.7000 |
$0.7000 |
$0.7800 |
| 880 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 852 | LF |
$3.00 |
$3.75 |
$3.60 |
$3.60 |
$6.00 |
| 890 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 43 | LF |
$18.00 |
$13.30 |
$12.75 |
$12.75 |
$24.00 |
| 900 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 3 | EA |
$275.00 |
$627.00 |
$600.00 |
$600.00 |
$360.00 |
| 910 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$95,095.00 |
$33,000.00 |
$139,000.00 |
$120,000.00 |
| 920 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$15,900.00 |
$2,057.99 |
$30,000.00 |
$6,500.00 |
| 930 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$779,000.00 |
$801,580.45 |
$677,937.47 |
$748,000.00 |
$780,000.00 |