| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 186,615 | CY |
$7.00 |
$4.75 |
$7.01 |
$11.50 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 18,432 | CY |
$10.50 |
$1.00 |
$0.0100 |
$12.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$72,300.00 |
$169,000.28 |
$99,030.49 |
$55,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 60,630 | LF |
$3.40 |
$3.73 |
$4.09 |
$3.50 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 1,820 | LF |
$15.20 |
$12.78 |
$14.01 |
$12.00 |
| 60 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 13 | EA |
$438.00 |
$532.50 |
$583.91 |
$500.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 64,988 | SY |
$3.25 |
$4.80 |
$2.94 |
$2.52 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 16 | AC |
$1,000.00 |
$1,520.00 |
$1,751.72 |
$1,500.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 5,817 | CY |
$65.00 |
$80.00 |
$105.01 |
$87.56 |
| 100 | 307(K)4200 |
STABILIZED SUBGRADE | 599,988 | SY |
$7.50 |
$4.00 |
$10.28 |
$11.00 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,510 | TON |
$38.00 |
$46.00 |
$61.26 |
$42.08 |
| 120 | 407(B)7300 |
TACK COAT | 5,634 | GAL |
$4.00 |
$4.33 |
$8.16 |
$4.07 |
| 130 | 408 8100 |
PRIME COAT | 26,068 | GAL |
$3.50 |
$0.2500 |
$7.54 |
$6.01 |
| 140 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 90,924 | TON |
$90.00 |
$88.00 |
$78.18 |
$88.33 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,725 | TON |
$120.00 |
$119.40 |
$163.49 |
$112.11 |
| 155 | 412 3100 |
COLD MILLING PAVEMENT | 17,378 | SY |
$3.85 |
$3.00 |
$3.29 |
$2.82 |
| 160 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 204,316 | SY |
$10.00 |
$8.00 |
$6.88 |
$17.50 |
| 170 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 325,931 | SY |
$16.00 |
$15.81 |
$12.62 |
$25.75 |
| 180 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 124,639 | CY |
$165.00 |
$186.00 |
$198.62 |
$169.50 |
| 181 | 509(A)0200 |
CLASS AA CONCRETE | 391 | CY |
$705.00 |
$300.00 |
$326.69 |
$800.00 |
| 190 | 609(A)4230 |
CONC.CURB(6" BARRIER-INTEGRAL) | 1,304 | LF |
$13.00 |
$21.03 |
$6.95 |
$28.09 |
| 200 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 369,242 | SY |
$10.10 |
$11.00 |
$20.44 |
$13.00 |
| 210 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 118,566 | SY |
$4.50 |
$8.00 |
$3.63 |
$3.11 |
| 220 | 619(B)6368 |
REMOVAL OF DRAINAGE INLETS | 10 | EA |
$1,005.00 |
$500.00 |
$1,242.26 |
$1,841.11 |
| 230 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 6,267 | LF |
$6.80 |
$6.39 |
$7.01 |
$5.50 |
| 240 | 619(B)6400 |
REMOVAL OF CURB | 4,155 | LF |
$10.50 |
$10.00 |
$5.02 |
$7.97 |
| 250 | 619(B)6416 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 9,119 | LF |
$14.00 |
$16.00 |
$9.63 |
$14.61 |
| 260 | 619(C)6600 |
SAWING PAVEMENT | 61,628 | LF |
$3.50 |
$2.00 |
$6.31 |
$4.00 |
| 270 | 623 1100 |
(PL)GUARDRAIL CURBING | 15 | EA |
$1,500.00 |
$1,200.00 |
$2,729.78 |
$1,695.76 |
| 280 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 13,987.5 | LF |
$21.00 |
$24.21 |
$26.54 |
$25.00 |
| 290 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 34 | EA |
$1,600.00 |
$1,173.63 |
$1,286.93 |
$1,900.00 |
| 300 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 43 | EA |
$3,000.00 |
$4,027.83 |
$4,416.67 |
$3,200.00 |
| 310 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 15 | EA |
$3,400.00 |
$3,999.08 |
$4,385.14 |
$2,000.00 |
| 320 | 627(A)6200 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 6,878 | LF |
$72.00 |
$69.00 |
$49.30 |
$100.00 |
| 330 | 627(B)6300 |
CONCRETE LONGITUDINAL BARRIER END SEC. | 10 | EA |
$2,300.00 |
$4,400.00 |
$5,693.18 |
$4,000.00 |
| 340 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 184 | CY |
$10.00 |
$30.00 |
$11.68 |
$48.95 |
| 350 | 504(E)5500 |
CONCRETE PARAPET | 320 | LF |
$175.00 |
$300.00 |
$151.37 |
$475.00 |
| 360 | 413(C)4400 |
RUMBLE STRIP-METHOD PCC-CON | 208,614 | LF |
$0.6500 |
$0.7800 |
$0.3400 |
$0.7300 |
| 370 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 39,101 | LF |
$5.00 |
$10.00 |
$10.72 |
$5.00 |
| 380 | 628(B)7300 |
HIGH-TENSION CABLE BARRIER(TL-4) | 39,101 | LF |
$20.00 |
$13.37 |
$14.66 |
$26.00 |
| 390 | 628(C)7400 |
END ANCHORS | 26 | EA |
$7,000.00 |
$3,594.38 |
$3,941.37 |
$4,500.00 |
| 400 | 628(E)7600 |
CABLE BARRIER TENSION METER | 1 | EA |
$5,600.00 |
$3,834.00 |
$4,204.12 |
$5,265.00 |
| 410 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 8 | EA |
$151.60 |
$133.13 |
$145.98 |
$100.00 |
| 420 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 57 | EA |
$300.00 |
$234.30 |
$256.92 |
$350.00 |
| 430 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 112 | SF |
$66.10 |
$63.90 |
$70.07 |
$35.00 |
| 440 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 200 | EA |
$75.00 |
$69.23 |
$75.91 |
$95.00 |
| 450 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 270 | EA |
$18.50 |
$15.98 |
$17.52 |
$65.00 |
| 460 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 271,302 | LF |
$0.8000 |
$0.6800 |
$0.7500 |
$0.8000 |
| 470 | 856(A)8211 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(8" WIDE) | 3,491 | LF |
$1.30 |
$1.12 |
$1.23 |
$8.00 |
| 480 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 2,363 | LF |
$1.75 |
$2.88 |
$3.15 |
$12.00 |
| 490 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 10 | EA |
$343.90 |
$234.30 |
$256.92 |
$500.00 |
| 500 | 871(A)2200 |
IMPACT ATTENUATOR | 13 | EA |
$37,500.00 |
$33,669.98 |
$36,920.39 |
$32,000.00 |
| 510 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 616,730 | LF |
$0.1300 |
$0.1500 |
$0.1600 |
$0.4800 |
| 520 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 583,914 | LF |
$0.3500 |
$0.1500 |
$0.1600 |
$0.2000 |
| 530 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,640 | SD |
$15.00 |
$12.00 |
$11.68 |
$25.00 |
| 540 | 871(C)2410 |
RELOCATION OF IMPACT ATTENUATOR | 29 | EA |
$200.00 |
$500.00 |
$525.52 |
$300.00 |
| 550 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 104,490 | LF |
$25.00 |
$16.75 |
$25.58 |
$32.00 |
| 560 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 216,110 | LF |
$3.20 |
$2.00 |
$2.69 |
$8.00 |
| 570 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 2,320 | SD |
$6.00 |
$1.10 |
$1.17 |
$10.00 |
| 580 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,540 | SD |
$0.4000 |
$8.00 |
$6.66 |
$3.00 |
| 590 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 13,610 | SD |
$1.30 |
$0.0200 |
$0.0200 |
$4.00 |
| 600 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 11,050 | SD |
$1.30 |
$0.0200 |
$0.0200 |
$8.00 |
| 610 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,382 | SD |
$2.30 |
$15.00 |
$14.01 |
$3.00 |
| 620 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 25,260 | SD |
$0.2500 |
$0.0200 |
$0.0200 |
$1.00 |
| 630 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 8,550 | SD |
$0.1000 |
$0.0200 |
$0.0200 |
$1.00 |
| 640 | 880(F)6700 |
DRUMS | 116,397 | SD |
$0.3000 |
$0.0200 |
$0.0200 |
$1.00 |
| 650 | 880(G)6805 |
CHANNELIZER CONES | 81,340 | SD |
$0.7000 |
$0.0200 |
$0.0200 |
$1.00 |
| 660 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 3,250 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 670 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 2,376 | SD |
$14.90 |
$5.33 |
$5.84 |
$55.00 |
| 680 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$230,917.00 |
$82,792.40 |
$288,000.00 |
| 690 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$13,000.00 |
$30,000.00 |
$422,000.00 |
$22,000.00 |
| 700 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$2,241,075.00 |
|
|
|