Bid tab 260114

Let May 7, 2026 · Division 5 · Beckham Sign up free

‹ May 2026 results

Widen, Resurface And Bridge

Let date
Thursday, May 7, 2026
Contract
260114 · job page
J/P numbers
34239(04)
District
Division 5
County
Beckham
Highway
SH-152
Limits
SH-152: FROM THE JUNCTION OF SH-6, EXTEND WEST NEAR SAYRE.
Classification
Widen, Resurface And Bridge
Project number
STP-205C(121)PM
Working days
340

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$14,889,228
1 Caswell Contracting, Inc. Low bidder $11,155,419 -25.1%
2 SEWELL BROS., INC. $11,766,691 -21.0% +5.5%
3 CORNELL CONSTRUCTION COMPANY, INC. $12,033,284 -19.2% +7.9%
4 OVERLAND CORPORATION $12,516,492 -15.9% +12.2%
5 THE CUMMINS CONSTRUCTION CO., INC. $13,600,426 -8.7% +21.9%
6 BRIDGECO CONTRACTORS, INC. $14,522,900 -2.5% +30.2%
7 J&R Constructors Group $14,984,183 +0.6% +34.3%
8 Robinson Construction, LLC $15,466,517 +3.9% +38.6%

Bid tab: unit prices 74 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Caswell Contrac…#2 SEWELL BROS., I…#3 CORNELL CONSTRU…#4 OVERLAND CORPOR…#5 THE CUMMINS CON…#6 BRIDGECO CONTRA…#7 J&R Constructor…#8 Robinson Constr…
10201(A)1200 CLEARING AND GRUBBING1LSUM $35,000.00 $25,000.00 $25,000.00 $46,000.00 $75,000.00 $26,500.00 $125,000.00 $46,000.00 $110,000.00
20202(A)2200 UNCLASSIFIED EXCAVATION121,463CY $10.00 $6.50 $6.50 $6.50 $6.25 $7.55 $5.90 $6.50 $12.55
30205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $165,000.00 $145,000.00 $145,000.00 $105,912.00 $105,912.00 $153,700.00 $97,650.00 $105,912.00 $150,000.00
40221(B)2300 TEMPORARY SILT FENCE14,065LF $3.00 $3.50 $3.70 $3.50 $3.50 $3.00 $2.75 $3.50 $4.20
50221(E)2600 TEMPORARY SILT DIKE1,484LF $13.00 $11.00 $11.50 $11.00 $11.00 $10.60 $16.00 $11.00 $12.35
60230(A)7200 SOLID SLAB SODDING168,102SY $3.50 $3.16 $3.30 $3.16 $3.16 $3.25 $3.05 $3.16 $3.55
70241 3100 MOWING105AC $240.00 $150.00 $155.00 $150.00 $150.00 $159.00 $230.00 $150.00 $150.00
80402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E2,327TON $45.00 $47.00 $47.00 $42.00 $42.00 $51.25 $51.91 $42.00 $38.65
90407(B)7300 TACK COAT39,695GAL $4.00 $3.06 $3.10 $2.86 $3.37 $4.90 $3.22 $3.25 $3.90
100408 8100 PRIME COAT49,196GAL $4.50 $0.0100 $0.0100 $0.1000 $3.83 $4.90 $4.30 $4.05 $3.10
110411(B)1330 SUPERPAVE, TYPE S3(PG 64-22 OK)21,327TON $115.00 $91.65 $95.00 $98.55 $115.00 $104.80 $136.43 $135.00 $121.85
120411(C)1400 SUPERPAVE, TYPE S4(PG 76-28 OK)15,625TON $130.00 $110.50 $114.50 $113.83 $130.00 $134.15 $137.60 $177.00 $122.55
130411(J)2100 (SP) RICH INTERMEDIATE LAYER7,794TON $165.00 $125.60 $129.00 $136.55 $132.35 $159.40 $139.60 $200.00 $138.00
140412 3100 COLD MILLING PAVEMENT81,081SY $3.50 $1.78 $1.83 $2.81 $2.50 $5.05 $3.75 $2.65 $4.10
150501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED59CY $35.00 $17.00 $17.00 $50.00 $29.80 $18.05 $67.00 $50.00 $35.00
160509(A)0200 CLASS AA CONCRETE972CY $800.00 $650.00 $650.00 $772.00 $581.80 $770.80 $750.91 $772.00 $810.00
170509(D)0500 CLASS C CONCRETE2,755CY $500.00 $400.00 $420.00 $490.00 $361.60 $289.10 $488.75 $490.00 $635.00
180511(A)2200 REINFORCING STEEL136,391LB $1.50 $1.15 $1.15 $1.50 $1.35 $1.25 $1.57 $1.50 $1.85
190601(A)1100 TYPE I PLAIN RIPRAP1,720TON $55.00 $73.00 $73.00 $65.00 $65.00 $77.40 $72.67 $65.00 $76.00
200601(B)1200 TYPE I PLAIN RIPRAP WITH FILTER BLANKET5,002TON $55.00 $73.00 $73.00 $65.00 $65.00 $77.40 $77.37 $65.00 $48.00
210613(A)5216 24" R.C.PIPE CLASS III178LF $140.00 $90.00 $90.00 $97.00 $97.00 $95.40 $145.00 $97.00 $105.00
220613(A)5350 22" X 13" R.C.PIPE ARCH CLASS A-III112LF $90.00 $120.00 $120.00 $75.00 $75.00 $127.20 $130.00 $75.00 $85.00
230613(B)5536 48" CORR. GALV. STEEL PIPE140LF $140.00 $130.00 $130.00 $134.00 $134.00 $137.80 $137.00 $134.00 $180.00
240613(B)5604 21" X 15" CORR. GALV. STEEL PIPE ARCH1,806LF $65.00 $50.00 $50.00 $45.00 $45.00 $53.00 $81.00 $45.00 $38.00
250613(B)5612 28" X 20" CORR. GALV. STEEL PIPE ARCH294LF $75.00 $60.00 $60.00 $61.00 $61.00 $63.60 $92.00 $61.00 $58.00
260613(M)6960 TYPE A4 CULVERT END TREATMENT9EA $1,500.00 $2,500.00 $2,630.00 $2,045.00 $1,552.20 $848.00 $1,850.00 $2,045.00 $2,100.00
270613(M)6964 TYPE B4 CULVERT END TREATMENT6EA $2,000.00 $2,800.00 $2,930.00 $2,525.00 $2,067.15 $954.00 $2,100.00 $2,525.00 $2,350.00
280613(M)6980 TYPE AA4 CULVERT END TREATMENT14EA $2,750.00 $3,500.00 $3,650.00 $2,985.00 $2,769.80 $3,180.00 $2,950.00 $2,985.00 $3,400.00
290613(M)6984 TYPE BB4 CULVERT END TREATMENT3EA $3,500.00 $2,800.00 $3,960.00 $4,125.00 $3,088.10 $3,710.00 $3,600.00 $4,125.00 $4,100.00
300613(M)6996 TYPE EE4 CULVERT END TREATMENT1EA $4,750.00 $5,000.00 $5,200.00 $7,280.00 $4,001.60 $4,240.00 $4,230.00 $7,280.00 $5,320.00
310613(M)7004 TYPE A6 CULVERT END TREATMENT9EA $2,500.00 $3,300.00 $3,455.00 $2,570.00 $2,703.40 $2,120.00 $2,100.00 $2,570.00 $2,650.00
320613(M)7008 TYPE B6 CULVERT END TREATMENT4EA $3,000.00 $3,800.00 $3,945.00 $3,170.00 $2,914.10 $2,650.00 $2,700.00 $3,170.00 $3,200.00
330613(M)7024 TYPE AA6 CULVERT END TREATMENT14EA $3,250.00 $4,500.00 $4,655.00 $4,025.00 $4,001.80 $3,180.00 $3,670.00 $4,025.00 $3,400.00
340613(M)7028 TYPE BB6 CULVERT END TREATMENT1EA $5,000.00 $5,000.00 $5,200.00 $4,670.00 $4,210.30 $4,240.00 $4,000.00 $4,670.00 $5,400.00
350613(M)7040 TYPE EE6 CULVERT END TREATMENT1EA $10,000.00 $7,000.00 $7,500.00 $9,280.00 $4,788.92 $5,300.00 $5,200.00 $9,280.00 $9,800.00
360619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $75,000.00 $40,000.00 $40,000.00 $50,000.00 $50,000.00 $42,400.00 $87,000.00 $50,000.00 $110,000.00
370619(B)6352 REMOVAL OF FENCE41,867LF $3.00 $0.7000 $0.8000 $0.7000 $2.00 $0.7500 $2.00 $1.00 $1.65
380619(B)6364 REMOVAL OF ASPHALT PAVEMENT15,333SY $8.00 $1.04 $1.07 $3.30 $5.48 $17.40 $6.45 $8.25 $8.00
390619(B)6384 REMOVAL OF ASPHALT DRIVEWAY1,055SY $12.00 $9.55 $9.85 $10.08 $6.00 $21.65 $18.00 $10.00 $12.00
400624 3100 (PL) ORNAMENTAL FENCE259LF $120.00 $88.00 $68.00 $88.00 $88.00 $93.30 $74.00 $62.00 $74.55
410624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)30,880LF $10.00 $6.20 $6.60 $6.20 $6.20 $6.60 $7.10 $6.00 $7.20
420629(D)7500 REMOVE AND RESET MAILBOX2EA $250.00 $250.00 $300.00 $250.00 $250.00 $265.00 $375.00 $500.00 $250.00
430501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED305CY $25.00 $17.00 $17.00 $50.00 $26.40 $18.05 $35.00 $50.00 $35.00
440509(A)0210 CLASS AA CONCRETE493.5CY $800.00 $650.00 $650.00 $545.00 $589.80 $689.00 $710.00 $545.00 $920.00
450511(A)2210 REINFORCING STEEL66,775LB $1.50 $1.15 $1.15 $1.50 $1.35 $1.25 $1.61 $1.50 $1.90
460619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $50,000.00 $15,000.00 $15,000.00 $30,000.00 $7,500.00 $15,900.00 $58,000.00 $60,000.00 $80,000.00
470501(A)1210 STRUCTURAL EXCAVATION UNCLASSIFIED215CY $25.00 $17.00 $17.00 $50.00 $26.40 $18.02 $45.00 $50.00 $25.00
480502 3100 TEMPORARY EARTH RETAINAGE1LSUM $50,000.00 $20,000.00 $20,000.00 $42,000.00 $15,000.00 $21,200.00 $72,000.00 $42,000.00 $80,000.00
490509(A)0210 CLASS AA CONCRETE353.3CY $800.00 $650.00 $650.00 $686.50 $589.80 $689.00 $790.00 $686.50 $995.00
500511(A)2210 REINFORCING STEEL46,300LB $1.50 $1.15 $1.15 $1.50 $1.35 $1.25 $1.61 $1.50 $1.90
510619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $5,000.00 $5,000.00 $15,000.00 $7,500.00 $5,300.00 $28,000.00 $25,000.00 $60,000.00
520823 6100 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM960SD $170.00 $55.00 $47.00 $10.00 $45.00 $47.70 $74.80 $60.00 $72.00
530857(A)9205 CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE)422,188LF $0.5000 $0.1100 $0.1300 $0.1100 $0.1100 $0.1500 $0.1200 $0.1000 $0.1200
540857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)109,616LF $0.3500 $0.2000 $0.2200 $0.2000 $0.2000 $0.2500 $0.5900 $0.3400 $0.4100
550858(A)0212 PAVE.MARKERS CLASS A TYPE 210,873EA $1.75 $5.00 $5.25 $5.00 $5.00 $5.30 $5.13 $4.75 $5.70
560858(A)0284 PAVE.MARKERS CLASS D TYPE 210,873EA $1.75 $5.00 $5.25 $5.00 $5.00 $5.30 $5.13 $4.75 $5.70
570880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF16,560SD $0.6000 $0.2500 $0.2700 $0.2500 $0.2500 $0.2500 $0.1200 $0.1000 $0.1200
580880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF4,000SD $2.00 $0.5000 $0.5200 $0.5000 $0.5000 $0.5500 $1.07 $1.00 $1.20
590880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF5,980SD $2.50 $3.00 $3.15 $3.00 $3.00 $3.20 $0.3300 $0.3000 $0.3600
600880(C)6410 CONSTRUCTION BARRICADES(TYPE III)7,760SD $2.00 $0.2000 $0.2200 $0.2000 $0.2000 $0.2500 $0.0700 $0.0500 $0.0600
610880(E)6607 WARNING LIGHTS(TYPE B)4,820SD $1.25 $5.00 $5.25 $5.50 $5.00 $5.30 $2.40 $2.25 $2.70
620880(E)6610 WARNING LIGHTS(TYPE C)15,380SD $0.3500 $0.1000 $0.1200 $0.1000 $0.1000 $0.1500 $0.5900 $0.5500 $0.6600
630880(F)6700 DRUMS15,380SD $1.00 $1.00 $1.05 $1.25 $1.00 $1.05 $0.9400 $0.8500 $1.02
640882(A)8210 PORT.CHANGEABLE MESSAGE SIGN2,866SD $20.00 $8.00 $8.50 $8.00 $8.00 $8.50 $9.84 $9.00 $10.80
650413(A)4200 RUMBLE STRIP-METHOD HMA-CON61,400LF $1.00 $0.1900 $0.4000 $0.2200 $0.2600 $0.2000 $0.3300 $0.2900 $0.3500
660413(A)4210 RUMBLE STRIP-CENTERLINE HMA-CON30,675LF $0.5000 $0.2800 $0.6000 $0.3500 $0.2800 $0.3000 $0.1800 $0.1600 $0.1900
670850(A)1200 SHEET ALUMINUM SIGNS261SF $75.00 $50.00 $53.00 $50.00 $50.00 $53.00 $66.00 $62.00 $74.40
680851(C)2430 2 1/2" SQUARE TUBE POST342LF $20.00 $9.00 $10.00 $9.00 $9.00 $9.55 $12.00 $10.00 $12.00
690856(A)8207 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE)117,325LF $0.9000 $0.6900 $0.7200 $0.6900 $0.6900 $0.7500 $0.7600 $0.7100 $0.8500
700856(A)8215 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE)730LF $3.50 $3.50 $4.00 $3.50 $3.50 $3.75 $3.20 $2.85 $3.42
710856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)24LF $30.00 $25.00 $30.00 $25.00 $25.00 $26.50 $14.00 $10.00 $12.00
720642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $75,000.00 $52,500.00 $100,000.00 $15,000.00 $139,000.00 $101,230.00 $100,800.00 $91,000.00 $155,000.00
730220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $5,000.00 $5,000.00 $800.00 $50,000.00 $15,900.00 $6,000.00 $35,605.32 $5,500.00
740641 2110 MOBILIZATION1LSUM $634,670.00 $251,250.00 $500,000.00 $428,951.47 $560,000.00 $821,829.28 $723,005.00 $670,000.00 $680,000.00