| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$55,000.00 |
$25,235.00 |
$24,314.81 |
$10,100.00 |
$153,000.00 |
$50,000.00 |
$53,097.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 29,431 | CY |
$12.00 |
$7.11 |
$7.61 |
$8.50 |
$5.25 |
$12.00 |
$15.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 14,837 | CY |
$11.00 |
$9.75 |
$10.12 |
$8.50 |
$6.75 |
$19.00 |
$15.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$35,000.00 |
$12,978.00 |
$16,203.48 |
$37,500.00 |
$20,000.00 |
$50,000.00 |
$52,823.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 5,918 | LF |
$3.25 |
$2.93 |
$3.14 |
$3.50 |
$4.38 |
$4.40 |
$5.00 |
| 60 | 221(D)2500 |
TEMPORARY SEDIMENT BASIN | 4 | EA |
$3,000.00 |
$412.00 |
$488.00 |
$800.00 |
$500.00 |
$3,200.00 |
$500.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 312 | LF |
$17.00 |
$20.60 |
$22.00 |
$26.95 |
$21.00 |
$20.00 |
$25.00 |
| 80 | 221(K)3204 |
TEMPORARY SEDIMENT CONTROL DEVICE | 35,703 | SY |
$1.00 |
$2.06 |
$2.20 |
$7.65 |
$3.00 |
$3.05 |
$4.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 23,016 | SY |
$3.75 |
$2.83 |
$3.03 |
$7.65 |
$6.45 |
$3.80 |
$4.00 |
| 100 | 233(A)0200 |
VEGETATIVE MULCHING | 13 | AC |
$1,300.00 |
$1,030.00 |
$1,100.00 |
$1,975.00 |
$3,985.00 |
$3,000.00 |
$1,100.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 3,582 | CY |
$80.00 |
$88.03 |
$65.41 |
$83.90 |
$75.00 |
$72.00 |
$65.00 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 24,863 | SY |
$10.00 |
$9.04 |
$8.23 |
$11.55 |
$8.50 |
$11.00 |
$11.00 |
| 130 | 325 0100 |
SEPARATOR FABRIC | 24,150 | SY |
$3.00 |
$1.44 |
$1.91 |
$2.00 |
$1.79 |
$3.00 |
$2.00 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,066 | TON |
$35.00 |
$35.31 |
$32.69 |
$41.70 |
$45.00 |
$48.00 |
$38.00 |
| 150 | 407(A)7200 |
FOG SEAL | 1,828 | GAL |
$5.00 |
$4.84 |
$6.68 |
$5.20 |
$5.00 |
$5.20 |
$5.48 |
| 160 | 407(B)7300 |
TACK COAT | 4,942 | GAL |
$4.00 |
$5.15 |
$4.00 |
$6.00 |
$3.75 |
$5.50 |
$5.80 |
| 170 | 408 8100 |
PRIME COAT | 13,172 | GAL |
$5.00 |
$4.99 |
$4.52 |
$5.35 |
$4.50 |
$5.35 |
$5.66 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,441 | TON |
$125.00 |
$88.68 |
$110.58 |
$98.65 |
$104.00 |
$94.00 |
$110.00 |
| 190 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,337 | TON |
$130.00 |
$93.00 |
$112.98 |
$109.00 |
$115.00 |
$110.00 |
$110.00 |
| 200 | 411(J)2100 |
(SP) RICH INTERMEDIATE LAYER | 2,228 | TON |
$150.00 |
$131.01 |
$165.68 |
$139.45 |
$150.00 |
$140.00 |
$148.33 |
| 210 | 412 3100 |
COLD MILLING PAVEMENT | 18,253 | SY |
$3.75 |
$3.14 |
$2.87 |
$3.55 |
$2.00 |
$3.30 |
$5.00 |
| 220 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 11 | CY |
$30.00 |
$20.60 |
$92.61 |
$30.00 |
$35.00 |
$26.00 |
$75.00 |
| 230 | 509(A)0200 |
CLASS AA CONCRETE | 73 | CY |
$750.00 |
$845.42 |
$1,064.69 |
$610.00 |
$997.35 |
$1,000.00 |
$1,200.00 |
| 240 | 509(D)0500 |
CLASS C CONCRETE | 289 | CY |
$375.00 |
$407.34 |
$437.77 |
$495.00 |
$425.00 |
$535.00 |
$500.00 |
| 250 | 511(A)2200 |
REINFORCING STEEL | 11,958 | LB |
$1.50 |
$1.75 |
$1.44 |
$1.60 |
$1.26 |
$1.30 |
$2.00 |
| 260 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 1,204 | TON |
$80.00 |
$79.86 |
$58.96 |
$85.00 |
$92.34 |
$62.00 |
$70.00 |
| 270 | 613(A)5232 |
48" R.C.PIPE CLASS III | 260 | LF |
$200.00 |
$199.88 |
$205.55 |
$245.00 |
$275.50 |
$300.00 |
$350.00 |
| 280 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 144 | LF |
$60.00 |
$56.62 |
$56.12 |
$59.40 |
$56.00 |
$50.00 |
$51.30 |
| 290 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 256 | LF |
$75.00 |
$69.28 |
$73.73 |
$68.00 |
$75.00 |
$70.00 |
$60.00 |
| 300 | 613(B)5544 |
60" CORR. GALV. STEEL PIPE | 160 | LF |
$200.00 |
$185.47 |
$152.68 |
$165.00 |
$155.00 |
$180.00 |
$187.00 |
| 310 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 9,700 | LF |
$15.00 |
$14.06 |
$12.95 |
$23.00 |
$15.50 |
$20.00 |
$25.00 |
| 320 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 680 | LF |
$20.00 |
$14.08 |
$19.38 |
$23.00 |
$32.00 |
$20.00 |
$25.00 |
| 330 | 613(L)6736 |
48" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$3,475.00 |
$4,182.63 |
$4,567.12 |
$5,216.00 |
$4,950.00 |
$6,000.00 |
$3,110.00 |
| 340 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$2,358.38 |
$2,972.95 |
$4,500.00 |
$2,800.00 |
$4,000.00 |
$10,000.00 |
| 350 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 10 | EA |
$2,500.00 |
$2,531.60 |
$3,225.49 |
$2,300.00 |
$3,000.00 |
$5,200.00 |
$9,000.00 |
| 360 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 34 | EA |
$500.00 |
$741.60 |
$293.34 |
$531.00 |
$1,060.00 |
$470.00 |
$420.00 |
| 370 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$24,720.00 |
$32,130.77 |
$9,000.00 |
$110,000.00 |
$15,000.00 |
$45,000.00 |
| 380 | 619(B)6352 |
REMOVAL OF FENCE | 8,328 | LF |
$2.50 |
$0.5600 |
$0.6000 |
$2.50 |
$1.00 |
$1.50 |
$1.00 |
| 390 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 10,345 | SY |
$8.50 |
$6.74 |
$5.23 |
$5.85 |
$10.00 |
$6.00 |
$4.00 |
| 400 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 3,086 | LF |
$6.00 |
$4.12 |
$5.24 |
$2.10 |
$2.00 |
$4.00 |
$4.00 |
| 410 | 619(C)6600 |
SAWING PAVEMENT | 7,100 | LF |
$4.00 |
$5.15 |
$5.30 |
$4.50 |
$5.00 |
$5.00 |
$6.00 |
| 420 | 624(A)3200 |
FENCE-STYLE WWF | 1,239 | LF |
$14.00 |
$12.36 |
$6.60 |
$12.85 |
$8.30 |
$7.30 |
$17.50 |
| 430 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$290.00 |
$103.00 |
$110.00 |
$400.00 |
$100.00 |
$410.00 |
$130.00 |
| 440 | 501(G)1800 |
CLSM BACKFILL | 100.5 | CY |
$350.00 |
$387.23 |
$302.72 |
$215.00 |
$275.00 |
$500.00 |
$475.00 |
| 450 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$10,300.00 |
$13,332.10 |
$10,000.00 |
$30,000.00 |
$20,000.00 |
$30,000.00 |
| 460 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,020 | CY |
$12.00 |
$10.30 |
$20.57 |
$11.00 |
$16.25 |
$15.00 |
$18.00 |
| 470 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 211 | CY |
$30.00 |
$20.60 |
$27.53 |
$25.00 |
$35.00 |
$40.00 |
$33.00 |
| 480 | 509(A)0210 |
CLASS AA CONCRETE | 487.4 | CY |
$750.00 |
$742.42 |
$665.55 |
$595.00 |
$653.40 |
$1,000.00 |
$800.00 |
| 490 | 511(A)2210 |
REINFORCING STEEL | 80,050 | LB |
$1.50 |
$1.24 |
$1.44 |
$1.65 |
$1.24 |
$1.50 |
$1.30 |
| 500 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$20,600.00 |
$27,464.21 |
$10,000.00 |
$56,000.00 |
$70,000.00 |
$55,000.00 |
| 510 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 8,912 | LF |
$0.7500 |
$0.2000 |
$0.2200 |
$0.6500 |
$0.2000 |
$0.3300 |
$0.2600 |
| 520 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 2,000 | EA |
$0.8000 |
$0.3600 |
$0.3900 |
$6.00 |
$0.3500 |
$1.25 |
$0.4600 |
| 530 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 144 | SD |
$19.00 |
$10.30 |
$11.00 |
$27.50 |
$10.00 |
$16.50 |
$13.00 |
| 540 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 200 | LF |
$30.00 |
$56.65 |
$72.61 |
$80.00 |
$95.00 |
$22.00 |
$40.00 |
| 550 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,872 | SD |
$0.8000 |
$0.5100 |
$0.5500 |
$0.3500 |
$0.5000 |
$0.2800 |
$0.6500 |
| 560 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,872 | SD |
$1.25 |
$1.03 |
$1.10 |
$0.1000 |
$1.00 |
$0.2800 |
$1.30 |
| 570 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,232 | SD |
$1.75 |
$3.09 |
$3.30 |
$3.00 |
$3.00 |
$0.2800 |
$3.91 |
| 580 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 432 | SD |
$2.00 |
$3.09 |
$3.30 |
$3.00 |
$3.00 |
$6.60 |
$3.91 |
| 590 | 880(D)6500 |
VERTICAL PANELS | 2,304 | SD |
$0.5000 |
$1.03 |
$1.10 |
$1.00 |
$1.00 |
$0.2800 |
$1.30 |
| 600 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 1,224 | SD |
$1.00 |
$1.03 |
$1.10 |
$3.75 |
$1.00 |
$3.85 |
$1.30 |
| 610 | 880(F)6700 |
DRUMS | 7,632 | SD |
$0.5000 |
$0.3600 |
$0.3800 |
$0.2500 |
$0.3500 |
$0.1100 |
$0.4600 |
| 620 | 880(G)6800 |
TUBE CHANNELIZERS | 3,960 | SD |
$0.7500 |
$0.3600 |
$0.3800 |
$0.1000 |
$0.3500 |
$0.2800 |
$0.4600 |
| 630 | 880(I)7000 |
FLAGGER | 108 | SD |
$200.00 |
$103.00 |
$147.78 |
$250.00 |
$200.00 |
$170.00 |
$300.00 |
| 640 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 72 | SD |
$30.00 |
$25.75 |
$27.50 |
$25.00 |
$25.00 |
$22.00 |
$29.15 |
| 650 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 14,600 | LF |
$1.50 |
$0.2500 |
$0.2800 |
$1.50 |
$0.4900 |
$0.3000 |
$0.3300 |
| 660 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 9 | SF |
$50.00 |
$25.75 |
$27.50 |
$110.00 |
$25.00 |
$55.00 |
$28.00 |
| 670 | 851(C)2415 |
2" SQUARE TUBE POST | 15 | LF |
$14.00 |
$10.30 |
$11.00 |
$15.00 |
$10.00 |
$11.00 |
$13.00 |
| 680 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 23,590 | LF |
$1.15 |
$0.6100 |
$0.6600 |
$0.9500 |
$0.6000 |
$0.8000 |
$0.7800 |
| 690 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$31,415.00 |
$21,486.53 |
$18,000.00 |
$75,000.00 |
$33,700.00 |
$30,000.00 |
| 700 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$3,090.00 |
$5,759.06 |
$4,500.00 |
$70,000.00 |
$4,000.00 |
$5,000.00 |
| 710 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$25,000.00 |
$21,630.00 |
$18,000.00 |
$10,100.00 |
$20,000.00 |
$20,000.00 |
$20,000.00 |
| 720 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$270,000.00 |
$267,139.62 |
$264,660.69 |
$218,400.00 |
$250,000.00 |
$270,000.00 |
$325,000.00 |