| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$185,459.91 |
$140,000.00 |
$450,000.00 |
$150,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 129,830 | CY |
$9.00 |
$5.70 |
$11.00 |
$6.36 |
$10.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 235,849 | CY |
$8.00 |
$5.70 |
$11.00 |
$8.80 |
$14.00 |
| 40 | 202(E)2600 |
SELECT BORROW | 500 | CY |
$30.00 |
$56.15 |
$10.00 |
$18.96 |
$25.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$125,066.58 |
$36,193.45 |
$73,560.00 |
$241,236.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 17,357 | LF |
$3.00 |
$4.18 |
$3.00 |
$3.20 |
$3.16 |
| 70 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 17 | EA |
$360.00 |
$448.99 |
$400.00 |
$426.00 |
$420.68 |
| 80 | 221(D)2500 |
TEMPORARY SEDIMENT BASIN | 9 | EA |
$4,250.00 |
$1,518.23 |
$1,200.00 |
$2,979.00 |
$6,975.75 |
| 90 | 221(E)2600 |
TEMPORARY SILT DIKE | 5,488 | LF |
$12.00 |
$16.48 |
$15.00 |
$15.62 |
$15.44 |
| 100 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 198 | CY |
$168.00 |
$238.29 |
$85.00 |
$127.85 |
$178.92 |
| 110 | 229 6100 |
DITCH LINER PROTECTION | 9,588 | LF |
$3.00 |
$3.59 |
$3.00 |
$3.18 |
$3.14 |
| 120 | 230(A)7200 |
SOLID SLAB SODDING | 94,252 | SY |
$3.00 |
$3.59 |
$3.00 |
$3.18 |
$3.14 |
| 130 | 232(A)9200 |
SEEDING METHOD A | 31.78 | AC |
$965.00 |
$1,443.60 |
$600.00 |
$1,368.00 |
$1,352.55 |
| 140 | 233(A)0200 |
VEGETATIVE MULCHING | 31.78 | AC |
$1,240.00 |
$1,472.02 |
$600.00 |
$1,395.00 |
$1,379.18 |
| 150 | 241 3100 |
MOWING | 254.24 | AC |
$230.00 |
$337.60 |
$300.00 |
$320.00 |
$316.31 |
| 160 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 2 | EA |
$4,800.00 |
$5,111.87 |
$3,500.00 |
$3,565.00 |
$3,000.00 |
| 170 | 303(A)1200 |
AGGREGATE BASE TYPE A | 14,720 | CY |
$68.00 |
$64.32 |
$60.00 |
$63.05 |
$75.90 |
| 180 | 307(K)4200 |
STABILIZED SUBGRADE | 67,288 | SY |
$9.00 |
$8.15 |
$8.00 |
$6.46 |
$8.90 |
| 190 | 325 0100 |
SEPARATOR FABRIC | 78,854 | SY |
$2.00 |
$1.67 |
$1.25 |
$2.20 |
$2.25 |
| 200 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 8,456 | TON |
$38.00 |
$34.22 |
$32.00 |
$36.45 |
$35.06 |
| 210 | 408 8100 |
PRIME COAT | 15,437 | GAL |
$4.00 |
$0.6100 |
$1.00 |
$5.12 |
$0.2500 |
| 220 | 411(L)2404 |
BMD, TYPE B3 (PG 64-22 OK) | 8,728 | TON |
$125.00 |
$97.47 |
$83.00 |
$99.13 |
$97.98 |
| 230 | 411(L)2408 |
BMD, TYPE B3 (PG 70-28 OK) | 2,245 | TON |
$130.00 |
$106.04 |
$93.00 |
$108.29 |
$107.03 |
| 240 | 411(L)2424 |
BMD, TYPE B4 (PG 64-22 OK) | 533 | TON |
$165.00 |
$127.86 |
$93.00 |
$124.45 |
$123.01 |
| 250 | 411(L)2428 |
BMD, TYPE B4 (PG 70-28 OK) | 894 | TON |
$150.00 |
$136.90 |
$103.00 |
$128.22 |
$126.74 |
| 260 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 13,595 | SY |
$25.00 |
$23.15 |
$18.00 |
$26.95 |
$25.00 |
| 270 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 24,863 | SY |
$31.00 |
$31.20 |
$27.00 |
$34.67 |
$35.00 |
| 280 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 10,147 | CY |
$225.00 |
$240.31 |
$185.00 |
$189.01 |
$224.00 |
| 290 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 75 | CY |
$39.00 |
$47.91 |
$50.00 |
$53.87 |
$49.36 |
| 300 | 504(E)5520 |
42" F-SHAPED PARAPET | 1,309 | LF |
$138.00 |
$155.23 |
$215.00 |
$183.17 |
$146.97 |
| 310 | 509(A)0200 |
CLASS AA CONCRETE | 214 | CY |
$774.00 |
$945.67 |
$800.00 |
$840.44 |
$798.75 |
| 320 | 509(D)0500 |
CLASS C CONCRETE | 894 | CY |
$455.00 |
$472.84 |
$400.00 |
$479.48 |
$399.38 |
| 330 | 511(A)2200 |
REINFORCING STEEL | 27,570 | LB |
$1.60 |
$1.83 |
$2.00 |
$1.62 |
$1.54 |
| 340 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 220 | TON |
$75.00 |
$65.60 |
$75.00 |
$81.68 |
$79.88 |
| 350 | 602(C)2410 |
FILTER FABRIC | 147 | SY |
$7.00 |
$7.47 |
$4.00 |
$1.86 |
$7.46 |
| 360 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 36 | SY |
$120.00 |
$154.82 |
$105.00 |
$138.58 |
$101.18 |
| 370 | 610(C)5410 |
6" CONCRETE DIVIDING STRIP | 997 | SY |
$100.00 |
$67.76 |
$115.00 |
$96.97 |
$93.72 |
| 380 | 611(A)7210 |
MANHOLE (4' DIA.) | 1 | EA |
$4,850.00 |
$4,490.41 |
$10,000.00 |
$5,829.00 |
$7,735.76 |
| 390 | 613(A)5216 |
24" R.C.PIPE CLASS III | 421 | LF |
$116.00 |
$96.19 |
$130.00 |
$107.59 |
$152.50 |
| 400 | 613(A)5220 |
30" R.C.PIPE CLASS III | 125 | LF |
$150.00 |
$152.50 |
$150.00 |
$147.40 |
$199.14 |
| 410 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 203 | LF |
$56.00 |
$59.66 |
$95.00 |
$80.52 |
$54.64 |
| 420 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 221 | LF |
$67.00 |
$69.24 |
$100.00 |
$99.95 |
$35.60 |
| 430 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 152 | LF |
$53.00 |
$67.38 |
$100.00 |
$79.96 |
$74.91 |
| 440 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$580.00 |
$385.60 |
$500.00 |
$1,226.00 |
$762.18 |
| 450 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 3 | EA |
$790.00 |
$407.51 |
$800.00 |
$855.00 |
$784.18 |
| 460 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 5 | EA |
$1,200.00 |
$1,008.19 |
$1,300.00 |
$1,224.00 |
$1,543.44 |
| 470 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,000.00 |
$1,666.20 |
$1,800.00 |
$1,694.00 |
$2,237.35 |
| 480 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$3,152.24 |
$3,000.00 |
$2,780.00 |
$2,662.50 |
| 490 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$2,900.00 |
$3,530.51 |
$3,500.00 |
$2,834.00 |
$2,982.00 |
| 500 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$116,889.10 |
$55,000.00 |
$250,000.00 |
$95,000.00 |
| 510 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 10,676 | SY |
$13.00 |
$8.24 |
$11.00 |
$6.58 |
$20.00 |
| 520 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 16,587 | SY |
$7.00 |
$7.97 |
$6.00 |
$4.17 |
$20.00 |
| 530 | 619(B)6400 |
REMOVAL OF CURB | 200 | LF |
$12.00 |
$2.84 |
$5.00 |
$10.48 |
$10.00 |
| 540 | 619(C)6600 |
SAWING PAVEMENT | 1,970 | LF |
$5.00 |
$2.22 |
$5.00 |
$6.46 |
$6.00 |
| 550 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 87.5 | LF |
$35.00 |
$29.20 |
$30.00 |
$26.12 |
$25.56 |
| 560 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$1,700.00 |
$1,824.55 |
$2,000.00 |
$1,632.00 |
$1,597.50 |
| 570 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 1 | EA |
$4,000.00 |
$4,561.39 |
$4,500.00 |
$4,082.00 |
$3,993.75 |
| 580 | 624(A)3200 |
FENCE-STYLE WWF | 5,659 | LF |
$12.00 |
$10.44 |
$9.00 |
$7.70 |
$7.61 |
| 590 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 6 | EA |
$26.00 |
$60.82 |
$50.00 |
$54.00 |
$53.25 |
| 600 | 871(A)2200 |
IMPACT ATTENUATOR | 6 | EA |
$40,000.00 |
$29,289.67 |
$25,000.00 |
$24,486.00 |
$23,962.50 |
| 610 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 110 | CY |
$28.00 |
$32.33 |
$100.00 |
$49.96 |
$60.00 |
| 620 | 501(G)1800 |
CLSM BACKFILL | 198.2 | CY |
$240.00 |
$250.51 |
$150.00 |
$179.40 |
$275.00 |
| 630 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 701 | LF |
$350.00 |
$369.44 |
$370.00 |
$384.62 |
$375.00 |
| 640 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,076 | LF |
$360.00 |
$364.52 |
$390.00 |
$408.11 |
$425.00 |
| 650 | 504(A)5200 |
APPROACH SLAB | 293.4 | SY |
$250.00 |
$369.32 |
$235.00 |
$143.22 |
$300.00 |
| 660 | 504(B)5300 |
SAW-CUT GROOVING | 1,814.9 | SY |
$6.00 |
$5.84 |
$5.00 |
$5.17 |
$5.11 |
| 670 | 504(E)5520 |
42" F-SHAPED PARAPET | 692 | LF |
$145.00 |
$125.07 |
$175.00 |
$120.99 |
$130.00 |
| 680 | 506(A)7200 |
STRUCTURAL STEEL | 2,030 | LB |
$3.00 |
$7.27 |
$10.00 |
$2.23 |
$3.00 |
| 690 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,600.00 |
$863.45 |
$2,000.00 |
$806.00 |
$1,000.00 |
| 700 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 36 | EA |
$3,000.00 |
$2,755.67 |
$3,700.00 |
$2,348.00 |
$4,000.00 |
| 710 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 36 | EA |
$560.00 |
$1,199.75 |
$500.00 |
$977.00 |
$900.00 |
| 720 | 509 0100 |
SPECIAL CONCRETE FINISH | 2,404 | SY |
$28.00 |
$30.66 |
$28.00 |
$27.15 |
$26.84 |
| 730 | 509(A)0210 |
CLASS AA CONCRETE | 499.9 | CY |
$800.00 |
$1,167.62 |
$980.00 |
$1,158.00 |
$1,000.00 |
| 740 | 509(B)0320 |
CLASS A CONCRETE | 380.4 | CY |
$950.00 |
$856.53 |
$900.00 |
$1,136.00 |
$800.00 |
| 750 | 510(C)1450 |
SLOPE WALL (5") | 827 | SY |
$170.00 |
$164.74 |
$120.00 |
$196.06 |
$135.00 |
| 760 | 511(A)2210 |
REINFORCING STEEL | 4,120 | LB |
$1.60 |
$3.46 |
$1.50 |
$1.21 |
$2.00 |
| 770 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 237,720 | LB |
$1.60 |
$1.69 |
$2.00 |
$1.35 |
$1.80 |
| 780 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 513 | LF |
$50.00 |
$74.48 |
$85.00 |
$56.16 |
$75.00 |
| 790 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 513 | LF |
$20.00 |
$87.63 |
$45.00 |
$221.49 |
$50.00 |
| 800 | 514(G)5800 |
METAL PILE SHOES | 18 | EA |
$200.00 |
$264.32 |
$200.00 |
$143.00 |
$150.00 |
| 810 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 820 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 945 | SY |
$6.50 |
$6.69 |
$6.00 |
$5.93 |
$6.00 |
| 830 | 516(A)8255 |
DRILLED SHAFTS 84" DIAMETER | 328 | LF |
$1,600.00 |
$1,963.75 |
$1,700.00 |
$1,519.01 |
$1,680.00 |
| 840 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$2,900.00 |
$2,311.11 |
$2,500.00 |
$2,047.00 |
$3,500.00 |
| 850 | 517 9110 |
ELASTOMERIC COATING | 1,156 | SF |
$24.00 |
$23.60 |
$20.00 |
$20.90 |
$21.30 |
| 860 | 523(A)3200 |
SEALER CRACK PREPARATION | 440 | LF |
$6.00 |
$4.87 |
$5.00 |
$4.31 |
$4.26 |
| 870 | 523(B)3300 |
SEALER RESIN | 14 | GAL |
$80.00 |
$225.02 |
$200.00 |
$199.00 |
$197.03 |
| 880 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 240 | LF |
$40.00 |
$40.45 |
$10.00 |
$41.30 |
$50.00 |
| 890 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$35.00 |
$79.02 |
$10.00 |
$41.75 |
$50.00 |
| 900 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 35,046 | LF |
$0.4000 |
$0.1800 |
$0.2500 |
$0.1600 |
$0.1600 |
| 910 | 857(B)9300 |
CONSTRUCTION TRAFFIC STR.(PAINT)(ARROWS) | 8 | EA |
$120.00 |
$30.41 |
$30.00 |
$27.00 |
$26.63 |
| 920 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 100 | EA |
$1.50 |
$2.43 |
$3.00 |
$2.20 |
$2.13 |
| 930 | 857(F)9710 |
PAVEMENT MARKING REMOVAL(ARROWS) | 17 | EA |
$57.00 |
$30.41 |
$30.00 |
$27.00 |
$26.63 |
| 940 | 857(F)9740 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 53,928 | LF |
$0.4500 |
$0.3600 |
$0.3500 |
$0.3300 |
$0.3200 |
| 950 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 5,130 | EA |
$5.00 |
$4.26 |
$4.00 |
$3.80 |
$3.73 |
| 960 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 3,150 | EA |
$6.00 |
$4.26 |
$4.00 |
$3.80 |
$3.73 |
| 970 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,200 | SD |
$16.00 |
$6.08 |
$6.00 |
$5.44 |
$6.00 |
| 980 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,750 | LF |
$29.00 |
$28.41 |
$20.00 |
$30.40 |
$45.00 |
| 990 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 6,890 | LF |
$5.00 |
$4.26 |
$4.00 |
$3.53 |
$6.00 |
| 1,000 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 675 | SD |
$3.00 |
$12.17 |
$10.00 |
$10.88 |
$12.00 |
| 1,010 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 24,645 | SD |
$0.2500 |
$0.4300 |
$0.4000 |
$0.3800 |
$0.3700 |
| 1,020 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 13,185 | SD |
$0.8500 |
$1.82 |
$1.55 |
$1.63 |
$1.80 |
| 1,030 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,310 | SD |
$1.50 |
$2.43 |
$2.10 |
$2.18 |
$2.40 |
| 1,040 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 15,405 | SD |
$1.00 |
$0.3600 |
$0.5000 |
$0.3300 |
$0.3600 |
| 1,050 | 880(D)6500 |
VERTICAL PANELS | 84,000 | SD |
$0.2000 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0200 |
| 1,060 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 39,120 | SD |
$0.2500 |
$0.2400 |
$0.2500 |
$0.2200 |
$0.2200 |
| 1,070 | 880(F)6700 |
DRUMS | 106,395 | SD |
$0.2500 |
$0.3600 |
$0.3500 |
$0.3300 |
$0.3600 |
| 1,080 | 880(I)7000 |
FLAGGER | 35 | SD |
$110.00 |
$307.74 |
$200.00 |
$2,063.00 |
$200.00 |
| 1,090 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 840 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 1,100 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 2,038 | SD |
$15.00 |
$18.25 |
$20.00 |
$16.32 |
$17.00 |
| 1,110 | 804(A)2200 |
STRUCTURAL CONCRETE | 21 | CY |
$950.00 |
$364.91 |
$350.00 |
$326.48 |
$319.50 |
| 1,120 | 804(B)2300 |
REINFORCING STEEL | 2,846 | LB |
$3.00 |
$1.82 |
$2.00 |
$1.63 |
$1.60 |
| 1,130 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$400.00 |
$243.27 |
$500.00 |
$217.65 |
$213.00 |
| 1,140 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 346 | SF |
$35.00 |
$24.33 |
$25.00 |
$21.76 |
$21.30 |
| 1,150 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 691 | SF |
$43.00 |
$41.36 |
$35.00 |
$37.00 |
$36.21 |
| 1,160 | 851(A)2200 |
4"@13 GALV.STL.WD.FLANGE BM.POST | 29 | LF |
$46.00 |
$54.73 |
$50.00 |
$48.97 |
$47.93 |
| 1,170 | 851(A)2205 |
6"@15 GALV.STL.WD.FLANGE BM.POST | 429 | LF |
$60.00 |
$60.82 |
$55.00 |
$54.41 |
$53.25 |
| 1,180 | 851(B)2305 |
2"@3.65 GALV.STL.PIPE POST | 114 | LF |
$20.00 |
$18.25 |
$20.00 |
$16.32 |
$15.98 |
| 1,190 | 851(B)2310 |
2 1/2"@5.79 GALV.STL.PIPE POST | 240 | LF |
$35.00 |
$18.25 |
$20.00 |
$16.32 |
$15.98 |
| 1,200 | 851(C)2415 |
2" SQUARE TUBE POST | 128 | LF |
$12.00 |
$18.25 |
$20.00 |
$16.32 |
$15.98 |
| 1,210 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 276 | LF |
$12.00 |
$18.25 |
$20.00 |
$16.32 |
$15.98 |
| 1,220 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 77 | EA |
$71.00 |
$54.73 |
$50.00 |
$49.00 |
$47.93 |
| 1,230 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 57,685 | LF |
$1.00 |
$0.7300 |
$0.6500 |
$0.6500 |
$0.6400 |
| 1,240 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 3,874 | LF |
$3.00 |
$1.46 |
$1.25 |
$1.31 |
$1.28 |
| 1,250 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 51 | LF |
$20.00 |
$6.08 |
$10.00 |
$5.45 |
$5.33 |
| 1,260 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 12 | EA |
$300.00 |
$182.46 |
$200.00 |
$163.20 |
$159.75 |
| 1,270 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 164 | EA |
$5.00 |
$4.26 |
$5.00 |
$3.80 |
$3.73 |
| 1,280 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 89 | EA |
$6.00 |
$4.26 |
$5.00 |
$3.80 |
$3.73 |
| 1,290 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$172,000.00 |
$91,086.38 |
$135,000.00 |
$78,517.00 |
$199,868.36 |
| 1,300 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$6,081.85 |
$14,000.00 |
$10,775.00 |
$30,000.00 |
| 1,310 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$55,577.85 |
$10,000.00 |
$19,395.00 |
$18,000.00 |
| 1,320 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$757,000.00 |
$690,193.71 |
$735,000.00 |
$725,000.00 |
$844,000.00 |