Bid tab 260259

Let Oct 22, 2026 · Division 8 · Rogers, Wagoner

‹ Oct 2026 results

Interchange

Let date
Thursday, October 22, 2026
Contract
260259 · job page
J/P numbers
19983(11)
District
Division 8
County
Rogers, Wagoner
Highway
US-412
Limits
US-412: AT SH-412P, 6.6 MILES WEST OF THE SH-88 INTERCHANGE NEAR FAIR OAKS.
Classification
Interchange ·
Project number
STP-166C(202)PM
Working days
420

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$17,267,540
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $16,433,772 -4.8%
2 BECCO CONTRACTORS, INC. $16,817,000 -2.6% +2.3%
3 Crossland Construction Company, Inc. $16,956,719 -1.8% +3.2%
4 DUIT CONSTRUCTION CO., INC. / OBC, INC. $19,510,845 +13.0% +18.7%

Bid tab: unit prices 132 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 BECCO CONTRACTO…#3 Crossland Const…#4 DUIT CONSTRUCTI…
10201(A)1200 CLEARING AND GRUBBING1LSUM $80,000.00 $185,459.91 $140,000.00 $450,000.00 $150,000.00
20202(A)2200 UNCLASSIFIED EXCAVATION129,830CY $9.00 $5.70 $11.00 $6.36 $10.00
30202(D)2500 UNCLASSIFIED BORROW235,849CY $8.00 $5.70 $11.00 $8.80 $14.00
40202(E)2600 SELECT BORROW500CY $30.00 $56.15 $10.00 $18.96 $25.00
50205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $100,000.00 $125,066.58 $36,193.45 $73,560.00 $241,236.00
60221(B)2300 TEMPORARY SILT FENCE17,357LF $3.00 $4.18 $3.00 $3.20 $3.16
70221(C)2400 TEMPORARY SEDIMENT FILTER17EA $360.00 $448.99 $400.00 $426.00 $420.68
80221(D)2500 TEMPORARY SEDIMENT BASIN9EA $4,250.00 $1,518.23 $1,200.00 $2,979.00 $6,975.75
90221(E)2600 TEMPORARY SILT DIKE5,488LF $12.00 $16.48 $15.00 $15.62 $15.44
100221(F)2720 TEMPORARY ROCK FILTER DAM TYPE 3198CY $168.00 $238.29 $85.00 $127.85 $178.92
110229 6100 DITCH LINER PROTECTION9,588LF $3.00 $3.59 $3.00 $3.18 $3.14
120230(A)7200 SOLID SLAB SODDING94,252SY $3.00 $3.59 $3.00 $3.18 $3.14
130232(A)9200 SEEDING METHOD A31.78AC $965.00 $1,443.60 $600.00 $1,368.00 $1,352.55
140233(A)0200 VEGETATIVE MULCHING31.78AC $1,240.00 $1,472.02 $600.00 $1,395.00 $1,379.18
150241 3100 MOWING254.24AC $230.00 $337.60 $300.00 $320.00 $316.31
160242 4101 STABILIZED CONSTRUCTION EXIT2EA $4,800.00 $5,111.87 $3,500.00 $3,565.00 $3,000.00
170303(A)1200 AGGREGATE BASE TYPE A14,720CY $68.00 $64.32 $60.00 $63.05 $75.90
180307(K)4200 STABILIZED SUBGRADE67,288SY $9.00 $8.15 $8.00 $6.46 $8.90
190325 0100 SEPARATOR FABRIC78,854SY $2.00 $1.67 $1.25 $2.20 $2.25
200402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E8,456TON $38.00 $34.22 $32.00 $36.45 $35.06
210408 8100 PRIME COAT15,437GAL $4.00 $0.6100 $1.00 $5.12 $0.2500
220411(L)2404 BMD, TYPE B3 (PG 64-22 OK)8,728TON $125.00 $97.47 $83.00 $99.13 $97.98
230411(L)2408 BMD, TYPE B3 (PG 70-28 OK)2,245TON $130.00 $106.04 $93.00 $108.29 $107.03
240411(L)2424 BMD, TYPE B4 (PG 64-22 OK)533TON $165.00 $127.86 $93.00 $124.45 $123.01
250411(L)2428 BMD, TYPE B4 (PG 70-28 OK)894TON $150.00 $136.90 $103.00 $128.22 $126.74
260414(A)5200 P.C.CONCRETE PAVEMENT(PLACEMENT)13,595SY $25.00 $23.15 $18.00 $26.95 $25.00
270414(B)5300 DOWEL JOINTED P.C.C.PAVT.(PLACEMENT)24,863SY $31.00 $31.20 $27.00 $34.67 $35.00
280414(G)5800 P.C. CONCRETE FOR PAVEMENT10,147CY $225.00 $240.31 $185.00 $189.01 $224.00
290501(A)1200 STRUCTURAL EXCAVATION UNCLASSIFIED75CY $39.00 $47.91 $50.00 $53.87 $49.36
300504(E)5520 42" F-SHAPED PARAPET1,309LF $138.00 $155.23 $215.00 $183.17 $146.97
310509(A)0200 CLASS AA CONCRETE214CY $774.00 $945.67 $800.00 $840.44 $798.75
320509(D)0500 CLASS C CONCRETE894CY $455.00 $472.84 $400.00 $479.48 $399.38
330511(A)2200 REINFORCING STEEL27,570LB $1.60 $1.83 $2.00 $1.62 $1.54
340601(B)1200 TYPE I PLAIN RIPRAP WITH FILTER BLANKET220TON $75.00 $65.60 $75.00 $81.68 $79.88
350602(C)2410 FILTER FABRIC147SY $7.00 $7.47 $4.00 $1.86 $7.46
360610(B)5310 6" CONCRETE DRIVEWAY36SY $120.00 $154.82 $105.00 $138.58 $101.18
370610(C)5410 6" CONCRETE DIVIDING STRIP997SY $100.00 $67.76 $115.00 $96.97 $93.72
380611(A)7210 MANHOLE (4' DIA.)1EA $4,850.00 $4,490.41 $10,000.00 $5,829.00 $7,735.76
390613(A)5216 24" R.C.PIPE CLASS III421LF $116.00 $96.19 $130.00 $107.59 $152.50
400613(A)5220 30" R.C.PIPE CLASS III125LF $150.00 $152.50 $150.00 $147.40 $199.14
410613(B)5508 18" CORR. GALV. STEEL PIPE203LF $56.00 $59.66 $95.00 $80.52 $54.64
420613(B)5516 24" CORR. GALV. STEEL PIPE221LF $67.00 $69.24 $100.00 $99.95 $35.60
430613(B)5604 21" X 15" CORR. GALV. STEEL PIPE ARCH152LF $53.00 $67.38 $100.00 $79.96 $74.91
440613(L)6608 21" X 15" PREFAB. CULVERT END SEC., ARCH2EA $580.00 $385.60 $500.00 $1,226.00 $762.18
450613(L)6708 18" PREFAB. CULVERT END SEC., ROUND3EA $790.00 $407.51 $800.00 $855.00 $784.18
460613(L)6716 24" PREFAB. CULVERT END SEC., ROUND5EA $1,200.00 $1,008.19 $1,300.00 $1,224.00 $1,543.44
470613(L)6724 30" PREFAB. CULVERT END SEC., ROUND2EA $2,000.00 $1,666.20 $1,800.00 $1,694.00 $2,237.35
480613(M)6964 TYPE B4 CULVERT END TREATMENT2EA $2,500.00 $3,152.24 $3,000.00 $2,780.00 $2,662.50
490613(M)7004 TYPE A6 CULVERT END TREATMENT1EA $2,900.00 $3,530.51 $3,500.00 $2,834.00 $2,982.00
500619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $30,000.00 $116,889.10 $55,000.00 $250,000.00 $95,000.00
510619(B)6360 REMOVAL OF CONCRETE PAVEMENT10,676SY $13.00 $8.24 $11.00 $6.58 $20.00
520619(B)6364 REMOVAL OF ASPHALT PAVEMENT16,587SY $7.00 $7.97 $6.00 $4.17 $20.00
530619(B)6400 REMOVAL OF CURB200LF $12.00 $2.84 $5.00 $10.48 $10.00
540619(C)6600 SAWING PAVEMENT1,970LF $5.00 $2.22 $5.00 $6.46 $6.00
550623(A)1200 BEAM GUARDRAIL W-BEAM SINGLE87.5LF $35.00 $29.20 $30.00 $26.12 $25.56
560623(F)1764 GUARDRAIL TRAIL END TURNDOWN (31")1EA $1,700.00 $1,824.55 $2,000.00 $1,632.00 $1,597.50
570623(G)1820 GUARDRAIL END TREATMENT (31")1EA $4,000.00 $4,561.39 $4,500.00 $4,082.00 $3,993.75
580624(A)3200 FENCE-STYLE WWF5,659LF $12.00 $10.44 $9.00 $7.70 $7.61
590853 5170 GUARDRAIL DELINEATORS(TYPE 1, CODE 1)6EA $26.00 $60.82 $50.00 $54.00 $53.25
600871(A)2200 IMPACT ATTENUATOR6EA $40,000.00 $29,289.67 $25,000.00 $24,486.00 $23,962.50
610501(B)1300 SUBSTRUCTURE EXCAVATION COMMON110CY $28.00 $32.33 $100.00 $49.96 $60.00
620501(G)1800 CLSM BACKFILL198.2CY $240.00 $250.51 $150.00 $179.40 $275.00
630503(A)4230 PRESTRESSED CONCRETE BEAMS (TYPE III)701LF $350.00 $369.44 $370.00 $384.62 $375.00
640503(A)4240 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,076LF $360.00 $364.52 $390.00 $408.11 $425.00
650504(A)5200 APPROACH SLAB293.4SY $250.00 $369.32 $235.00 $143.22 $300.00
660504(B)5300 SAW-CUT GROOVING1,814.9SY $6.00 $5.84 $5.00 $5.17 $5.11
670504(E)5520 42" F-SHAPED PARAPET692LF $145.00 $125.07 $175.00 $120.99 $130.00
680506(A)7200 STRUCTURAL STEEL2,030LB $3.00 $7.27 $10.00 $2.23 $3.00
690507(A)8210 WEATHERING STEEL FIXED BEARING ASSEMBLY12EA $1,600.00 $863.45 $2,000.00 $806.00 $1,000.00
700507(B)8300 STAINLESS STEEL EXP. BEARING ASSEMBLY36EA $3,000.00 $2,755.67 $3,700.00 $2,348.00 $4,000.00
710507(C)8400 ELASTOMERIC BEARING PADS36EA $560.00 $1,199.75 $500.00 $977.00 $900.00
720509 0100 SPECIAL CONCRETE FINISH2,404SY $28.00 $30.66 $28.00 $27.15 $26.84
730509(A)0210 CLASS AA CONCRETE499.9CY $800.00 $1,167.62 $980.00 $1,158.00 $1,000.00
740509(B)0320 CLASS A CONCRETE380.4CY $950.00 $856.53 $900.00 $1,136.00 $800.00
750510(C)1450 SLOPE WALL (5")827SY $170.00 $164.74 $120.00 $196.06 $135.00
760511(A)2210 REINFORCING STEEL4,120LB $1.60 $3.46 $1.50 $1.21 $2.00
770511(B)2310 EPOXY COATED REINFORCING STEEL237,720LB $1.60 $1.69 $2.00 $1.35 $1.80
780514(A)5210 PILES, FURNISHED (HP 10X42)513LF $50.00 $74.48 $85.00 $56.16 $75.00
790514(B)5310 PILES, DRIVEN (HP 10X42)513LF $20.00 $87.63 $45.00 $221.49 $50.00
800514(G)5800 METAL PILE SHOES18EA $200.00 $264.32 $200.00 $143.00 $150.00
810514(L)6300 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $500.00 $500.00 $500.00 $500.00 $500.00
820515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)945SY $6.50 $6.69 $6.00 $5.93 $6.00
830516(A)8255 DRILLED SHAFTS 84" DIAMETER328LF $1,600.00 $1,963.75 $1,700.00 $1,519.01 $1,680.00
840516(C)8400 CROSSHOLE SONIC LOGGING3EA $2,900.00 $2,311.11 $2,500.00 $2,047.00 $3,500.00
850517 9110 ELASTOMERIC COATING1,156SF $24.00 $23.60 $20.00 $20.90 $21.30
860523(A)3200 SEALER CRACK PREPARATION440LF $6.00 $4.87 $5.00 $4.31 $4.26
870523(B)3300 SEALER RESIN14GAL $80.00 $225.02 $200.00 $199.00 $197.03
880613(H)6205 6" PERFORATED PIPE UNDERDRAIN ROUND240LF $40.00 $40.45 $10.00 $41.30 $50.00
890613(I)6310 6" NON-PERF.PIPE UNDERDRAIN RND.80LF $35.00 $79.02 $10.00 $41.75 $50.00
900857(A)9205 CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE)35,046LF $0.4000 $0.1800 $0.2500 $0.1600 $0.1600
910857(B)9300 CONSTRUCTION TRAFFIC STR.(PAINT)(ARROWS)8EA $120.00 $30.41 $30.00 $27.00 $26.63
920857(E)9620 (PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1100EA $1.50 $2.43 $3.00 $2.20 $2.13
930857(F)9710 PAVEMENT MARKING REMOVAL(ARROWS)17EA $57.00 $30.41 $30.00 $27.00 $26.63
940857(F)9740 PAVEMENT MARKING REMOVAL (HYDROBLASTING)53,928LF $0.4500 $0.3600 $0.3500 $0.3300 $0.3200
950858(A)0224 PAVE.MARKERS CLASS A TYPE 2-C5,130EA $5.00 $4.26 $4.00 $3.80 $3.73
960858(A)0228 PAVE.MARKERS CLASS A TYPE 2-D3,150EA $6.00 $4.26 $4.00 $3.80 $3.73
970871(B)2300 CONST.ZONE IMPACT ATTEN.1,200SD $16.00 $6.08 $6.00 $5.44 $6.00
980877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER2,750LF $29.00 $28.41 $20.00 $30.40 $45.00
990877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER6,890LF $5.00 $4.26 $4.00 $3.53 $6.00
1,000880(A)6220 ARROW DISPLAY(TYPE C)675SD $3.00 $12.17 $10.00 $10.88 $12.00
1,010880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF24,645SD $0.2500 $0.4300 $0.4000 $0.3800 $0.3700
1,020880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF13,185SD $0.8500 $1.82 $1.55 $1.63 $1.80
1,030880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF8,310SD $1.50 $2.43 $2.10 $2.18 $2.40
1,040880(C)6410 CONSTRUCTION BARRICADES(TYPE III)15,405SD $1.00 $0.3600 $0.5000 $0.3300 $0.3600
1,050880(D)6500 VERTICAL PANELS84,000SD $0.2000 $0.0200 $0.0500 $0.0200 $0.0200
1,060880(E)6607 WARNING LIGHTS(TYPE B)39,120SD $0.2500 $0.2400 $0.2500 $0.2200 $0.2200
1,070880(F)6700 DRUMS106,395SD $0.2500 $0.3600 $0.3500 $0.3300 $0.3600
1,080880(I)7000 FLAGGER35SD $110.00 $307.74 $200.00 $2,063.00 $200.00
1,090880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)840HOUR $77.00 $77.00 $77.00 $77.00 $77.00
1,100882(A)8210 PORT.CHANGEABLE MESSAGE SIGN2,038SD $15.00 $18.25 $20.00 $16.32 $17.00
1,110804(A)2200 STRUCTURAL CONCRETE21CY $950.00 $364.91 $350.00 $326.48 $319.50
1,120804(B)2300 REINFORCING STEEL2,846LB $3.00 $1.82 $2.00 $1.63 $1.60
1,130805(D)3528 (PL)REMOVE & RESET EXISTING SIGNS2EA $400.00 $243.27 $500.00 $217.65 $213.00
1,140850(A)1200 SHEET ALUMINUM SIGNS346SF $35.00 $24.33 $25.00 $21.76 $21.30
1,150850(B)1310 EXTRUDED ALUMINUM PANEL SIGNS691SF $43.00 $41.36 $35.00 $37.00 $36.21
1,160851(A)2200 4"@13 GALV.STL.WD.FLANGE BM.POST29LF $46.00 $54.73 $50.00 $48.97 $47.93
1,170851(A)2205 6"@15 GALV.STL.WD.FLANGE BM.POST429LF $60.00 $60.82 $55.00 $54.41 $53.25
1,180851(B)2305 2"@3.65 GALV.STL.PIPE POST114LF $20.00 $18.25 $20.00 $16.32 $15.98
1,190851(B)2310 2 1/2"@5.79 GALV.STL.PIPE POST240LF $35.00 $18.25 $20.00 $16.32 $15.98
1,200851(C)2415 2" SQUARE TUBE POST128LF $12.00 $18.25 $20.00 $16.32 $15.98
1,210851(C)2420 2 1/4" SQUARE TUBE POST276LF $12.00 $18.25 $20.00 $16.32 $15.98
1,220853 5130 DELINEATORS(TYPE 1, CODE 1, FLEXIBLE)77EA $71.00 $54.73 $50.00 $49.00 $47.93
1,230856(A)8207 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE)57,685LF $1.00 $0.7300 $0.6500 $0.6500 $0.6400
1,240856(A)8215 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE)3,874LF $3.00 $1.46 $1.25 $1.31 $1.28
1,250856(A)8219 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE)51LF $20.00 $6.08 $10.00 $5.45 $5.33
1,260856(B)8307 (SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS)12EA $300.00 $182.46 $200.00 $163.20 $159.75
1,270858(A)0224 PAVE.MARKERS CLASS A TYPE 2-C164EA $5.00 $4.26 $5.00 $3.80 $3.73
1,280858(A)0228 PAVE.MARKERS CLASS A TYPE 2-D89EA $6.00 $4.26 $5.00 $3.80 $3.73
1,290642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $172,000.00 $91,086.38 $135,000.00 $78,517.00 $199,868.36
1,300220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $6,081.85 $14,000.00 $10,775.00 $30,000.00
1,310640(A)1210 FIELD OFFICE1EA $10,000.00 $55,577.85 $10,000.00 $19,395.00 $18,000.00
1,320641 2110 MOBILIZATION1LSUM $757,000.00 $690,193.71 $735,000.00 $725,000.00 $844,000.00