| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 50 | CY |
$25.00 |
$25.75 |
$83.00 |
$25.00 |
$50.00 |
$25.00 |
$72.09 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 100 | CY |
$29.00 |
$36.05 |
$83.00 |
$52.00 |
$32.00 |
$35.00 |
$76.25 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$7,725.00 |
$39,500.00 |
$10,000.00 |
$5,560.00 |
$10,000.00 |
$4,767.70 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,200 | LF |
$5.00 |
$6.17 |
$6.45 |
$3.00 |
$6.97 |
$7.50 |
$4.66 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 4,000 | SY |
$6.00 |
$5.15 |
$5.50 |
$6.00 |
$5.78 |
$7.00 |
$8.20 |
| 60 | 310(B)5300 |
SUBGRADE, METHOD B | 1,667 | SY |
$4.70 |
$5.15 |
$9.20 |
$8.50 |
$8.00 |
$8.00 |
$12.67 |
| 70 | 408 8100 |
PRIME COAT | 1,239 | GAL |
$10.00 |
$8.47 |
$8.25 |
$1.00 |
$8.31 |
$9.00 |
$8.85 |
| 80 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 93 | TON |
$175.00 |
$276.04 |
$498.50 |
$300.00 |
$366.35 |
$535.00 |
$525.10 |
| 90 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,667 | SY |
$41.00 |
$37.08 |
$36.25 |
$33.00 |
$32.41 |
$35.00 |
$124.87 |
| 100 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 417 | CY |
$250.00 |
$252.79 |
$295.00 |
$315.00 |
$277.75 |
$290.00 |
$362.27 |
| 110 | 619(B)6352 |
REMOVAL OF FENCE | 225 | LF |
$1.80 |
$5.15 |
$16.20 |
$5.50 |
$4.00 |
$5.00 |
$10.53 |
| 120 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 1,948 | SY |
$15.00 |
$16.48 |
$19.00 |
$20.75 |
$15.57 |
$10.00 |
$29.55 |
| 130 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 530 | LF |
$6.80 |
$8.64 |
$9.05 |
$9.25 |
$7.00 |
$10.00 |
$9.90 |
| 140 | 619(B)6436 |
REMOVAL OF CONCRETE DITCH LINER | 181 | LF |
$7.00 |
$15.45 |
$20.50 |
$24.00 |
$21.00 |
$20.00 |
$25.97 |
| 150 | 619(C)6600 |
SAWING PAVEMENT | 2,000 | LF |
$5.30 |
$5.15 |
$4.55 |
$6.65 |
$5.97 |
$11.00 |
$4.27 |
| 160 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 475 | LF |
$30.00 |
$28.71 |
$30.10 |
$30.67 |
$31.00 |
$34.00 |
$32.90 |
| 170 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$4,000.00 |
$4,017.00 |
$4,225.00 |
$4,290.00 |
$4,600.00 |
$4,700.00 |
$4,602.00 |
| 180 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 2 | EA |
$3,500.00 |
$3,914.00 |
$4,115.00 |
$4,180.00 |
$4,700.00 |
$4,600.00 |
$4,484.00 |
| 190 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 230 | LF |
$8.50 |
$23.17 |
$24.50 |
$27.50 |
$29.00 |
$13.00 |
$26.55 |
| 200 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 13 | EA |
$25.00 |
$12.35 |
$13.00 |
$13.25 |
$14.00 |
$15.00 |
$14.15 |
| 210 | 501(G)1800 |
CLSM BACKFILL | 222 | CY |
$225.00 |
$316.47 |
$245.00 |
$301.00 |
$277.98 |
$350.00 |
$411.80 |
| 220 | 504(A)5200 |
APPROACH SLAB | 731.2 | SY |
$320.00 |
$303.52 |
$294.50 |
$315.75 |
$347.80 |
$350.00 |
$276.85 |
| 230 | 504(B)5300 |
SAW-CUT GROOVING | 1,637.3 | SY |
$5.50 |
$4.94 |
$5.20 |
$5.30 |
$5.97 |
$6.50 |
$5.66 |
| 240 | 504(E)5520 |
42" F-SHAPED PARAPET | 355 | LF |
$125.00 |
$132.53 |
$202.50 |
$147.25 |
$241.82 |
$130.00 |
$184.17 |
| 250 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 348,460 | LB |
$2.75 |
$2.83 |
$2.80 |
$3.07 |
$3.11 |
$4.00 |
$2.87 |
| 260 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$2,000.00 |
$1,758.64 |
$2,675.00 |
$1,640.00 |
$2,013.00 |
$1,700.00 |
$2,805.11 |
| 270 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 12 | EA |
$2,000.00 |
$1,758.64 |
$2,675.00 |
$1,640.00 |
$2,013.00 |
$1,700.00 |
$2,805.11 |
| 280 | 509(A)0210 |
CLASS AA CONCRETE | 222.7 | CY |
$880.00 |
$998.66 |
$1,375.00 |
$1,225.00 |
$1,217.89 |
$1,150.00 |
$1,399.80 |
| 290 | 509(D)0510 |
CLASS C CONCRETE | 10 | CY |
$850.00 |
$811.71 |
$1,100.00 |
$875.00 |
$545.00 |
$700.00 |
$1,792.76 |
| 300 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 51,990 | LB |
$1.70 |
$1.95 |
$1.75 |
$1.78 |
$1.88 |
$2.00 |
$2.09 |
| 310 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 15 | SY |
$400.00 |
$638.60 |
$469.50 |
$650.00 |
$635.00 |
$350.00 |
$513.30 |
| 320 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 5 | SY |
$700.00 |
$1,030.00 |
$755.50 |
$930.00 |
$840.00 |
$650.00 |
$826.00 |
| 330 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,076 | SY |
$5.50 |
$5.15 |
$5.50 |
$5.50 |
$6.80 |
$6.00 |
$5.90 |
| 340 | 517 9110 |
ELASTOMERIC COATING | 666 | SF |
$25.00 |
$32.96 |
$21.65 |
$22.00 |
$26.00 |
$30.00 |
$23.60 |
| 350 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 85 | LF |
$150.00 |
$206.00 |
$125.00 |
$250.00 |
$161.00 |
$150.00 |
$135.70 |
| 360 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 79 | LF |
$35.00 |
$41.20 |
$43.25 |
$44.00 |
$52.00 |
$35.00 |
$47.20 |
| 370 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 6.4 | GAL |
$125.00 |
$82.40 |
$135.00 |
$88.00 |
$120.00 |
$230.00 |
$147.50 |
| 380 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 5.2 | SY |
$825.00 |
$1,030.00 |
$1,085.00 |
$1,100.00 |
$1,350.00 |
$1,000.00 |
$1,180.00 |
| 390 | 523(A)3200 |
SEALER CRACK PREPARATION | 188 | LF |
$4.50 |
$4.12 |
$4.30 |
$4.00 |
$6.00 |
$6.00 |
$4.72 |
| 400 | 523(B)3300 |
SEALER RESIN | 2.2 | GAL |
$70.00 |
$190.55 |
$199.50 |
$185.00 |
$245.00 |
$125.00 |
$218.30 |
| 410 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 8.2 | SY |
$60.00 |
$53.56 |
$43.50 |
$44.00 |
$64.00 |
$60.00 |
$47.20 |
| 420 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$97,595.07 |
$145,850.00 |
$195,000.00 |
$133,500.00 |
$40,000.00 |
$309,272.41 |
| 430 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 2,427 | LF |
$28.00 |
$19.05 |
$20.00 |
$20.35 |
$24.08 |
$22.00 |
$21.83 |
| 440 | 628(B)7300 |
HIGH-TENSION CABLE BARRIER(TL-4) | 2,370 | LF |
$39.00 |
$20.08 |
$21.25 |
$21.45 |
$25.39 |
$50.00 |
$23.01 |
| 450 | 628(C)7400 |
END ANCHORS | 4 | EA |
$7,100.00 |
$6,180.00 |
$6,500.00 |
$6,600.00 |
$7,100.00 |
$12,000.00 |
$7,080.00 |
| 460 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$350.00 |
$1,133.00 |
$1,200.00 |
$1,210.00 |
$1,270.00 |
$1,350.00 |
$1,298.00 |
| 470 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 25,200 | LF |
$1.30 |
$0.6700 |
$0.7500 |
$0.7500 |
$0.7100 |
$0.8000 |
$0.7700 |
| 480 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 25,200 | LF |
$0.5000 |
$0.3100 |
$0.3500 |
$0.3500 |
$0.3400 |
$0.4000 |
$0.3700 |
| 490 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 31,420 | LF |
$1.40 |
$1.68 |
$1.75 |
$1.80 |
$1.80 |
$2.00 |
$1.94 |
| 500 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 469 | EA |
$11.00 |
$6.69 |
$7.00 |
$7.15 |
$7.05 |
$8.00 |
$7.67 |
| 510 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 1,039 | EA |
$8.50 |
$6.69 |
$7.00 |
$7.15 |
$7.08 |
$8.00 |
$7.67 |
| 520 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 40 | SD |
$18.00 |
$46.35 |
$48.75 |
$49.50 |
$49.00 |
$45.00 |
$53.10 |
| 530 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,900 | LF |
$29.00 |
$16.89 |
$19.50 |
$25.50 |
$18.00 |
$20.00 |
$19.35 |
| 540 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,000 | LF |
$5.00 |
$2.62 |
$2.75 |
$4.50 |
$2.79 |
$3.25 |
$3.01 |
| 550 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,850 | SD |
$0.3000 |
$2.06 |
$2.15 |
$6.00 |
$2.19 |
$2.00 |
$2.36 |
| 560 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,390 | SD |
$0.6000 |
$0.3000 |
$0.3500 |
$0.3300 |
$0.3400 |
$0.3000 |
$0.3500 |
| 570 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,010 | SD |
$1.00 |
$0.2000 |
$0.2500 |
$0.2200 |
$0.2300 |
$0.2000 |
$0.2400 |
| 580 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 940 | SD |
$1.00 |
$0.5100 |
$0.5500 |
$0.5500 |
$0.5400 |
$0.5000 |
$0.5900 |
| 600 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 3,700 | SD |
$0.8000 |
$0.1400 |
$4.85 |
$9.00 |
$4.95 |
$4.50 |
$5.31 |
| 605 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 14,880 | SD |
$0.1000 |
$4.63 |
$0.1500 |
$0.1600 |
$0.1900 |
$0.1400 |
$0.1700 |
| 610 | 880(F)6700 |
DRUMS | 16,730 | SD |
$0.2000 |
$0.0200 |
$0.1000 |
$0.0300 |
$0.0400 |
$0.0200 |
$0.0200 |
| 620 | 880(G)6810 |
TUBE CHANNELIZERS | 326 | EA |
$21.00 |
$64.81 |
$75.00 |
$75.55 |
$69.00 |
$75.00 |
$74.26 |
| 630 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 740 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 640 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 398 | SD |
$16.00 |
$6.18 |
$6.85 |
$6.60 |
$6.72 |
$6.00 |
$7.08 |
| 650 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$6,180.00 |
$25,000.00 |
$19,000.00 |
$9,700.00 |
$16,000.00 |
$7,080.00 |
| 660 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$155,974.98 |
$173,903.90 |
$174,959.44 |
$149,500.00 |
$166,200.00 |
$242,000.00 |
$263,730.00 |