| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,500.00 |
$20,300.00 |
$12,500.00 |
$20,000.00 |
$7,800.65 |
$10,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 716 | CY |
$14.50 |
$12.07 |
$15.00 |
$15.00 |
$17.27 |
$18.50 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 4,009 | CY |
$15.00 |
$13.25 |
$11.80 |
$15.00 |
$18.08 |
$18.50 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$11,750.00 |
$10,800.00 |
$10,000.00 |
$18,021.29 |
$15,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,150 | LF |
$4.50 |
$3.30 |
$4.75 |
$4.50 |
$4.35 |
$4.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 728 | LF |
$17.00 |
$6.00 |
$31.50 |
$30.00 |
$30.25 |
$15.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 7,986 | SY |
$4.25 |
$3.60 |
$3.40 |
$3.30 |
$3.29 |
$4.25 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 1.65 | AC |
$810.00 |
$200.00 |
$4,770.00 |
$5,000.00 |
$5,225.00 |
$1,100.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 497 | CY |
$130.00 |
$145.00 |
$102.00 |
$155.00 |
$156.49 |
$95.00 |
| 100 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$450.00 |
$312.50 |
$195.00 |
$500.00 |
$636.24 |
$535.00 |
| 110 | 613(A)5208 |
18" R.C.PIPE CLASS III | 34 | LF |
$116.00 |
$130.50 |
$105.00 |
$150.00 |
$96.99 |
$112.00 |
| 120 | 613(A)5374 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 96 | LF |
$380.00 |
$337.00 |
$335.50 |
$400.00 |
$384.56 |
$365.00 |
| 130 | 613(L)6656 |
51" X 31" PREFAB. CULVERT END SEC., ARCH | 6 | EA |
$5,500.00 |
$5,000.00 |
$7,500.00 |
$6,000.00 |
$5,183.58 |
$5,665.00 |
| 140 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$850.00 |
$1,455.00 |
$620.00 |
$1,500.00 |
$1,364.67 |
$920.00 |
| 150 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$6,000.00 |
$9,150.00 |
$5,400.00 |
$10,000.00 |
$9,010.65 |
$10,000.00 |
| 160 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 25 | LF |
$30.25 |
$27.50 |
$27.20 |
$94.00 |
$55.00 |
$28.75 |
| 170 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 2 | EA |
$2,800.00 |
$3,190.00 |
$4,300.00 |
$4,000.00 |
$3,080.00 |
$3,400.00 |
| 180 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,910.00 |
$2,640.00 |
$3,430.00 |
$3,050.00 |
$3,135.00 |
$3,000.00 |
| 190 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 395 | LF |
$18.50 |
$22.00 |
$14.50 |
$22.00 |
$22.00 |
$20.00 |
| 200 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$17.50 |
$18.25 |
$32.00 |
$30.00 |
$32.77 |
$25.00 |
| 210 | 501(G)1800 |
CLSM BACKFILL | 70 | CY |
$290.00 |
$297.00 |
$320.65 |
$285.00 |
$223.06 |
$330.00 |
| 220 | 503(A)4200 |
PRESTRESSED CONCRETE BEAMS | 378.63 | LF |
$505.00 |
$536.00 |
$585.35 |
$525.00 |
$539.40 |
$530.00 |
| 230 | 504(D)5410 |
CONCRETE RAIL (TR3) | 129.6 | LF |
$115.50 |
$118.00 |
$131.66 |
$125.00 |
$129.51 |
$142.00 |
| 240 | 506(A)7200 |
STRUCTURAL STEEL | 965 | LB |
$4.50 |
$6.35 |
$10.80 |
$60.00 |
$7.78 |
$4.20 |
| 250 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 12 | EA |
$325.00 |
$300.00 |
$394.00 |
$1,000.00 |
$336.52 |
$610.00 |
| 260 | 509(A)0210 |
CLASS AA CONCRETE | 34.3 | CY |
$1,225.00 |
$1,097.00 |
$1,112.80 |
$1,500.00 |
$2,076.59 |
$1,455.00 |
| 270 | 509(B)0320 |
CLASS A CONCRETE | 44.2 | CY |
$1,050.00 |
$1,144.00 |
$1,143.62 |
$1,500.00 |
$1,333.14 |
$1,360.00 |
| 280 | 511(A)2210 |
REINFORCING STEEL | 12,570 | LB |
$1.35 |
$1.75 |
$2.01 |
$2.00 |
$2.09 |
$1.48 |
| 290 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 1,096 | LF |
$58.00 |
$68.00 |
$62.41 |
$65.00 |
$78.47 |
$78.00 |
| 300 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 1,096 | LF |
$17.75 |
$17.00 |
$30.00 |
$20.00 |
$13.08 |
$38.00 |
| 310 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 320 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 535 | TON |
$78.00 |
$95.68 |
$71.19 |
$100.00 |
$97.98 |
$110.00 |
| 330 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$12,475.00 |
$12,000.00 |
$25,000.00 |
$73,918.30 |
$22,000.00 |
| 340 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 10.36 | SF |
$46.00 |
$50.00 |
$54.00 |
$53.00 |
$154.00 |
$57.25 |
| 350 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,800 | SD |
$0.2000 |
$0.0200 |
$0.0400 |
$0.0400 |
$0.0200 |
$0.0500 |
| 360 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 480 | SD |
$1.00 |
$0.0200 |
$0.0400 |
$0.0400 |
$0.0200 |
$0.0500 |
| 370 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,840 | SD |
$0.2000 |
$0.0500 |
$0.0700 |
$0.0700 |
$0.00 |
$0.1000 |
| 380 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 9,600 | SD |
$0.2000 |
$0.0200 |
$0.0400 |
$0.0400 |
$0.0200 |
$0.0500 |
| 390 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,400.00 |
$9,000.00 |
$8,900.00 |
$8,500.00 |
$8,250.00 |
$35,000.00 |
| 400 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$3,400.00 |
$3,250.00 |
$3,500.00 |
$2,750.00 |
$3,500.00 |
| 410 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$67,000.00 |
$55,000.00 |
$45,000.00 |
$63,264.04 |
$172,000.00 |