| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,672 | CY |
$20.00 |
$17.02 |
$11.95 |
$13.50 |
$14.00 |
$17.49 |
$30.00 |
$18.00 |
$49.03 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,659 | CY |
$25.00 |
$0.2500 |
$1.05 |
$16.80 |
$25.00 |
$31.15 |
$30.00 |
$35.00 |
$117.92 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$22,333.67 |
$10,274.25 |
$16,800.00 |
$5,000.00 |
$12,600.00 |
$25,000.00 |
$25,000.00 |
$21,834.99 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 650 | LF |
$3.00 |
$4.10 |
$3.10 |
$3.30 |
$4.00 |
$2.95 |
$3.00 |
$3.10 |
$3.25 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 28 | LF |
$20.00 |
$17.13 |
$26.20 |
$28.00 |
$25.00 |
$24.95 |
$30.00 |
$26.25 |
$27.45 |
| 60 | 221(G)2800 |
TEMPORARY FIBER LOG | 14 | LF |
$6.00 |
$19.98 |
$9.40 |
$10.10 |
$10.00 |
$8.95 |
$10.00 |
$9.50 |
$9.85 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 6,623 | SY |
$5.00 |
$8.42 |
$7.30 |
$7.78 |
$5.00 |
$8.40 |
$7.00 |
$7.50 |
$7.65 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 1.37 | AC |
$1,500.00 |
$1,084.87 |
$939.75 |
$1,002.00 |
$2,200.00 |
$450.00 |
$900.00 |
$940.00 |
$984.50 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,382 | CY |
$65.00 |
$59.92 |
$144.41 |
$78.50 |
$60.00 |
$75.00 |
$70.00 |
$75.00 |
$114.64 |
| 100 | 325 0100 |
SEPARATOR FABRIC | 7,744 | SY |
$2.00 |
$1.74 |
$1.74 |
$2.10 |
$2.50 |
$3.52 |
$1.00 |
$3.25 |
$2.09 |
| 110 | 407(B)7300 |
TACK COAT | 1,147 | GAL |
$5.00 |
$5.04 |
$2.10 |
$2.25 |
$3.00 |
$3.25 |
$3.00 |
$2.15 |
$2.75 |
| 120 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,388 | TON |
$100.00 |
$94.14 |
$99.75 |
$106.40 |
$110.00 |
$131.20 |
$90.00 |
$100.00 |
$125.17 |
| 130 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 869 | TON |
$110.00 |
$123.68 |
$123.90 |
$132.16 |
$135.00 |
$150.00 |
$120.00 |
$121.00 |
$162.60 |
| 140 | 412 3100 |
COLD MILLING PAVEMENT | 1,556 | SY |
$8.00 |
$2.94 |
$8.40 |
$10.00 |
$11.00 |
$16.78 |
$5.00 |
$8.50 |
$9.90 |
| 150 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 480 | SY |
$50.00 |
$86.62 |
$32.70 |
$49.21 |
$100.00 |
$86.15 |
$75.00 |
$50.00 |
$161.57 |
| 160 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 107 | CY |
$250.00 |
$231.53 |
$471.96 |
$305.81 |
$250.00 |
$267.50 |
$220.00 |
$275.03 |
$220.00 |
| 170 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$500.00 |
$1,081.70 |
$362.92 |
$850.00 |
$800.00 |
$332.50 |
$600.00 |
$895.00 |
$1,310.10 |
| 180 | 613(EE)5969 |
18" CORRUGATED POLYPROPYLENE PIPE | 1,600 | LF |
$75.00 |
$51.98 |
$69.50 |
$50.75 |
$100.00 |
$61.00 |
$80.00 |
$55.00 |
$78.77 |
| 190 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$22,424.57 |
$5,197.50 |
$9,000.00 |
$5,000.00 |
$6,125.00 |
$7,490.50 |
$3,500.00 |
$17,467.99 |
| 200 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 480 | SY |
$10.00 |
$11.32 |
$20.21 |
$21.52 |
$10.00 |
$29.75 |
$10.00 |
$20.00 |
$31.84 |
| 210 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 5,428 | SY |
$8.00 |
$7.38 |
$4.20 |
$6.00 |
$8.00 |
$11.50 |
$10.00 |
$15.00 |
$23.13 |
| 220 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 180 | LF |
$10.00 |
$8.78 |
$7.60 |
$8.50 |
$8.00 |
$7.24 |
$10.00 |
$20.00 |
$7.96 |
| 230 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 1,600 | LF |
$5.00 |
$6.75 |
$3.72 |
$3.00 |
$5.00 |
$6.63 |
$3.00 |
$3.00 |
$32.75 |
| 240 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$40.00 |
$25.45 |
$22.05 |
$23.52 |
$25.00 |
$23.10 |
$25.00 |
$25.25 |
$23.10 |
| 250 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,400.00 |
$2,909.13 |
$2,520.00 |
$2,688.00 |
$3,000.00 |
$2,640.00 |
$2,470.00 |
$1,050.00 |
$2,640.00 |
| 260 | 501(G)1800 |
CLSM BACKFILL | 64 | CY |
$300.00 |
$314.34 |
$210.47 |
$305.76 |
$300.00 |
$241.00 |
$180.00 |
$325.00 |
$391.70 |
| 270 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$35,000.00 |
$13,079.74 |
$67,446.15 |
$5,500.00 |
$35,000.00 |
$23,250.00 |
$12,000.00 |
$25,000.00 |
$87,339.98 |
| 280 | 504(A)5200 |
APPROACH SLAB | 209.4 | SY |
$350.00 |
$314.01 |
$272.58 |
$309.13 |
$325.00 |
$331.00 |
$280.00 |
$450.00 |
$212.44 |
| 290 | 504(B)5300 |
SAW-CUT GROOVING | 759.7 | SY |
$7.00 |
$6.30 |
$5.46 |
$5.85 |
$10.00 |
$5.20 |
$6.00 |
$5.50 |
$5.72 |
| 300 | 504(E)5520 |
42" F-SHAPED PARAPET | 335.6 | LF |
$130.00 |
$122.99 |
$117.05 |
$177.90 |
$125.00 |
$135.30 |
$155.00 |
$150.00 |
$158.32 |
| 310 | 506(A)7200 |
STRUCTURAL STEEL | 8,000 | LB |
$4.00 |
$7.44 |
$12.86 |
$7.37 |
$7.00 |
$6.67 |
$5.00 |
$7.75 |
$17.08 |
| 320 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$3,500.00 |
$1,720.62 |
$1,600.34 |
$2,300.00 |
$2,000.00 |
$2,180.00 |
$3,000.00 |
$2,750.00 |
$10,054.00 |
| 330 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 15 | EA |
$3,500.00 |
$1,399.34 |
$1,053.16 |
$2,300.00 |
$2,000.00 |
$2,180.00 |
$3,500.00 |
$2,500.00 |
$3,901.33 |
| 340 | 509(A)0210 |
CLASS AA CONCRETE | 136.7 | CY |
$800.00 |
$1,182.02 |
$968.33 |
$1,187.89 |
$1,200.00 |
$1,197.50 |
$1,500.00 |
$1,750.00 |
$2,591.67 |
| 350 | 509(B)0320 |
CLASS A CONCRETE | 35.6 | CY |
$1,200.00 |
$1,947.91 |
$2,037.07 |
$2,451.69 |
$1,200.00 |
$1,800.00 |
$1,900.00 |
$2,500.00 |
$4,810.18 |
| 360 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 54,090 | LB |
$2.00 |
$1.65 |
$1.49 |
$2.20 |
$2.00 |
$1.71 |
$3.00 |
$2.10 |
$2.34 |
| 370 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$70,000.00 |
$191,600.67 |
$165,971.63 |
$179,692.00 |
$160,000.00 |
$174,000.00 |
$160,000.00 |
$175,000.00 |
$343,200.00 |
| 380 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$7,000.00 |
$12,495.28 |
$10,823.87 |
$11,718.64 |
$80,000.00 |
$11,500.00 |
$10,000.00 |
$11,000.00 |
$16,500.00 |
| 390 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 364 | SY |
$6.50 |
$7.27 |
$6.30 |
$5.00 |
$6.00 |
$6.00 |
$7.00 |
$6.50 |
$6.60 |
| 400 | 517 9110 |
ELASTOMERIC COATING | 792 | SF |
$25.00 |
$21.21 |
$18.38 |
$20.00 |
$28.00 |
$19.25 |
$18.00 |
$20.00 |
$22.22 |
| 410 | 518(B)0300 |
SEALED EXPANSION JOINTS | 84 | LF |
$400.00 |
$270.45 |
$257.52 |
$307.27 |
$400.00 |
$350.00 |
$300.00 |
$300.00 |
$398.25 |
| 420 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 10 | LF |
$40.00 |
$50.91 |
$44.10 |
$47.00 |
$35.00 |
$46.20 |
$45.00 |
$50.00 |
$46.20 |
| 430 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.8 | GAL |
$150.00 |
$151.52 |
$131.25 |
$140.00 |
$225.00 |
$137.50 |
$125.00 |
$145.00 |
$137.50 |
| 440 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$1,200.00 |
$969.71 |
$840.00 |
$1,000.00 |
$800.00 |
$1,500.00 |
$1,000.00 |
$915.00 |
$880.00 |
| 450 | 523(A)3200 |
SEALER CRACK PREPARATION | 176 | LF |
$8.00 |
$7.27 |
$6.30 |
$2.75 |
$5.00 |
$6.00 |
$7.00 |
$6.50 |
$6.60 |
| 460 | 523(B)3300 |
SEALER RESIN | 2 | GAL |
$200.00 |
$266.67 |
$231.00 |
$35.00 |
$125.00 |
$220.00 |
$220.00 |
$230.00 |
$242.00 |
| 470 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 3 | SY |
$65.00 |
$50.91 |
$44.10 |
$47.00 |
$60.00 |
$46.20 |
$50.00 |
$50.00 |
$46.20 |
| 480 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$80,000.00 |
$86,829.76 |
$80,417.07 |
$66,307.47 |
$10,000.00 |
$115,000.00 |
$195,000.00 |
$75,500.00 |
$43,669.99 |
| 490 | 501(G)1800 |
CLSM BACKFILL | 64 | CY |
$300.00 |
$314.34 |
$221.09 |
$305.76 |
$300.00 |
$241.00 |
$180.00 |
$315.00 |
$391.70 |
| 500 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$35,000.00 |
$13,079.74 |
$67,446.15 |
$5,500.00 |
$35,000.00 |
$23,250.00 |
$12,000.00 |
$25,000.00 |
$43,669.99 |
| 510 | 504(A)5200 |
APPROACH SLAB | 209.4 | SY |
$350.00 |
$314.01 |
$284.93 |
$309.13 |
$325.00 |
$331.00 |
$280.00 |
$450.00 |
$212.32 |
| 520 | 504(B)5300 |
SAW-CUT GROOVING | 759.7 | SY |
$7.00 |
$6.30 |
$5.46 |
$5.85 |
$10.00 |
$5.20 |
$6.00 |
$5.50 |
$5.72 |
| 530 | 504(E)5520 |
42" F-SHAPED PARAPET | 335.6 | LF |
$130.00 |
$122.99 |
$133.41 |
$177.90 |
$125.00 |
$135.30 |
$155.00 |
$150.00 |
$107.79 |
| 540 | 506(A)7200 |
STRUCTURAL STEEL | 8,000 | LB |
$4.00 |
$7.44 |
$12.86 |
$7.37 |
$7.00 |
$6.67 |
$5.00 |
$7.75 |
$16.45 |
| 550 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$3,500.00 |
$1,720.62 |
$2,149.92 |
$2,300.00 |
$2,000.00 |
$2,180.00 |
$3,000.00 |
$2,750.00 |
$10,054.00 |
| 560 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 15 | EA |
$3,500.00 |
$1,399.34 |
$1,230.84 |
$2,300.00 |
$2,000.00 |
$2,180.00 |
$3,500.00 |
$2,500.00 |
$3,901.33 |
| 570 | 509(A)0210 |
CLASS AA CONCRETE | 136.7 | CY |
$800.00 |
$1,182.02 |
$1,014.69 |
$1,187.89 |
$1,200.00 |
$1,197.50 |
$1,500.00 |
$1,700.00 |
$2,027.38 |
| 580 | 509(B)0320 |
CLASS A CONCRETE | 35.6 | CY |
$1,200.00 |
$1,947.91 |
$2,037.07 |
$2,451.69 |
$1,200.00 |
$1,800.00 |
$1,900.00 |
$2,500.00 |
$4,299.40 |
| 590 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 54,090 | LB |
$2.00 |
$1.65 |
$1.49 |
$2.20 |
$2.00 |
$1.71 |
$3.00 |
$2.10 |
$2.52 |
| 600 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$70,000.00 |
$191,600.67 |
$165,971.63 |
$179,692.00 |
$160,000.00 |
$174,000.00 |
$160,000.00 |
$175,000.00 |
$343,200.00 |
| 610 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$7,000.00 |
$12,495.28 |
$10,823.87 |
$11,720.00 |
$80,000.00 |
$11,500.00 |
$10,000.00 |
$11,000.00 |
$16,500.00 |
| 620 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$350.00 |
$460.61 |
$399.00 |
$600.00 |
$350.00 |
$418.00 |
$400.00 |
$500.00 |
$418.00 |
| 630 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 10 | SY |
$650.00 |
$890.92 |
$771.75 |
$600.00 |
$650.00 |
$808.00 |
$500.00 |
$1,000.00 |
$808.50 |
| 640 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 364 | SY |
$6.50 |
$7.27 |
$6.30 |
$5.00 |
$5.00 |
$6.00 |
$7.00 |
$6.50 |
$6.60 |
| 650 | 517 9110 |
ELASTOMERIC COATING | 792 | SF |
$25.00 |
$21.21 |
$18.38 |
$20.00 |
$28.00 |
$19.25 |
$18.00 |
$20.00 |
$22.22 |
| 660 | 518(B)0300 |
SEALED EXPANSION JOINTS | 84 | LF |
$400.00 |
$270.45 |
$257.52 |
$307.24 |
$400.00 |
$350.00 |
$300.00 |
$300.00 |
$398.25 |
| 670 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 10 | LF |
$40.00 |
$50.91 |
$44.10 |
$47.00 |
$35.00 |
$46.20 |
$45.00 |
$50.00 |
$46.20 |
| 680 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.8 | GAL |
$150.00 |
$151.52 |
$131.25 |
$140.00 |
$225.00 |
$137.50 |
$125.00 |
$145.00 |
$137.50 |
| 690 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$1,200.00 |
$969.71 |
$840.00 |
$1,000.00 |
$800.00 |
$1,500.00 |
$1,000.00 |
$915.00 |
$880.00 |
| 700 | 523(A)3200 |
SEALER CRACK PREPARATION | 176 | LF |
$8.00 |
$7.27 |
$6.30 |
$2.75 |
$5.00 |
$6.00 |
$7.00 |
$6.50 |
$6.60 |
| 710 | 523(B)3300 |
SEALER RESIN | 2 | GAL |
$200.00 |
$266.67 |
$231.00 |
$35.00 |
$125.00 |
$220.00 |
$220.00 |
$230.00 |
$242.00 |
| 720 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 3 | SY |
$65.00 |
$50.91 |
$44.10 |
$47.00 |
$60.00 |
$46.20 |
$50.00 |
$50.00 |
$46.20 |
| 730 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$80,000.00 |
$72,085.36 |
$80,417.07 |
$66,307.47 |
$10,000.00 |
$115,000.00 |
$195,000.00 |
$75,500.00 |
$43,669.99 |
| 740 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 1,648 | LF |
$0.6000 |
$2.36 |
$2.05 |
$2.18 |
$2.20 |
$2.00 |
$2.00 |
$1.10 |
$2.15 |
| 750 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 46,017 | LF |
$2.00 |
$2.06 |
$1.79 |
$1.90 |
$2.00 |
$1.87 |
$1.75 |
$0.2500 |
$1.87 |
| 760 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 360 | SD |
$14.00 |
$21.82 |
$18.90 |
$20.16 |
$18.00 |
$19.80 |
$20.00 |
$15.75 |
$19.80 |
| 770 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 5,233 | LF |
$30.00 |
$14.54 |
$12.60 |
$13.44 |
$15.00 |
$16.00 |
$15.00 |
$12.00 |
$16.76 |
| 780 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 12,673 | LF |
$5.00 |
$2.12 |
$1.84 |
$1.96 |
$3.00 |
$2.00 |
$2.00 |
$2.50 |
$1.93 |
| 790 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,880 | SD |
$0.7000 |
$0.3600 |
$0.3200 |
$0.3400 |
$0.3000 |
$0.3000 |
$0.3500 |
$2.15 |
$0.3300 |
| 800 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 540 | SD |
$1.50 |
$8.48 |
$7.35 |
$7.84 |
$7.00 |
$12.00 |
$8.00 |
$5.25 |
$7.70 |
| 810 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,780 | SD |
$1.50 |
$0.3600 |
$0.3200 |
$0.3400 |
$0.3000 |
$0.3000 |
$0.3500 |
$5.25 |
$0.3300 |
| 820 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 540 | SD |
$2.00 |
$18.18 |
$15.75 |
$16.80 |
$15.00 |
$25.00 |
$15.00 |
$5.25 |
$7.70 |
| 830 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,600 | SD |
$0.5000 |
$1.82 |
$1.58 |
$1.68 |
$1.50 |
$1.50 |
$1.50 |
$1.10 |
$1.65 |
| 840 | 880(F)6700 |
DRUMS | 10,260 | SD |
$0.4000 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1000 |
$1.00 |
$0.1100 |
| 850 | 880(G)6805 |
CHANNELIZER CONES | 36,180 | SD |
$0.5000 |
$0.0600 |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$1.00 |
$0.0600 |
| 860 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 554 | SD |
$20.00 |
$12.12 |
$10.50 |
$11.20 |
$10.00 |
$10.00 |
$11.00 |
$36.75 |
$11.00 |
| 870 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 2,800 | LF |
$1.00 |
$0.4400 |
$0.3800 |
$0.4000 |
$1.00 |
$0.3600 |
$0.5000 |
$3.50 |
$0.4000 |
| 880 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$165.00 |
$181.82 |
$157.50 |
$168.00 |
$200.00 |
$150.00 |
$200.00 |
$52.50 |
$165.00 |
| 890 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 12 | SF |
$45.00 |
$60.61 |
$52.50 |
$56.00 |
$75.00 |
$50.00 |
$75.00 |
$26.25 |
$55.00 |
| 900 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 40 | LF |
$20.00 |
$10.91 |
$9.45 |
$10.08 |
$15.00 |
$9.00 |
$10.00 |
$10.50 |
$9.90 |
| 910 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$35.00 |
$19.21 |
$16.64 |
$17.75 |
$25.00 |
$16.00 |
$20.00 |
$26.25 |
$17.44 |
| 920 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 35,659 | LF |
$1.00 |
$0.7200 |
$0.6200 |
$0.6600 |
$0.8500 |
$0.6000 |
$0.6500 |
$1.00 |
$0.6500 |
| 930 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 1,789 | LF |
$2.50 |
$2.42 |
$2.10 |
$2.24 |
$3.00 |
$2.20 |
$3.00 |
$4.25 |
$2.20 |
| 940 | 509(A)0200 |
CLASS AA CONCRETE | 24 | CY |
$900.00 |
$715.16 |
$619.50 |
$660.00 |
$1,000.00 |
$590.00 |
$600.00 |
$475.00 |
$649.00 |
| 950 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 1,480 | LF |
$15.00 |
$3.48 |
$3.01 |
$17.70 |
$4.00 |
$3.00 |
$3.00 |
$5.25 |
$3.16 |
| 960 | 628 7100 |
INSTALLATION OF CABLE BARRIER SYSTEM | 1,600 | LF |
$30.00 |
$19.20 |
$16.63 |
$17.74 |
$20.00 |
$16.00 |
$16.00 |
$36.75 |
$17.42 |
| 970 | 628(C)7400 |
END ANCHORS | 8 | EA |
$3,500.00 |
$6,109.18 |
$5,292.00 |
$5,645.00 |
$6,500.00 |
$5,500.00 |
$5,000.00 |
$9,000.00 |
$5,544.00 |
| 980 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$10,254.69 |
$19,530.00 |
$21,000.00 |
$22,000.00 |
$16,700.00 |
$35,000.00 |
$25,000.00 |
$22,000.00 |
| 990 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$120,000.00 |
$133,032.09 |
$202,723.48 |
$225,172.50 |
$253,000.00 |
$193,100.00 |
$205,000.00 |
$201,250.00 |
$169,000.00 |