| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$12,000.00 |
$35,600.00 |
$27,159.96 |
$52,465.49 |
$28,500.00 |
$40,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,145 | CY |
$16.00 |
$13.00 |
$18.00 |
$11.90 |
$29.98 |
$10.38 |
$35.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 150 | CY |
$30.00 |
$40.00 |
$15.00 |
$17.19 |
$10.50 |
$28.05 |
$40.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,750.00 |
$6,000.00 |
$7,505.00 |
$5,503.64 |
$13,747.00 |
$15,000.00 |
$45,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,775 | LF |
$3.00 |
$5.00 |
$6.79 |
$5.49 |
$2.78 |
$4.60 |
$4.25 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 56 | LF |
$19.00 |
$16.00 |
$15.99 |
$17.32 |
$14.70 |
$14.50 |
$27.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 4,712 | SY |
$5.00 |
$4.50 |
$4.86 |
$4.93 |
$3.62 |
$4.55 |
$8.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 1 | AC |
$1,790.00 |
$500.00 |
$1,200.00 |
$597.20 |
$3,675.00 |
$400.00 |
$6,000.00 |
| 90 | 241 3100 |
MOWING | 1.9 | AC |
$490.00 |
$275.00 |
$540.00 |
$298.60 |
$1,470.00 |
$250.00 |
$3,500.00 |
| 100 | 307(K)4200 |
STABILIZED SUBGRADE | 2,420 | SY |
$12.00 |
$12.00 |
$13.00 |
$9.20 |
$11.55 |
$12.00 |
$26.00 |
| 110 | 325 0100 |
SEPARATOR FABRIC | 2,566 | SY |
$3.00 |
$10.00 |
$2.67 |
$2.69 |
$4.16 |
$3.00 |
$22.00 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 15 | TON |
$60.00 |
$100.00 |
$74.75 |
$49.86 |
$86.84 |
$83.00 |
$70.00 |
| 130 | 407(B)7300 |
TACK COAT | 1,243 | GAL |
$4.50 |
$3.30 |
$3.55 |
$4.11 |
$3.15 |
$3.00 |
$5.00 |
| 140 | 408 8100 |
PRIME COAT | 613 | GAL |
$6.00 |
$5.50 |
$5.40 |
$6.33 |
$5.25 |
$5.00 |
$7.00 |
| 150 | 409(A)9200 |
FABRIC REINFORCEMENT | 700 | SY |
$7.00 |
$5.50 |
$5.61 |
$20.89 |
$5.25 |
$5.00 |
$31.00 |
| 160 | 409(B)9300 |
BITUMINOUS BINDER | 140 | GAL |
$13.00 |
$5.50 |
$7.00 |
$57.46 |
$5.25 |
$5.00 |
$41.00 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,297 | TON |
$140.00 |
$145.00 |
$145.41 |
$169.60 |
$132.30 |
$143.50 |
$225.00 |
| 180 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 1,146 | TON |
$170.00 |
$180.00 |
$177.55 |
$175.58 |
$163.80 |
$174.50 |
$230.00 |
| 190 | 412 3100 |
COLD MILLING PAVEMENT | 8,878 | SY |
$6.00 |
$10.00 |
$6.29 |
$4.95 |
$3.36 |
$8.30 |
$25.00 |
| 200 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$8,700.00 |
$8,517.19 |
$28,147.86 |
$15,875.00 |
$75,000.00 |
| 210 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 760 | SY |
$12.00 |
$10.00 |
$12.00 |
$15.40 |
$27.06 |
$19.98 |
$40.00 |
| 220 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 645 | LF |
$6.00 |
$3.00 |
$4.75 |
$3.28 |
$13.60 |
$2.75 |
$20.00 |
| 230 | 619(C)6600 |
SAWING PAVEMENT | 1,690 | LF |
$5.00 |
$8.00 |
$6.00 |
$7.44 |
$8.17 |
$4.95 |
$25.00 |
| 240 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 650 | LF |
$38.00 |
$30.00 |
$29.10 |
$31.65 |
$27.83 |
$26.50 |
$40.00 |
| 250 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,000.00 |
$3,850.00 |
$3,800.00 |
$4,180.37 |
$3,675.00 |
$3,500.00 |
$6,500.00 |
| 260 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,530.00 |
$3,500.00 |
$3,340.00 |
$3,583.18 |
$3,150.00 |
$3,000.00 |
$6,500.00 |
| 270 | 201 1100 |
(PL)REMOVE DRIFT AND SILT | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$6,250.00 |
$47,864.56 |
$20,932.00 |
$48,000.00 |
$100,000.00 |
| 280 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 120 | CY |
$27.00 |
$25.00 |
$35.00 |
$11.93 |
$59.27 |
$18.00 |
$60.00 |
| 290 | 501(G)1800 |
CLSM BACKFILL | 120 | CY |
$220.00 |
$240.00 |
$327.00 |
$224.33 |
$302.90 |
$266.00 |
$450.00 |
| 300 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$30,000.00 |
$40,000.00 |
$112,000.00 |
$52,064.75 |
$45,770.55 |
$80,000.00 |
$175,000.00 |
| 310 | 504(A)5200 |
APPROACH SLAB | 331.8 | SY |
$300.00 |
$325.00 |
$338.73 |
$312.97 |
$349.08 |
$334.00 |
$650.00 |
| 320 | 504(B)5300 |
SAW-CUT GROOVING | 4,828 | SY |
$4.00 |
$4.20 |
$4.40 |
$4.54 |
$3.99 |
$3.80 |
$10.00 |
| 330 | 504(D)5420 |
CONCRETE RAIL (TR4) | 1,825 | LF |
$107.00 |
$125.00 |
$141.93 |
$95.34 |
$103.56 |
$120.00 |
$175.00 |
| 340 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 52 | EA |
$2,900.00 |
$2,200.00 |
$2,901.93 |
$3,507.39 |
$3,326.31 |
$3,200.00 |
$4,000.00 |
| 350 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 52 | EA |
$2,940.00 |
$2,200.00 |
$2,901.93 |
$3,507.39 |
$3,307.71 |
$3,200.00 |
$4,000.00 |
| 360 | 509(A)0210 |
CLASS AA CONCRETE | 1,333.8 | CY |
$580.00 |
$850.00 |
$800.13 |
$708.55 |
$818.21 |
$975.00 |
$1,200.00 |
| 370 | 509(B)0320 |
CLASS A CONCRETE | 73.6 | CY |
$1,030.00 |
$1,200.00 |
$1,752.23 |
$4,220.78 |
$2,715.45 |
$1,770.50 |
$1,300.00 |
| 380 | 509(D)0510 |
CLASS C CONCRETE | 25 | CY |
$646.00 |
$500.00 |
$646.00 |
$579.26 |
$1,030.31 |
$700.00 |
$1,000.00 |
| 390 | 511 2100 |
MECHANICAL SPLICES | 2,932 | EA |
$40.00 |
$45.00 |
$43.41 |
$47.87 |
$35.07 |
$43.40 |
$75.00 |
| 400 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 319,800 | LB |
$1.60 |
$1.40 |
$1.51 |
$1.50 |
$1.59 |
$1.63 |
$3.00 |
| 410 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 3,388 | SY |
$5.00 |
$5.00 |
$6.25 |
$6.57 |
$5.78 |
$5.50 |
$8.00 |
| 420 | 517 9110 |
ELASTOMERIC COATING | 2,604.6 | SF |
$23.00 |
$22.00 |
$24.00 |
$22.69 |
$19.95 |
$20.00 |
$40.00 |
| 430 | 518(B)0300 |
SEALED EXPANSION JOINTS | 406.1 | LF |
$440.00 |
$300.00 |
$346.90 |
$262.15 |
$274.32 |
$359.00 |
$500.00 |
| 440 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$38.00 |
$44.00 |
$45.00 |
$41.80 |
$36.75 |
$40.00 |
$75.00 |
| 450 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 7 | GAL |
$134.00 |
$135.00 |
$165.00 |
$59.72 |
$52.50 |
$125.00 |
$250.00 |
| 460 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$1,000.00 |
$880.00 |
$1,530.00 |
$1,588.54 |
$1,396.50 |
$800.00 |
$1,200.00 |
| 470 | 523(A)3200 |
SEALER CRACK PREPARATION | 852.5 | LF |
$4.60 |
$5.00 |
$7.00 |
$5.97 |
$5.25 |
$5.00 |
$8.00 |
| 480 | 523(B)3300 |
SEALER RESIN | 10 | GAL |
$86.00 |
$120.00 |
$240.00 |
$214.99 |
$189.00 |
$180.00 |
$150.00 |
| 490 | 540 8120 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 54 | EA |
$1,025.00 |
$2,850.00 |
$2,944.93 |
$2,938.20 |
$2,583.00 |
$2,650.00 |
$3,500.00 |
| 500 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$250,000.00 |
$200,000.00 |
$246,000.00 |
$295,277.32 |
$434,177.38 |
$440,000.00 |
$350,000.00 |
| 510 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 580 | SD |
$136.00 |
$84.00 |
$80.80 |
$89.58 |
$78.75 |
$90.00 |
$149.00 |
| 520 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 12,844 | LF |
$1.80 |
$1.05 |
$1.40 |
$1.19 |
$1.05 |
$1.00 |
$6.00 |
| 530 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 6,500 | LF |
$0.7000 |
$0.4200 |
$0.4300 |
$0.4800 |
$0.4200 |
$0.4000 |
$1.00 |
| 540 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 430 | EA |
$7.80 |
$10.50 |
$11.10 |
$11.94 |
$10.50 |
$10.00 |
$14.00 |
| 550 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 50 | EA |
$8.20 |
$10.50 |
$12.00 |
$11.94 |
$10.50 |
$10.00 |
$14.00 |
| 560 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,160 | SD |
$19.00 |
$10.50 |
$11.00 |
$11.94 |
$10.50 |
$10.00 |
$5.00 |
| 570 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,450 | LF |
$25.00 |
$21.00 |
$23.00 |
$23.89 |
$21.00 |
$23.50 |
$125.00 |
| 580 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,450 | LF |
$8.00 |
$3.20 |
$4.50 |
$3.58 |
$3.15 |
$4.00 |
$75.00 |
| 590 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,350 | SD |
$0.6000 |
$0.0700 |
$0.0700 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0200 |
| 600 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,320 | SD |
$1.30 |
$2.05 |
$2.17 |
$2.39 |
$2.10 |
$4.00 |
$14.50 |
| 610 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,670 | SD |
$1.60 |
$0.0700 |
$0.0700 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0200 |
| 620 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 580 | SD |
$2.00 |
$0.0700 |
$0.0700 |
$0.0600 |
$0.0500 |
$0.0500 |
$15.00 |
| 630 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 7,830 | SD |
$0.6000 |
$2.05 |
$2.17 |
$2.39 |
$2.10 |
$4.00 |
$0.0200 |
| 640 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 2,900 | SD |
$0.3000 |
$0.1200 |
$0.1200 |
$0.1200 |
$0.1100 |
$0.1000 |
$0.0200 |
| 650 | 880(F)6700 |
DRUMS | 5,800 | SD |
$0.5000 |
$0.2700 |
$0.2900 |
$0.3000 |
$0.2600 |
$0.2500 |
$0.0200 |
| 660 | 880(I)7000 |
FLAGGER | 30 | SD |
$146.00 |
$200.00 |
$247.00 |
$812.67 |
$532.82 |
$200.00 |
$5.00 |
| 670 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 608 | SD |
$19.00 |
$12.50 |
$13.40 |
$14.33 |
$12.60 |
$12.00 |
$8.00 |
| 680 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 3,775 | LF |
$1.00 |
$2.00 |
$1.10 |
$1.19 |
$1.05 |
$1.00 |
$1.50 |
| 690 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$400.00 |
$400.00 |
$410.00 |
$447.90 |
$393.75 |
$375.00 |
$500.00 |
| 700 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 26 | EA |
$24.00 |
$30.00 |
$27.40 |
$29.86 |
$26.25 |
$25.00 |
$25.00 |
| 710 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 11,200 | LF |
$1.60 |
$0.7500 |
$0.7600 |
$0.8400 |
$0.7400 |
$1.25 |
$2.00 |
| 720 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$21,000.00 |
$27,596.67 |
$18,900.00 |
$21,500.00 |
$28,000.00 |
| 730 | 640(A)1200 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$10,000.00 |
$21,500.00 |
$7,763.55 |
$16,695.00 |
$9,150.00 |
$35,000.00 |
| 740 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$208,000.00 |
$200,000.00 |
$250,000.00 |
$232,885.33 |
$268,755.82 |
$210,000.00 |
$630,000.00 |