| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$56,789.13 |
$11,514.25 |
$12,000.00 |
$29,854.24 |
$31,730.00 |
$18,000.00 |
$20,000.00 |
$40,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,958 | CY |
$12.00 |
$20.48 |
$13.63 |
$11.00 |
$14.09 |
$12.90 |
$16.32 |
$30.00 |
$13.50 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 4,631 | CY |
$15.00 |
$0.2500 |
$17.84 |
$17.47 |
$16.14 |
$16.10 |
$19.15 |
$30.00 |
$30.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$7,500.00 |
$11,635.91 |
$8,487.23 |
$6,000.00 |
$21,980.19 |
$30,585.00 |
$14,120.00 |
$15,000.00 |
$25,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 228 | LF |
$5.00 |
$4.22 |
$9.64 |
$2.95 |
$7.28 |
$8.55 |
$8.20 |
$5.00 |
$3.10 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 378 | LF |
$16.00 |
$9.73 |
$15.72 |
$18.95 |
$19.60 |
$14.00 |
$21.85 |
$25.00 |
$20.00 |
| 70 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 29 | CY |
$175.00 |
$392.50 |
$153.75 |
$200.00 |
$182.00 |
$452.50 |
$117.38 |
$75.00 |
$220.00 |
| 80 | 221(G)2800 |
TEMPORARY FIBER LOG | 2,054 | LF |
$6.25 |
$2.63 |
$4.52 |
$5.95 |
$9.36 |
$4.00 |
$11.00 |
$6.00 |
$6.25 |
| 90 | 229 6100 |
DITCH LINER PROTECTION | 419 | LF |
$4.00 |
$7.45 |
$4.81 |
$6.95 |
$4.15 |
$3.60 |
$4.95 |
$10.00 |
$7.25 |
| 100 | 230(A)7200 |
SOLID SLAB SODDING | 7,932 | SY |
$3.00 |
$7.52 |
$4.04 |
$6.95 |
$4.15 |
$3.60 |
$5.50 |
$7.00 |
$7.25 |
| 110 | 233(E)0600 |
(SP) HYDROMULCH | 7,777 | SY |
$5.00 |
$7.52 |
$5.42 |
$6.95 |
$7.68 |
$4.80 |
$8.35 |
$7.00 |
$7.25 |
| 120 | 241 3100 |
MOWING | 3.21 | AC |
$500.00 |
$513.81 |
$301.20 |
$475.00 |
$1,336.40 |
$267.50 |
$1,395.00 |
$500.00 |
$495.00 |
| 130 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 2 | EA |
$4,200.00 |
$9,342.03 |
$5,255.93 |
$3,213.00 |
$3,705.49 |
$8,031.00 |
$1,000.00 |
$6,500.00 |
$4,250.00 |
| 140 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,638 | CY |
$95.00 |
$73.64 |
$100.95 |
$96.10 |
$86.63 |
$98.50 |
$95.16 |
$65.00 |
$125.00 |
| 150 | 307(K)4200 |
STABILIZED SUBGRADE | 3,913 | SY |
$11.00 |
$8.28 |
$8.82 |
$12.00 |
$11.97 |
$12.90 |
$16.25 |
$16.00 |
$10.00 |
| 160 | 325 0100 |
SEPARATOR FABRIC | 3,227 | SY |
$3.25 |
$2.12 |
$1.91 |
$2.82 |
$1.26 |
$5.35 |
$4.00 |
$5.00 |
$1.95 |
| 170 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,112 | TON |
$40.00 |
$34.10 |
$48.36 |
$49.11 |
$49.56 |
$49.30 |
$45.00 |
$60.00 |
$65.50 |
| 190 | 407(B)7300 |
TACK COAT | 830 | GAL |
$5.50 |
$6.43 |
$5.72 |
$3.00 |
$0.1500 |
$3.15 |
$3.50 |
$5.00 |
$3.25 |
| 200 | 408 8100 |
PRIME COAT | 2,144 | GAL |
$4.50 |
$0.5000 |
$6.36 |
$5.00 |
$5.20 |
$9.60 |
$6.10 |
$6.00 |
$5.25 |
| 210 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 633 | TON |
$145.00 |
$133.91 |
$119.29 |
$127.00 |
$132.08 |
$180.50 |
$158.80 |
$150.00 |
$133.00 |
| 220 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 1,041 | TON |
$165.00 |
$149.98 |
$136.27 |
$158.00 |
$164.32 |
$179.00 |
$182.61 |
$175.00 |
$166.50 |
| 230 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 75 | TON |
$280.00 |
$214.25 |
$221.18 |
$200.00 |
$208.00 |
$290.50 |
$235.00 |
$250.00 |
$210.00 |
| 240 | 412 3100 |
COLD MILLING PAVEMENT | 9,290 | SY |
$4.25 |
$5.89 |
$4.57 |
$4.10 |
$4.49 |
$8.90 |
$11.63 |
$8.00 |
$4.25 |
| 250 | 509(D)0500 |
CLASS C CONCRETE | 71 | CY |
$500.00 |
$442.37 |
$508.85 |
$800.00 |
$306.51 |
$799.50 |
$575.00 |
$700.00 |
$500.00 |
| 260 | 601(B)1200 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 54 | TON |
$110.00 |
$112.81 |
$74.63 |
$95.37 |
$101.45 |
$117.50 |
$87.99 |
$125.00 |
$132.50 |
| 270 | 613(A)5224 |
36" R.C.PIPE CLASS III | 25 | LF |
$310.00 |
$118.26 |
$204.67 |
$316.00 |
$318.24 |
$160.50 |
$174.38 |
$200.00 |
$290.00 |
| 280 | 613(A)5416 |
34" X 53" R.C.PIPE ELL. CLASS HE-III | 25 | LF |
$380.00 |
$234.35 |
$342.67 |
$499.00 |
$386.88 |
$267.50 |
$343.06 |
$550.00 |
$475.00 |
| 290 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$2,700.00 |
$2,185.82 |
$3,380.06 |
$3,458.00 |
$2,756.00 |
$3,212.00 |
$3,980.00 |
$2,200.00 |
$2,250.00 |
| 300 | 613(L)6816 |
34" X 53" PREFAB. CULVERT END SEC., ELLI | 1 | EA |
$4,600.00 |
$2,920.44 |
$5,179.04 |
$5,177.00 |
$4,680.00 |
$4,818.00 |
$5,500.00 |
$5,000.00 |
$3,000.00 |
| 310 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$12,627.35 |
$5,453.69 |
$7,500.00 |
$36,400.00 |
$33,870.00 |
$12,500.00 |
$5,000.00 |
$2,750.00 |
| 320 | 619(B)6352 |
REMOVAL OF FENCE | 266 | LF |
$4.00 |
$5.86 |
$2.41 |
$5.00 |
$4.06 |
$3.20 |
$18.00 |
$8.00 |
$9.50 |
| 330 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,064 | SY |
$11.00 |
$1.94 |
$6.98 |
$9.25 |
$9.36 |
$20.20 |
$14.49 |
$13.00 |
$4.25 |
| 340 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,052 | LF |
$6.00 |
$4.75 |
$4.82 |
$4.00 |
$4.16 |
$6.00 |
$6.70 |
$7.00 |
$5.50 |
| 350 | 619(B)6436 |
REMOVAL OF CONCRETE DITCH LINER | 183 | LF |
$18.00 |
$17.74 |
$11.57 |
$11.50 |
$12.48 |
$12.90 |
$32.00 |
$20.00 |
$10.00 |
| 360 | 619(C)6600 |
SAWING PAVEMENT | 1,491 | LF |
$4.00 |
$1.53 |
$6.97 |
$5.00 |
$4.68 |
$5.25 |
$6.00 |
$8.00 |
$3.50 |
| 370 | 624(A)3200 |
FENCE-STYLE WWF | 184 | LF |
$8.00 |
$51.96 |
$60.24 |
$65.00 |
$50.44 |
$69.60 |
$76.09 |
$80.00 |
$60.00 |
| 380 | 627(B)6300 |
CONCRETE LONGITUDINAL BARRIER END SEC. | 4 | EA |
$3,800.00 |
$2,049.10 |
$4,279.38 |
$5,000.00 |
$1,777.17 |
$5,928.00 |
$3,468.75 |
$3,500.00 |
$1,850.00 |
| 390 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 400 | LF |
$50.00 |
$60.90 |
$81.36 |
$15.00 |
$66.83 |
$90.30 |
$140.00 |
$75.00 |
$80.00 |
| 400 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 260 | CY |
$28.00 |
$43.31 |
$25.50 |
$100.00 |
$11.11 |
$22.40 |
$35.00 |
$30.00 |
$12.00 |
| 410 | 501(G)1800 |
CLSM BACKFILL | 240.8 | CY |
$275.00 |
$292.31 |
$236.00 |
$289.60 |
$182.68 |
$198.00 |
$310.00 |
$400.00 |
$235.00 |
| 420 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$10,000.00 |
$5,356.41 |
$47,140.75 |
$1,085.00 |
$77,064.53 |
$50,355.00 |
$102,836.00 |
$50,000.00 |
$3,000.00 |
| 430 | 504(A)5200 |
APPROACH SLAB | 424.1 | SY |
$325.00 |
$276.92 |
$312.33 |
$271.09 |
$249.79 |
$318.50 |
$362.38 |
$325.00 |
$345.00 |
| 440 | 504(B)5300 |
SAW-CUT GROOVING | 1,297.9 | SY |
$6.00 |
$5.89 |
$6.63 |
$5.50 |
$5.72 |
$5.90 |
$6.90 |
$10.00 |
$5.75 |
| 450 | 504(E)5520 |
42" F-SHAPED PARAPET | 385.8 | LF |
$175.00 |
$116.41 |
$154.48 |
$115.07 |
$110.50 |
$200.00 |
$166.18 |
$120.00 |
$170.00 |
| 460 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 282,670 | LB |
$3.60 |
$2.01 |
$2.22 |
$2.32 |
$2.10 |
$2.25 |
$2.60 |
$2.00 |
$2.65 |
| 470 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$3,500.00 |
$3,509.95 |
$2,638.72 |
$3,052.46 |
$2,486.53 |
$2,678.00 |
$3,630.00 |
$3,000.00 |
$3,750.00 |
| 480 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 6 | EA |
$3,750.00 |
$3,509.95 |
$2,638.72 |
$3,052.46 |
$2,486.53 |
$2,678.00 |
$3,630.00 |
$3,000.00 |
$3,750.00 |
| 490 | 509(A)0210 |
CLASS AA CONCRETE | 240 | CY |
$850.00 |
$1,008.21 |
$1,088.70 |
$1,017.00 |
$1,049.12 |
$848.00 |
$1,037.00 |
$1,500.00 |
$1,050.00 |
| 500 | 509(B)0320 |
CLASS A CONCRETE | 155.5 | CY |
$875.00 |
$630.80 |
$727.74 |
$1,017.00 |
$910.89 |
$1,008.00 |
$1,009.66 |
$1,000.00 |
$1,225.00 |
| 510 | 509(D)0510 |
CLASS C CONCRETE | 34.4 | CY |
$800.00 |
$659.29 |
$631.68 |
$1,017.00 |
$591.70 |
$1,383.00 |
$540.00 |
$800.00 |
$560.00 |
| 520 | 511 2100 |
MECHANICAL SPLICES | 792 | EA |
$60.00 |
$59.99 |
$66.33 |
$154.25 |
$73.17 |
$67.80 |
$79.90 |
$65.00 |
$85.00 |
| 530 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 90,850 | LB |
$1.75 |
$1.46 |
$1.50 |
$1.62 |
$1.35 |
$1.60 |
$1.54 |
$3.00 |
$1.80 |
| 540 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 114 | LF |
$55.00 |
$40.00 |
$45.21 |
$46.71 |
$84.02 |
$58.90 |
$45.41 |
$65.00 |
$75.00 |
| 550 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 680 | LF |
$60.00 |
$53.62 |
$60.56 |
$56.13 |
$75.58 |
$64.30 |
$51.92 |
$75.00 |
$105.00 |
| 560 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 114 | LF |
$25.00 |
$70.65 |
$47.54 |
$20.00 |
$12.31 |
$70.50 |
$35.00 |
$40.00 |
$20.00 |
| 570 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 680 | LF |
$25.00 |
$84.55 |
$35.11 |
$20.00 |
$10.13 |
$31.50 |
$31.00 |
$40.00 |
$20.00 |
| 580 | 514(K)6200 |
(PL)PILOT HOLES | 246 | LF |
$275.00 |
$209.47 |
$156.13 |
$209.25 |
$203.23 |
$166.50 |
$307.39 |
$200.00 |
$275.00 |
| 590 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 600 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 3,677 | SY |
$7.00 |
$6.05 |
$6.81 |
$5.67 |
$5.88 |
$6.05 |
$6.25 |
$5.00 |
$6.00 |
| 610 | 517 9110 |
ELASTOMERIC COATING | 682 | SF |
$27.00 |
$21.43 |
$24.10 |
$20.00 |
$20.80 |
$21.40 |
$29.00 |
$28.00 |
$25.00 |
| 620 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 67.82 | LF |
$30.00 |
$32.14 |
$36.14 |
$700.00 |
$31.86 |
$32.10 |
$37.00 |
$50.00 |
$35.00 |
| 630 | 518(D)0500 |
ELASTOMERIC MORTAR | 5 | CF |
$600.00 |
$749.89 |
$843.35 |
$30.00 |
$728.00 |
$749.50 |
$1,600.00 |
$500.00 |
$735.00 |
| 640 | 523(A)3200 |
SEALER CRACK PREPARATION | 334 | LF |
$6.00 |
$7.50 |
$8.43 |
$7.00 |
$7.28 |
$7.50 |
$9.00 |
$5.00 |
$7.35 |
| 650 | 523(B)3300 |
SEALER RESIN | 3.7 | GAL |
$250.00 |
$235.68 |
$265.05 |
$220.00 |
$228.80 |
$235.50 |
$270.00 |
$135.00 |
$240.00 |
| 660 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,050 | TON |
$70.00 |
$15.62 |
$81.06 |
$73.63 |
$78.48 |
$78.80 |
$71.00 |
$125.00 |
$5.00 |
| 670 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 205 | TON |
$55.00 |
$37.77 |
$59.60 |
$59.52 |
$57.12 |
$91.50 |
$59.00 |
$125.00 |
$67.00 |
| 680 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 770 | SY |
$8.00 |
$3.49 |
$2.04 |
$11.00 |
$4.08 |
$13.20 |
$3.50 |
$5.00 |
$3.50 |
| 690 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 142 | LF |
$40.00 |
$33.84 |
$39.94 |
$50.00 |
$23.56 |
$85.90 |
$39.00 |
$30.00 |
$60.00 |
| 700 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 96 | LF |
$50.00 |
$27.98 |
$39.95 |
$50.00 |
$22.96 |
$43.20 |
$35.00 |
$30.00 |
$20.00 |
| 710 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$60,000.00 |
$127,254.66 |
$90,769.83 |
$54,250.00 |
$174,746.68 |
$127,310.54 |
$71,250.00 |
$22,000.00 |
$275,000.00 |
| 720 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$300.00 |
$594.15 |
$602.40 |
$500.00 |
$520.00 |
$267.50 |
$540.00 |
$350.00 |
$275.00 |
| 730 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 28 | SF |
$200.00 |
$118.83 |
$120.48 |
$100.00 |
$104.00 |
$91.00 |
$112.00 |
$100.00 |
$90.00 |
| 740 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 10,675 | LF |
$2.50 |
$1.49 |
$1.51 |
$1.25 |
$1.30 |
$1.10 |
$1.34 |
$1.25 |
$1.10 |
| 750 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 10,675 | LF |
$0.6500 |
$0.1200 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.2400 |
$0.1200 |
$0.3000 |
$0.2500 |
| 760 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 675 | LF |
$35.00 |
$32.08 |
$32.53 |
$27.00 |
$28.08 |
$23.60 |
$45.00 |
$26.00 |
$23.00 |
| 761 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 2 | EA |
$3,500.00 |
$2,733.10 |
$2,771.02 |
$2,300.00 |
$2,392.00 |
$3,571.00 |
$2,700.00 |
$4,000.00 |
$3,500.00 |
| 770 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$4,000.00 |
$4,515.56 |
$4,578.20 |
$3,800.00 |
$3,952.00 |
$3,639.00 |
$4,250.00 |
$4,000.00 |
$3,575.00 |
| 790 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 17 | EA |
$18.00 |
$59.41 |
$60.24 |
$50.00 |
$52.00 |
$17.70 |
$56.00 |
$20.00 |
$17.35 |
| 800 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 23,000 | LF |
$2.50 |
$0.5900 |
$0.6000 |
$0.5000 |
$0.5200 |
$1.95 |
$0.5600 |
$2.10 |
$1.95 |
| 810 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 400 | SD |
$30.00 |
$41.59 |
$42.17 |
$35.00 |
$36.40 |
$16.10 |
$38.00 |
$15.00 |
$15.75 |
| 820 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,550 | LF |
$35.00 |
$15.27 |
$26.25 |
$14.00 |
$11.18 |
$18.70 |
$25.75 |
$21.00 |
$18.50 |
| 830 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 4 | SD |
$100.00 |
$29.71 |
$30.12 |
$25.00 |
$26.00 |
$80.30 |
$27.00 |
$75.00 |
$78.50 |
| 840 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,600 | SD |
$0.7500 |
$0.3000 |
$0.3000 |
$0.2500 |
$0.2600 |
$4.30 |
$0.2800 |
$4.00 |
$4.20 |
| 850 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,300 | SD |
$1.25 |
$0.3000 |
$0.3000 |
$0.2500 |
$0.2600 |
$0.0200 |
$0.2700 |
$0.0200 |
$0.0500 |
| 860 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,700 | SD |
$2.50 |
$0.3000 |
$0.3000 |
$0.2500 |
$0.2600 |
$0.0200 |
$0.2700 |
$0.0200 |
$0.0500 |
| 870 | 880(B)6330 |
CONSTRUCTION SIGNS 33.0 SF & OVER | 600 | SD |
$5.00 |
$1.19 |
$1.20 |
$1.00 |
$1.04 |
$0.0200 |
$1.09 |
$0.0200 |
$0.0500 |
| 880 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,100 | SD |
$2.25 |
$0.5900 |
$0.6000 |
$0.5000 |
$0.5200 |
$0.0200 |
$0.5600 |
$0.0200 |
$0.0500 |
| 890 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 4,600 | SD |
$0.6000 |
$0.3000 |
$0.3000 |
$0.2500 |
$0.2600 |
$0.0200 |
$0.2700 |
$0.0200 |
$0.0500 |
| 900 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 400 | SD |
$1.00 |
$1.19 |
$1.20 |
$1.00 |
$1.04 |
$4.80 |
$1.10 |
$4.50 |
$4.75 |
| 910 | 880(F)6700 |
DRUMS | 400 | SD |
$1.00 |
$1.19 |
$1.20 |
$1.00 |
$1.04 |
$5.35 |
$1.10 |
$5.00 |
$5.25 |
| 920 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 500 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 930 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,300 | SD |
$20.00 |
$5.94 |
$6.02 |
$5.00 |
$5.20 |
$7.50 |
$5.45 |
$7.00 |
$7.50 |
| 940 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,500.00 |
$27,705.24 |
$16,011.47 |
$14,100.00 |
$11,544.00 |
$31,925.00 |
$12,400.00 |
$13,500.00 |
$15,000.00 |
| 950 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,749.49 |
$3,011.97 |
$3,000.00 |
$3,283.18 |
$2,945.00 |
$3,500.00 |
$3,500.00 |
$5,000.00 |
| 960 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$208,975.00 |
$131,312.78 |
$190,090.88 |
$84,557.83 |
$192,290.80 |
$176,760.00 |
$210,000.00 |
$230,000.00 |
$220,000.00 |