| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$2,500.00 |
$7,500.00 |
$7,500.00 |
$8,661.69 |
$20,842.48 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 990 | CY |
$11.00 |
$9.00 |
$24.00 |
$14.24 |
$11.88 |
$14.58 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 804 | CY |
$14.00 |
$10.00 |
$3.00 |
$19.70 |
$18.18 |
$16.20 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$5,200.00 |
$7,775.00 |
$6,000.00 |
$12,644.70 |
$13,824.33 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 846 | LF |
$4.75 |
$4.40 |
$4.40 |
$8.20 |
$4.78 |
$4.32 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 140 | LF |
$17.00 |
$16.50 |
$17.05 |
$16.00 |
$18.54 |
$16.74 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 4,116 | SY |
$4.25 |
$3.77 |
$4.15 |
$5.90 |
$4.10 |
$3.70 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 0.85 | AC |
$1,800.00 |
$750.00 |
$750.00 |
$4,010.00 |
$897.15 |
$810.10 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 342 | CY |
$100.00 |
$110.00 |
$127.50 |
$132.40 |
$153.91 |
$145.82 |
| 100 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$450.00 |
$275.00 |
$350.00 |
$190.00 |
$574.13 |
$807.08 |
| 110 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 124 | TON |
$95.00 |
$85.00 |
$95.50 |
$77.50 |
$99.86 |
$96.13 |
| 120 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 50 | LF |
$75.00 |
$60.00 |
$66.00 |
$85.00 |
$76.19 |
$83.17 |
| 130 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$450.00 |
$500.00 |
$785.00 |
$700.00 |
$1,324.35 |
$1,290.76 |
| 140 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$7,300.00 |
$5,000.00 |
$4,731.11 |
$15,768.56 |
| 150 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$31.50 |
$28.60 |
$28.60 |
$45.44 |
$31.10 |
$30.24 |
| 160 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$2,600.00 |
$3,300.00 |
$2,585.00 |
$3,350.00 |
$2,811.07 |
$972.12 |
| 170 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 76 | LF |
$20.00 |
$104.50 |
$110.00 |
$108.00 |
$8.97 |
$91.81 |
| 180 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 136 | CY |
$15.00 |
$15.00 |
$17.50 |
$32.00 |
$15.37 |
$27.24 |
| 190 | 501(F)1700 |
GRANULAR BACKFILL | 46 | CY |
$112.00 |
$120.00 |
$122.50 |
$154.00 |
$112.28 |
$335.46 |
| 200 | 503(A)4200 |
PRESTRESSED CONCRETE BEAMS | 598.5 | LF |
$460.00 |
$495.00 |
$558.50 |
$644.42 |
$613.74 |
$572.73 |
| 210 | 504 5130 |
BRIDGE TRAFFIC RAIL | 200 | LF |
$60.00 |
$70.00 |
$195.00 |
$151.20 |
$625.70 |
$308.85 |
| 220 | 506(A)7200 |
STRUCTURAL STEEL | 2,690 | LB |
$6.50 |
$3.00 |
$5.00 |
$3.10 |
$2.04 |
$24.11 |
| 230 | 507(C)8400 |
ELASTOMERIC BEARING PADS | 72 | EA |
$145.00 |
$210.00 |
$325.00 |
$434.99 |
$228.04 |
$326.18 |
| 240 | 509(B)0320 |
CLASS A CONCRETE | 89 | CY |
$1,080.00 |
$835.00 |
$1,118.00 |
$1,072.24 |
$1,048.35 |
$1,201.42 |
| 250 | 511(A)2210 |
REINFORCING STEEL | 12,020 | LB |
$1.35 |
$1.25 |
$1.43 |
$1.63 |
$1.30 |
$1.88 |
| 260 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 280 | LF |
$48.00 |
$50.00 |
$69.60 |
$57.45 |
$57.45 |
$82.28 |
| 270 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 280 | LF |
$15.00 |
$20.00 |
$17.40 |
$28.00 |
$40.52 |
$38.10 |
| 280 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 290 | 516(A)8230 |
DRILLED SHAFTS 48" DIAMETER | 136 | LF |
$1,065.00 |
$910.00 |
$945.00 |
$1,007.00 |
$1,182.03 |
$1,014.16 |
| 300 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 374 | TON |
$86.75 |
$88.00 |
$92.50 |
$76.50 |
$95.89 |
$96.13 |
| 310 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 125 | TON |
$65.50 |
$70.00 |
$70.75 |
$64.50 |
$77.40 |
$85.33 |
| 320 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 130 | LF |
$35.00 |
$40.00 |
$57.00 |
$35.00 |
$13.74 |
$60.04 |
| 330 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$35.00 |
$40.00 |
$54.50 |
$30.00 |
$19.98 |
$28.11 |
| 340 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$14,000.00 |
$10,000.00 |
$24,000.00 |
$22,000.00 |
$12,629.83 |
$28,240.57 |
| 350 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,400 | SD |
$0.5000 |
$0.0600 |
$0.0600 |
$0.0900 |
$0.0600 |
$0.7000 |
| 360 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 240 | SD |
$4.00 |
$0.0600 |
$0.0600 |
$0.0900 |
$0.0600 |
$5.40 |
| 370 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,920 | SD |
$0.8000 |
$0.0600 |
$0.0600 |
$0.0900 |
$0.0600 |
$0.1100 |
| 380 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,800 | SD |
$0.4500 |
$0.0600 |
$0.0600 |
$0.0900 |
$0.0600 |
$0.0500 |
| 390 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,400.00 |
$7,480.00 |
$8,300.00 |
$8,400.00 |
$7,805.82 |
$10,745.95 |
| 400 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$2,000.00 |
$3,040.00 |
$3,000.00 |
$3,588.60 |
$1,701.21 |
| 410 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$40,000.00 |
$64,000.00 |
$60,000.00 |
$82,596.16 |
$79,913.28 |