| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$60,000.00 |
$26,565.00 |
$30,000.00 |
$16,200.00 |
$10,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 5,100 | CY |
$16.00 |
$17.90 |
$7.00 |
$8.91 |
$15.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,235 | CY |
$20.00 |
$1.05 |
$9.00 |
$16.30 |
$25.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$13,109.25 |
$8,000.00 |
$11,250.00 |
$8,500.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,500 | LF |
$4.00 |
$4.73 |
$3.30 |
$3.60 |
$5.50 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 140 | LF |
$17.00 |
$15.75 |
$11.00 |
$12.00 |
$18.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 5,300 | SY |
$6.00 |
$4.20 |
$3.90 |
$4.02 |
$5.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 3.6 | AC |
$2,500.00 |
$2,100.00 |
$2,200.00 |
$2,100.00 |
$2,400.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,155 | CY |
$115.00 |
$57.47 |
$100.00 |
$101.60 |
$100.00 |
| 100 | 407(B)7300 |
TACK COAT | 687 | GAL |
$5.00 |
$3.15 |
$3.30 |
$3.35 |
$3.75 |
| 110 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,317 | TON |
$130.00 |
$124.95 |
$133.00 |
$139.00 |
$155.00 |
| 120 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 558 | TON |
$150.00 |
$141.75 |
$150.00 |
$145.13 |
$175.00 |
| 130 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 107 | TON |
$100.00 |
$92.42 |
$75.00 |
$83.60 |
$110.00 |
| 140 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 150 | TON |
$75.00 |
$69.01 |
$58.00 |
$71.00 |
$78.00 |
| 150 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 100 | LF |
$90.00 |
$54.64 |
$55.00 |
$64.90 |
$67.00 |
| 160 | 613(B)5524 |
30" CORR. GALV. STEEL PIPE | 51 | LF |
$100.00 |
$67.66 |
$68.00 |
$92.00 |
$80.00 |
| 170 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$3,000.00 |
$1,618.11 |
$2,500.00 |
$1,850.00 |
$3,500.00 |
| 180 | 613(M)6968 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$3,500.00 |
$1,836.90 |
$3,000.00 |
$2,150.00 |
$2,000.00 |
| 190 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 2 | EA |
$1,000.00 |
$1,575.00 |
$1,000.00 |
$1,200.00 |
$2,000.00 |
| 200 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$15,750.00 |
$30,000.00 |
$7,000.00 |
$8,500.00 |
| 210 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,520 | SY |
$12.00 |
$5.41 |
$10.00 |
$8.39 |
$20.00 |
| 220 | 619(C)6600 |
SAWING PAVEMENT | 80 | LF |
$8.00 |
$6.83 |
$10.00 |
$7.00 |
$10.00 |
| 230 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 240 | LF |
$50.00 |
$26.25 |
$27.50 |
$25.66 |
$32.00 |
| 240 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 2 | EA |
$4,000.00 |
$2,940.00 |
$3,500.00 |
$4,586.00 |
$3,500.00 |
| 250 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$3,000.00 |
$3,150.00 |
$3,800.00 |
$3,685.00 |
$3,200.00 |
| 260 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 720 | LF |
$15.00 |
$9.45 |
$10.00 |
$11.41 |
$15.00 |
| 270 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$50.00 |
$15.33 |
$15.00 |
$24.00 |
$35.00 |
| 280 | 501(F)1700 |
GRANULAR BACKFILL | 80 | CY |
$100.00 |
$295.94 |
$100.00 |
$112.86 |
$100.00 |
| 290 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 596.1 | LF |
$325.00 |
$301.21 |
$325.00 |
$338.97 |
$425.00 |
| 300 | 504(B)5300 |
SAW-CUT GROOVING | 467.4 | SY |
$10.00 |
$6.72 |
$7.00 |
$7.00 |
$10.00 |
| 310 | 504(D)5410 |
CONCRETE RAIL (TR3) | 356 | LF |
$110.00 |
$102.05 |
$100.00 |
$132.72 |
$140.00 |
| 320 | 506(A)7200 |
STRUCTURAL STEEL | 1,110 | LB |
$6.00 |
$3.42 |
$3.50 |
$3.98 |
$10.00 |
| 330 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,000.00 |
$1,103.17 |
$700.00 |
$1,490.00 |
$1,600.00 |
| 340 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 16 | EA |
$2,200.00 |
$1,014.33 |
$700.00 |
$1,420.00 |
$1,600.00 |
| 350 | 509(A)0210 |
CLASS AA CONCRETE | 146 | CY |
$1,300.00 |
$1,131.77 |
$900.00 |
$970.00 |
$1,650.00 |
| 360 | 509(B)0320 |
CLASS A CONCRETE | 130.2 | CY |
$1,200.00 |
$1,130.13 |
$900.00 |
$818.22 |
$1,500.00 |
| 370 | 511(A)2210 |
REINFORCING STEEL | 49,100 | LB |
$2.50 |
$1.43 |
$1.20 |
$1.37 |
$3.00 |
| 380 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 318 | LF |
$60.00 |
$66.02 |
$50.00 |
$50.53 |
$125.00 |
| 390 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 771 | LF |
$75.00 |
$88.33 |
$60.00 |
$62.74 |
$140.00 |
| 400 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 318 | LF |
$25.00 |
$7.43 |
$20.00 |
$25.00 |
$50.00 |
| 410 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 771 | LF |
$28.00 |
$9.65 |
$20.00 |
$23.00 |
$50.00 |
| 420 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 430 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 324 | LF |
$1,500.00 |
$1,013.95 |
$1,350.00 |
$1,179.00 |
$1,000.00 |
| 440 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$2,895.15 |
$4,500.00 |
$2,800.00 |
$3,500.00 |
| 450 | 518(B)0300 |
SEALED EXPANSION JOINTS | 35.17 | LF |
$400.00 |
$267.00 |
$290.00 |
$338.00 |
$400.00 |
| 460 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 200 | TON |
$100.00 |
$76.95 |
$75.00 |
$82.60 |
$175.00 |
| 470 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 100 | TON |
$75.00 |
$57.06 |
$58.00 |
$69.00 |
$150.00 |
| 480 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 64 | LF |
$42.00 |
$31.76 |
$40.00 |
$35.00 |
$30.00 |
| 490 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 115 | LF |
$45.00 |
$23.17 |
$40.00 |
$30.00 |
$30.00 |
| 500 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$75,565.22 |
$25,000.00 |
$28,000.00 |
$25,000.00 |
| 510 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,904 | SD |
$2.50 |
$0.1100 |
$0.1100 |
$0.7300 |
$1.50 |
| 520 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 264 | SD |
$3.50 |
$5.25 |
$5.50 |
$1.19 |
$0.0500 |
| 530 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,716 | SD |
$2.50 |
$0.2600 |
$0.2700 |
$1.07 |
$0.8000 |
| 540 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 4,224 | SD |
$1.00 |
$0.2600 |
$0.2700 |
$0.5400 |
$0.4000 |
| 550 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$300.00 |
$105.00 |
$110.00 |
$350.00 |
$50.00 |
| 560 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$500.00 |
$367.50 |
$375.00 |
$450.00 |
$300.00 |
| 570 | 853 5115 |
DELINEATORS(TYPE 2, CODE 1) | 14 | EA |
$50.00 |
$52.50 |
$55.00 |
$55.00 |
$20.00 |
| 580 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 5,280 | LF |
$2.50 |
$1.31 |
$1.37 |
$1.35 |
$1.80 |
| 590 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$55,000.00 |
$8,400.00 |
$8,800.00 |
$9,500.00 |
$10,000.00 |
| 600 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$2,625.00 |
$4,000.00 |
$3,000.00 |
$3,500.00 |
| 610 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$180,000.00 |
$102,112.50 |
$95,000.00 |
$104,500.00 |
$254,000.00 |