| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$70,000.00 |
$30,450.00 |
$40,000.00 |
$66,000.00 |
$27,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 18,541.19 | CY |
$20.00 |
$11.20 |
$13.75 |
$10.36 |
$8.25 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 500 | CY |
$22.00 |
$15.25 |
$30.00 |
$16.00 |
$14.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$81,200.00 |
$42,500.00 |
$29,000.00 |
$20,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,500 | LF |
$3.50 |
$2.80 |
$3.75 |
$3.49 |
$3.50 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 287 | LF |
$15.00 |
$15.25 |
$14.50 |
$29.50 |
$14.30 |
| 70 | 221(G)2800 |
TEMPORARY FIBER LOG | 2,292 | LF |
$8.00 |
$6.60 |
$5.50 |
$8.71 |
$5.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 95,894.71 | SY |
$3.00 |
$3.05 |
$3.75 |
$4.27 |
$3.50 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 19.81 | AC |
$1,100.00 |
$1,522.50 |
$1,500.00 |
$1,395.00 |
$1,500.00 |
| 100 | 303(A)1200 |
AGGREGATE BASE TYPE A | 606.36 | CY |
$70.00 |
$126.90 |
$110.00 |
$129.48 |
$125.00 |
| 110 | 307(K)4200 |
STABILIZED SUBGRADE | 52,043.52 | SY |
$7.00 |
$6.00 |
$6.00 |
$7.14 |
$7.60 |
| 120 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,923.22 | TON |
$50.00 |
$76.15 |
$58.40 |
$64.86 |
$71.25 |
| 130 | 407(B)7300 |
TACK COAT | 3,650 | GAL |
$4.50 |
$4.90 |
$5.50 |
$3.65 |
$5.00 |
| 140 | 408 8100 |
PRIME COAT | 18,820.46 | GAL |
$4.50 |
$4.90 |
$5.25 |
$4.37 |
$4.25 |
| 150 | 411(B)1340 |
SUPERPAVE, TYPE S3(PG 58-28 OK) | 13,674.59 | TON |
$135.00 |
$93.75 |
$102.00 |
$143.62 |
$140.00 |
| 160 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 5,213.39 | TON |
$145.00 |
$111.15 |
$122.00 |
$160.68 |
$160.00 |
| 170 | 412 3100 |
COLD MILLING PAVEMENT | 36,857.71 | SY |
$3.50 |
$3.90 |
$2.45 |
$6.02 |
$9.00 |
| 180 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 8.56 | CY |
$90.00 |
$101.50 |
$50.00 |
$49.00 |
$50.00 |
| 190 | 501(G)1810 |
CLSM BACKFILL | 20 | CY |
$210.00 |
$203.00 |
$200.00 |
$595.00 |
$200.00 |
| 200 | 509(A)0200 |
CLASS AA CONCRETE | 41.47 | CY |
$600.00 |
$822.45 |
$885.00 |
$976.00 |
$885.00 |
| 210 | 509(B)0300 |
CLASS A CONCRETE | 232 | CY |
$380.00 |
$507.50 |
$445.00 |
$739.50 |
$445.00 |
| 220 | 509(D)0500 |
CLASS C CONCRETE | 50 | CY |
$380.00 |
$542.00 |
$500.00 |
$637.00 |
$500.00 |
| 230 | 511(A)2200 |
REINFORCING STEEL | 28,029.28 | LB |
$1.50 |
$1.95 |
$1.50 |
$1.61 |
$1.50 |
| 240 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 5 | TON |
$90.00 |
$208.10 |
$125.00 |
$135.00 |
$114.00 |
| 250 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 1,742.89 | SY |
$90.00 |
$103.55 |
$88.00 |
$87.00 |
$93.70 |
| 260 | 610(G)5800 |
ASPHALT DRIVEWAY | 433.07 | TON |
$140.00 |
$188.45 |
$205.00 |
$281.70 |
$500.00 |
| 270 | 611(G)0354 |
INLET (SMD-TYPE 2) | 3 | EA |
$7,000.00 |
$6,597.50 |
$6,115.00 |
$3,100.00 |
$3,000.00 |
| 280 | 613(A)5220 |
30" R.C.PIPE CLASS III | 56 | LF |
$175.00 |
$228.40 |
$136.65 |
$265.00 |
$245.00 |
| 290 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 212 | LF |
$100.00 |
$126.90 |
$93.75 |
$166.00 |
$156.00 |
| 300 | 613(A)5366 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 112 | LF |
$195.00 |
$253.75 |
$182.70 |
$292.00 |
$272.00 |
| 310 | 613(A)5370 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 85 | LF |
$220.00 |
$355.25 |
$239.00 |
$445.00 |
$425.00 |
| 320 | 613(B)5600 |
17" X 13" CORR. GALV. STEEL PIPE ARCH | 873 | LF |
$55.00 |
$55.85 |
$78.15 |
$72.50 |
$68.50 |
| 330 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 262 | LF |
$60.00 |
$76.15 |
$66.75 |
$77.25 |
$73.25 |
| 340 | 613(B)5680 |
PVC DRAINAGE STRUCTURE | 9 | EA |
$7,200.00 |
$5,075.00 |
$8,225.00 |
$7,400.00 |
$10,700.00 |
| 350 | 613(EE)5969 |
18" CORRUGATED POLYPROPYLENE PIPE | 1,345 | LF |
$70.00 |
$60.90 |
$100.00 |
$94.91 |
$110.00 |
| 360 | 613(L)6600 |
17" X 13" PREFAB. CULVERT END SEC., ARCH | 44 | EA |
$260.00 |
$507.50 |
$1,010.00 |
$427.50 |
$450.00 |
| 370 | 613(L)6608 |
21" X 15" PREFAB. CULVERT END SEC., ARCH | 10 | EA |
$300.00 |
$507.50 |
$1,125.00 |
$495.00 |
$460.00 |
| 380 | 613(L)6612 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 7 | EA |
$1,400.00 |
$1,522.50 |
$2,060.00 |
$1,545.00 |
$1,106.00 |
| 390 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 7 | EA |
$700.00 |
$2,283.75 |
$1,275.00 |
$1,420.00 |
$481.50 |
| 400 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$4,000.00 |
$3,552.50 |
$3,230.00 |
$2,670.00 |
$2,025.00 |
| 410 | 613(M)6908 |
TYPE C3 CULVERT END TREATMENT | 2 | EA |
$3,800.00 |
$4,313.75 |
$2,685.00 |
$2,400.00 |
$2,685.00 |
| 420 | 613(M)6924 |
TYPE BB3 CULVERT END TREATMENT | 2 | EA |
$5,000.00 |
$4,567.50 |
$3,070.00 |
$3,250.00 |
$3,075.00 |
| 430 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 2 | EA |
$4,000.00 |
$4,060.00 |
$2,430.00 |
$2,320.00 |
$2,435.00 |
| 440 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$65,000.00 |
$50,750.00 |
$36,400.00 |
$34,000.00 |
$32,000.00 |
| 450 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 898.78 | SY |
$20.00 |
$10.15 |
$11.85 |
$15.70 |
$13.75 |
| 460 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 1,357.33 | SY |
$15.00 |
$12.20 |
$11.85 |
$14.70 |
$13.00 |
| 470 | 619(B)6412 |
REMOVAL OF RAILROAD | 80 | LF |
$50.00 |
$111.65 |
$98.00 |
$74.00 |
$62.00 |
| 480 | 619(C)6600 |
SAWING PAVEMENT | 238 | LF |
$10.00 |
$1.75 |
$4.00 |
$9.00 |
$9.00 |
| 490 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 274 | LF |
$30.00 |
$45.68 |
$47.50 |
$51.20 |
$45.00 |
| 500 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,534 | LF |
$10.00 |
$10.40 |
$7.25 |
$7.00 |
$7.00 |
| 510 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,988 | LF |
$12.00 |
$8.65 |
$10.30 |
$13.20 |
$10.00 |
| 520 | 629(D)7500 |
REMOVE AND RESET MAILBOX | 22 | EA |
$60.00 |
$101.50 |
$250.00 |
$457.00 |
$250.00 |
| 530 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 80 | CY |
$18.00 |
$11.20 |
$15.00 |
$29.00 |
$15.00 |
| 540 | 202(D)2510 |
UNCLASSIFIED BORROW | 20 | CY |
$40.00 |
$15.25 |
$30.00 |
$59.00 |
$50.00 |
| 550 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 33.22 | CY |
$38.00 |
$55.85 |
$50.00 |
$47.00 |
$50.00 |
| 560 | 509(A)0210 |
CLASS AA CONCRETE | 84.8 | CY |
$1,000.00 |
$969.35 |
$846.50 |
$972.00 |
$845.50 |
| 570 | 511(A)2210 |
REINFORCING STEEL | 7,522.25 | LB |
$1.40 |
$1.95 |
$1.50 |
$1.68 |
$1.50 |
| 580 | 601(A)1110 |
TYPE I PLAIN RIPRAP | 90 | TON |
$75.00 |
$137.00 |
$125.00 |
$89.00 |
$114.00 |
| 590 | 602(B)2320 |
REVETMENT MATTRESS | 297 | SY |
$130.00 |
$168.50 |
$130.00 |
$155.00 |
$150.00 |
| 600 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$5,000.00 |
$8,932.00 |
$10,000.00 |
$31,000.00 |
$10,000.00 |
| 610 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 10 | DAY |
$1,200.00 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
| 620 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 82.01 | SF |
$30.00 |
$40.60 |
$41.00 |
$110.00 |
$40.00 |
| 630 | 853 5125 |
DELINEATORS(TYPE 2, CODE 3) | 12 | EA |
$45.00 |
$25.40 |
$26.00 |
$39.00 |
$25.00 |
| 640 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 8,780.25 | LF |
$2.50 |
$1.30 |
$1.35 |
$0.9000 |
$1.25 |
| 650 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 77 | LF |
$20.00 |
$10.15 |
$10.30 |
$19.70 |
$10.00 |
| 660 | 856(B)8311 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(SYMBOLS) | 2 | EA |
$1,100.00 |
$1,218.00 |
$1,250.00 |
$1,630.00 |
$1,200.00 |
| 670 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 21 | SD |
$50.00 |
$10.15 |
$10.30 |
$1.08 |
$10.00 |
| 680 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,240 | SD |
$0.4000 |
$1.05 |
$1.10 |
$4.45 |
$1.00 |
| 690 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,832 | SD |
$1.20 |
$0.2500 |
$0.2700 |
$0.0400 |
$0.2500 |
| 700 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 84 | SD |
$2.00 |
$5.10 |
$5.10 |
$45.00 |
$50.00 |
| 710 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 4,752 | SD |
$0.1000 |
$0.2500 |
$0.2700 |
$0.3400 |
$0.2500 |
| 720 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 10,575 | SD |
$0.3500 |
$0.2500 |
$0.2700 |
$0.2400 |
$0.2500 |
| 730 | 880(F)6700 |
DRUMS | 714 | SD |
$1.50 |
$1.05 |
$1.03 |
$3.27 |
$1.00 |
| 740 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 90 | SD |
$14.00 |
$25.40 |
$26.00 |
$12.00 |
$25.00 |
| 750 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$40,000.00 |
$66,990.00 |
$10,000.00 |
$74,000.00 |
$120,000.00 |
| 760 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$30,000.00 |
$7,612.50 |
$5,000.00 |
$4,500.00 |
$35,000.00 |
| 770 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$350,000.00 |
$335,000.00 |
$260,000.00 |
$335,000.00 |
$975,000.00 |