| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$12,500.00 |
$10,500.00 |
$10,815.00 |
$17,250.00 |
$10,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,933 | CY |
$10.00 |
$13.35 |
$12.50 |
$12.00 |
$12.36 |
$14.30 |
$20.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 404 | CY |
$13.00 |
$19.00 |
$15.50 |
$15.00 |
$15.45 |
$18.05 |
$30.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$17,000.00 |
$8,500.00 |
$8,500.00 |
$8,755.00 |
$8,550.00 |
$10,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,510 | LF |
$3.50 |
$7.00 |
$4.40 |
$2.65 |
$4.12 |
$4.40 |
$3.20 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 252 | LF |
$15.00 |
$32.34 |
$17.00 |
$14.50 |
$15.45 |
$16.50 |
$20.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 3,733 | SY |
$3.50 |
$8.17 |
$3.90 |
$3.25 |
$3.60 |
$4.20 |
$4.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 1 | AC |
$1,500.00 |
$2,572.50 |
$3,005.00 |
$2,500.00 |
$3,090.00 |
$1,500.00 |
$2,500.00 |
| 90 | 307(K)4200 |
STABILIZED SUBGRADE | 5,082 | SY |
$8.50 |
$9.25 |
$11.00 |
$8.00 |
$13.39 |
$10.00 |
$11.00 |
| 100 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 25 | TON |
$50.00 |
$100.00 |
$67.75 |
$50.00 |
$51.50 |
$67.00 |
$60.00 |
| 110 | 407(B)7300 |
TACK COAT | 891 | GAL |
$4.00 |
$7.26 |
$3.70 |
$3.00 |
$7.47 |
$3.00 |
$4.00 |
| 120 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 317 | TON |
$120.00 |
$164.28 |
$165.62 |
$150.00 |
$169.20 |
$171.00 |
$165.00 |
| 130 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,988 | TON |
$110.00 |
$138.11 |
$147.56 |
$136.00 |
$142.25 |
$154.00 |
$150.00 |
| 140 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 208 | TON |
$130.00 |
$184.31 |
$189.00 |
$171.00 |
$189.83 |
$194.00 |
$185.00 |
| 150 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 283 | TON |
$130.00 |
$184.31 |
$180.00 |
$161.00 |
$189.83 |
$182.00 |
$180.00 |
| 160 | 619(B)6352 |
REMOVAL OF FENCE | 1,018 | LF |
$2.00 |
$3.53 |
$2.00 |
$3.00 |
$3.09 |
$1.65 |
$2.00 |
| 170 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 3,322 | SY |
$7.50 |
$7.57 |
$10.52 |
$3.50 |
$3.60 |
$11.75 |
$9.00 |
| 180 | 619(C)6600 |
SAWING PAVEMENT | 50 | LF |
$3.50 |
$7.64 |
$16.00 |
$5.00 |
$5.15 |
$16.00 |
$8.00 |
| 190 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 520 | LF |
$10.50 |
$9.88 |
$11.00 |
$8.10 |
$6.18 |
$6.60 |
$8.00 |
| 200 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 378 | LF |
$10.00 |
$10.35 |
$12.00 |
$8.10 |
$6.69 |
$7.15 |
$8.00 |
| 210 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$240.00 |
$262.50 |
$130.00 |
$85.00 |
$87.55 |
$100.00 |
$300.00 |
| 220 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$150.00 |
$105.00 |
$75.00 |
$200.00 |
$206.00 |
$50.00 |
$150.00 |
| 230 | 629(E)7600 |
MAILBOX | 1 | EA |
$100.00 |
$63.00 |
$220.00 |
$50.00 |
$51.50 |
$200.00 |
$100.00 |
| 240 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 820 | CY |
$14.00 |
$15.00 |
$14.00 |
$12.00 |
$32.96 |
$28.00 |
$25.00 |
| 250 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 300 | CY |
$40.00 |
$30.00 |
$21.00 |
$20.00 |
$51.50 |
$22.93 |
$165.00 |
| 260 | 509(A)0210 |
CLASS AA CONCRETE | 340 | CY |
$250.00 |
$655.00 |
$849.70 |
$1,098.00 |
$944.51 |
$815.00 |
$1,200.00 |
| 270 | 511(A)2210 |
REINFORCING STEEL | 58,800 | LB |
$1.45 |
$1.05 |
$1.42 |
$1.00 |
$1.55 |
$1.40 |
$2.00 |
| 280 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$33,075.00 |
$62,000.00 |
$22,500.00 |
$11,208.97 |
$29,000.00 |
$15,000.00 |
| 290 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 3 | EA |
$170.00 |
$183.75 |
$84.00 |
$50.00 |
$51.50 |
$75.00 |
$220.00 |
| 300 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 8.7 | SF |
$60.00 |
$131.25 |
$54.00 |
$25.00 |
$25.75 |
$50.00 |
$150.00 |
| 310 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 22 | LF |
$12.00 |
$16.80 |
$11.00 |
$10.00 |
$10.30 |
$10.00 |
$20.00 |
| 320 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 6,800 | LF |
$1.10 |
$1.48 |
$1.33 |
$0.6500 |
$0.6700 |
$1.38 |
$2.00 |
| 330 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$185.00 |
$105.79 |
$130.00 |
$100.00 |
$103.00 |
$126.50 |
$100.75 |
| 340 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 8,400 | LF |
$0.3000 |
$0.5600 |
$0.2700 |
$0.1000 |
$0.1000 |
$0.3300 |
$0.6500 |
| 350 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 5,600 | LF |
$0.5000 |
$0.8600 |
$0.1100 |
$0.1000 |
$0.1000 |
$0.1100 |
$1.00 |
| 360 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 680 | SD |
$18.45 |
$9.98 |
$6.57 |
$5.00 |
$5.15 |
$6.60 |
$9.50 |
| 370 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 2,000 | LF |
$32.00 |
$18.72 |
$28.20 |
$24.00 |
$20.60 |
$29.00 |
$21.00 |
| 380 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,400 | LF |
$5.00 |
$3.05 |
$3.72 |
$3.00 |
$4.12 |
$3.85 |
$4.00 |
| 390 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,200 | SD |
$0.7000 |
$0.0200 |
$0.1200 |
$0.5000 |
$0.5100 |
$0.1100 |
$0.0200 |
| 400 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,420 | SD |
$1.05 |
$8.40 |
$0.1200 |
$1.00 |
$1.03 |
$0.1100 |
$8.00 |
| 410 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,600 | SD |
$1.80 |
$0.0200 |
$0.1200 |
$1.50 |
$1.54 |
$0.1100 |
$0.0200 |
| 420 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 320 | SD |
$1.55 |
$8.40 |
$0.1200 |
$1.00 |
$1.03 |
$0.1100 |
$8.00 |
| 430 | 880(C)6420 |
WING BARRICADES | 720 | SD |
$0.5000 |
$0.0200 |
$0.1100 |
$0.5000 |
$0.5100 |
$0.1100 |
$0.0200 |
| 440 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 640 | SD |
$0.7500 |
$5.78 |
$7.68 |
$1.50 |
$1.54 |
$14.00 |
$5.50 |
| 450 | 880(F)6700 |
DRUMS | 4,200 | SD |
$0.4000 |
$0.1100 |
$0.0700 |
$0.4500 |
$0.4600 |
$0.0600 |
$0.1400 |
| 460 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$20.00 |
$10.50 |
$5.44 |
$18.00 |
$18.54 |
$5.50 |
$10.00 |
| 470 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$14,500.00 |
$5,000.00 |
$5,150.00 |
$29,150.00 |
$15,000.00 |
| 480 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 13,513 | CY |
$10.00 |
$13.35 |
$10.41 |
$12.00 |
$12.36 |
$14.00 |
$20.00 |
| 490 | 202(D)2500 |
UNCLASSIFIED BORROW | 686 | CY |
$13.00 |
$19.00 |
$12.00 |
$15.00 |
$15.45 |
$14.10 |
$30.00 |
| 500 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$17,000.00 |
$12,000.00 |
$10,500.00 |
$10,815.00 |
$15,450.00 |
$15,000.00 |
| 510 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,810 | LF |
$3.50 |
$6.56 |
$4.50 |
$2.65 |
$4.12 |
$4.40 |
$4.00 |
| 520 | 221(E)2600 |
TEMPORARY SILT DIKE | 448 | LF |
$15.00 |
$30.32 |
$17.00 |
$14.50 |
$15.45 |
$16.50 |
$20.00 |
| 530 | 230(A)7200 |
SOLID SLAB SODDING | 13,807 | SY |
$3.50 |
$7.66 |
$4.00 |
$3.25 |
$3.60 |
$4.20 |
$4.00 |
| 540 | 233(A)0200 |
VEGETATIVE MULCHING | 3 | AC |
$1,500.00 |
$2,701.13 |
$3,001.00 |
$2,500.00 |
$3,090.00 |
$1,500.00 |
$2,500.00 |
| 550 | 307(K)4200 |
STABILIZED SUBGRADE | 11,369 | SY |
$8.50 |
$9.25 |
$11.00 |
$8.00 |
$13.39 |
$10.00 |
$11.00 |
| 560 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 96 | TON |
$50.00 |
$100.00 |
$51.25 |
$50.00 |
$51.50 |
$67.00 |
$50.00 |
| 570 | 407(B)7300 |
TACK COAT | 2,080 | GAL |
$4.00 |
$7.26 |
$3.70 |
$3.00 |
$7.47 |
$3.00 |
$4.00 |
| 580 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 712 | TON |
$120.00 |
$164.28 |
$162.58 |
$150.00 |
$169.20 |
$172.00 |
$165.00 |
| 590 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,943 | TON |
$110.00 |
$138.11 |
$148.65 |
$136.00 |
$142.25 |
$153.50 |
$155.00 |
| 600 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 467 | TON |
$130.00 |
$184.31 |
$184.68 |
$171.00 |
$189.83 |
$195.00 |
$185.00 |
| 610 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 679 | TON |
$130.00 |
$184.31 |
$173.88 |
$161.00 |
$189.83 |
$185.00 |
$175.00 |
| 620 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 48 | CY |
$30.00 |
$33.08 |
$28.00 |
$20.00 |
$51.50 |
$28.00 |
$20.00 |
| 630 | 509(A)0200 |
CLASS AA CONCRETE | 55 | CY |
$800.00 |
$812.00 |
$790.00 |
$1,102.00 |
$824.00 |
$930.00 |
$1,000.00 |
| 640 | 511(A)2200 |
REINFORCING STEEL | 7,940 | LB |
$1.50 |
$1.06 |
$1.60 |
$1.00 |
$2.06 |
$1.42 |
$2.00 |
| 650 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 60 | LF |
$60.00 |
$68.93 |
$48.00 |
$43.00 |
$56.65 |
$66.00 |
$100.00 |
| 660 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 122 | LF |
$74.00 |
$50.36 |
$67.50 |
$54.00 |
$80.34 |
$72.00 |
$110.00 |
| 670 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 30 | LF |
$98.00 |
$113.91 |
$88.00 |
$67.00 |
$91.67 |
$97.00 |
$155.00 |
| 680 | 613(B)5552 |
72" CORR. GALV. STEEL PIPE | 135 | LF |
$215.00 |
$426.59 |
$243.46 |
$136.00 |
$208.06 |
$180.00 |
$215.00 |
| 690 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$1,090.00 |
$412.72 |
$550.00 |
$585.00 |
$772.50 |
$425.00 |
$1,500.00 |
| 700 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,750.00 |
$1,164.24 |
$1,250.00 |
$1,245.00 |
$1,030.00 |
$1,150.00 |
$2,400.00 |
| 710 | 613(L)6752 |
72" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$5,000.00 |
$4,312.00 |
$5,156.00 |
$4,372.00 |
$1,545.00 |
$4,750.00 |
$7,000.00 |
| 720 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$2,500.00 |
$2,756.25 |
$2,950.00 |
$5,236.00 |
$3,090.00 |
$1,880.00 |
$2,000.00 |
| 730 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$12,320.00 |
$9,000.00 |
$15,500.00 |
$15,965.00 |
$12,000.00 |
$10,000.00 |
| 740 | 619(B)6352 |
REMOVAL OF FENCE | 1,845 | LF |
$2.00 |
$3.70 |
$2.00 |
$3.50 |
$3.60 |
$1.65 |
$2.00 |
| 750 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 7,520 | SY |
$7.50 |
$7.93 |
$10.57 |
$4.00 |
$4.12 |
$9.25 |
$10.00 |
| 760 | 619(C)6600 |
SAWING PAVEMENT | 100 | LF |
$3.50 |
$8.01 |
$8.90 |
$5.00 |
$5.15 |
$9.05 |
$8.00 |
| 770 | 624(C)3400 |
FENCE-STYLE SWF (4 BARBED WIRE) | 608 | LF |
$10.50 |
$10.35 |
$8.90 |
$8.10 |
$6.18 |
$6.60 |
$13.00 |
| 780 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,309 | LF |
$10.00 |
$10.84 |
$9.40 |
$8.10 |
$6.69 |
$7.15 |
$14.00 |
| 790 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 2,670 | CY |
$14.00 |
$13.35 |
$12.00 |
$10.00 |
$20.60 |
$17.50 |
$25.00 |
| 800 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 520 | CY |
$40.00 |
$30.00 |
$18.00 |
$20.00 |
$51.50 |
$22.75 |
$25.00 |
| 810 | 509(A)0210 |
CLASS AA CONCRETE | 691 | CY |
$850.00 |
$571.00 |
$670.01 |
$826.00 |
$738.51 |
$765.00 |
$1,200.00 |
| 820 | 511(A)2210 |
REINFORCING STEEL | 106,950 | LB |
$1.45 |
$1.06 |
$1.40 |
$1.00 |
$1.56 |
$1.38 |
$2.00 |
| 830 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$27,562.50 |
$31,000.00 |
$22,500.00 |
$9,499.17 |
$35,500.00 |
$15,000.00 |
| 840 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 6 | EA |
$170.00 |
$183.75 |
$90.00 |
$50.00 |
$51.50 |
$75.00 |
$225.00 |
| 850 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 14.7 | SF |
$60.00 |
$105.00 |
$54.00 |
$25.00 |
$25.75 |
$50.00 |
$120.00 |
| 860 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 22 | LF |
$12.00 |
$16.80 |
$11.00 |
$10.00 |
$10.30 |
$10.00 |
$20.00 |
| 870 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 8,780 | LF |
$1.10 |
$1.26 |
$1.33 |
$0.6500 |
$0.6700 |
$1.38 |
$1.50 |
| 880 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 180 | SD |
$185.00 |
$105.79 |
$125.00 |
$100.00 |
$103.00 |
$126.50 |
$100.75 |
| 890 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 7,800 | LF |
$0.3000 |
$0.5600 |
$0.2800 |
$0.1000 |
$0.1000 |
$0.2800 |
$0.6500 |
| 900 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 4,400 | LF |
$0.5000 |
$1.10 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1100 |
$1.30 |
| 910 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,080 | SD |
$0.7000 |
$0.0200 |
$0.1200 |
$0.5000 |
$0.5100 |
$0.1100 |
$0.0200 |
| 920 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,280 | SD |
$1.05 |
$6.30 |
$0.1200 |
$1.00 |
$1.03 |
$0.1100 |
$6.00 |
| 930 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,960 | SD |
$1.80 |
$0.0200 |
$0.1100 |
$1.50 |
$1.54 |
$0.1100 |
$0.0200 |
| 940 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 820 | SD |
$1.55 |
$1.84 |
$1.10 |
$1.00 |
$1.03 |
$1.10 |
$1.75 |
| 950 | 880(C)6420 |
WING BARRICADES | 720 | SD |
$0.5000 |
$0.0200 |
$0.1200 |
$1.00 |
$1.03 |
$0.1100 |
$0.0200 |
| 960 | 880(D)6500 |
VERTICAL PANELS | 6,000 | SD |
$0.3100 |
$0.0200 |
$0.1100 |
$0.2500 |
$0.2500 |
$0.1100 |
$0.0200 |
| 970 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 1,640 | SD |
$0.7500 |
$5.25 |
$7.80 |
$0.3500 |
$0.3600 |
$14.00 |
$5.00 |
| 980 | 880(F)6700 |
DRUMS | 8,800 | SD |
$0.4000 |
$0.0200 |
$0.0700 |
$0.4500 |
$0.4600 |
$0.0600 |
$0.0200 |
| 990 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$20.00 |
$8.40 |
$5.45 |
$18.00 |
$18.54 |
$5.50 |
$8.00 |
| 1,000 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$150,000.00 |
$48,300.00 |
$27,000.00 |
$25,000.00 |
$25,750.00 |
$30,000.00 |
$28,000.00 |
| 1,010 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$8,925.00 |
$3,500.00 |
$2,000.00 |
$3,090.00 |
$8,250.00 |
$3,500.00 |
| 1,020 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$170,000.00 |
$150,000.00 |
$375,800.00 |
$137,917.78 |
$190,000.00 |
$358,000.00 |